Loading...
HomeMy WebLinkAboutStrand Associates (Consulting Services for Long-Term Control Plan Implementation of Post Construction Monitoring) City of Jeffersonville Government Contract Coversheet Please note: All information MUST be completely filled out and submitted to Clerk's Office within 48 hrs of execution. Date Submitted to Clerk: 3/8/2024 Wastewater Department: Vendor Name: Strand Associates Sign Date: 3/7/22024 Ending Date: 12/31/2024 Amount of Original Contract: $50,000 Is this an amendment or change order to original contract? Amended Contract Amount:_ Purpose: Provide Consulting services for Long-Term Control Plan Implementation of Post Construction Monitoring. For Clerk's Office to fill out Date uploaded to Gateway: — ///al Strand Associates, Inc!' 325 West Main Street, Suite 710 1111114:1111111,1f Louisville, KY 40202 (P)502.583.7020 STRAND www.strand.com ASSOCIATES' !:rcolio,"e•!n 1.. yvre.•r;ny.. Task Order No, 24-01 City of Jeffersonville, Indiana(OWNER) and Strand Associates, Inc.'(ENGINEER) Pursuant to Agreement for Technical Services dated January 20,2022 Project Information Services Name: Combined Sewer Overflow(CSO) Long Term Control flan (LTCP) Post-Construction Compliance Monitoring(PCCM). Services Description: ENGINEER will perform CSO LTCP PCCM including reviewing CSO flow data measured from March 28, 2023, (when the CSO storage interceptor became fully operational) to December3I,2023;updating the XPSWMM model:simulating the rainfall events from March 28,2023, to December 31, 2023; comparing modeled CS() discharges with measured CSO discharges; and preparing a report. Scope of Services ENGINEER will provide the following services to OWNER: 1. Attend one project kickoff meeting with OWNER. 2. Attend up to three progress meetings with OWNER. 3. Review the 2023 rainfall and CSO flow data collected by OWNER. 4. Compare and summarize the CSO flow data measured by the flow meters with the CSO flow data measured by the CSO storage interceptor supervisory control and data acquisition(SCADA) system. Recalculate the Flow data measured by the CSO storage interceptor SCADA system from March 28,2023, to October 12, 2023, (when the CS() flow calculation formulas were inserted in the ('SO storage interceptor SCADA system). II'the data are significantly different, obtain flow meter installation and programming information from OWNER and review the information to evaluate potential explanations for the discrepancies. Field services, including confined space entries, are not included in this Task Order. 5. Review available intimation from OWNER regarding the discovery of additional weir walls found in the combined sewer system. The weir ‘‘'alls appear to be directing where dry weather flows go at locations where flow can go in more than one direction.Assist OWNER in evaluating whether to update the XPSWMM model with the additional weir walls. Update the model as directed by OWNER. 6. Review the implementation schedules, as-built drawings, and other available information from OWNER for the projects listed below. Integrate projects that were completed before March 28,2023, into the XPSWMM model. For projects in progress alter March 28, 2023, integrate projects into the model chronologically and create models corresponding to each set of IUII dm'I(I((I,Domenutts'A111RY1.MbJJdklloll\iIIC.(Ili t4(IN1\r45Q'_'1t1Q(r 4'i"d4 t,4"24+r1 dine V1!: 01,l rWi1 j r-:1'lnt:i�y !Mk) I I,'I III I;;:;uo j io Xis Wr3consi i Strand Associates, Inc.`:, City orJef eisonville Task Order No. 24-01 Page 2 March 5, 2024 combined sewer system conditions that existed during each rainfall event from March 28,2023, to December 3I,2023. a. Eighth Street Phase 2 Stormwater Separation (estimated in model). b. Eighth Street Underground Stormwater Detention Basin(estimated in model). c. CSO Storage Interceptor(estimated in model). d. Wall Street Outfall Upgrade(estimated in model). e. CSO Storage Interceptor CSO Slide Gate Settings(estimated in model). CSO Storage Interceptor Sluice Gate Settings(estimated in model). g. Maple Street Sewer Lining. h. Market Street Sewer Lining. 7. Review the Tenth Street Lill Station pump maintenance schedule collected by OWNER and effluent flow data collected by OWNER on the 24-inch and 36-inch force mains from March 28, 2023, to December 31, 2023. Assist OWNER in evaluating how to use the data to characterize the Tenth Street lilt station capacity in the XPSWMM model that existed during each rainfall event. Update the model as directed by OWNER. 8. Simulate the rainfall events from March 28,2023, to December 31,2023, using the XPSWMM model that corresponds to the collection system conditions that existed during each rainfall event. �). Compare and summarize the CSO discharge data collected by OWNER with the CSO discharge data generated by the XPSWMM model. I D. Prepare and submit a draft report to OWNER for review. I I. Integrate OWNER comments,as appropriate. Prepare and submit final report. 12. Summarize the CSO storage interceptor surcharging measured by the CSO storage interceptor SCADA system from March 28, 2023, to December 31, 2023. Assist OWNER in evaluating when and how to update the('SO slide gate settings to reduce CSO discharge at the Spring Street • CSO near the overlook, reduce total CSO.and increase CSO storage capacity. 13. Review and summarize the programming of the pumps and influent grit removal slide gates at the Tenth Street I.ift Station.Assist OWNER in evaluating up to two options to potentially reduce existing operational deficiencies. 14. Assist OWNER with review of current CSO storage interceptor SCADA alarm settings for potential reprogramming. Compensation OWNER shall compensate ENGINEER for Services under this Task Order on an hourly rate basis plus expenses an estimated lee of$65.000. lull elm K I.I)1'11...n...11. 1k11 i.nvillc, rs 21122 1'I>!.121`.SV.I.1.(sit,i l-U1 Jul www.strand.com Strand Associates, Inc:" City ol•JetTersonville Task Order No. 24-01 Page 3 March 5, 2024 Schedule Services will begin upon execution of this Task Order, which is anticipated the week of March 4, 2024. Services are scheduled tier completion on June 30,2025. TASK ORDER AUTHORIZATION AND ACCEPTANCE: ENGINEER: OWNER: STRAND ASSOCIATES, INC.' CITY OF RSON IFr..A.eL- Jost'; . Bunker /DGte Michael oore Date Corporate Secretary Mayor II)11 rIn It ill Ii.um.nt,\r•.i:.mat,I!di", dlc l'iq ul'iINI'.I'ti M 1"IX) O'I °I Lk, www.strand.com