HomeMy WebLinkAboutCHANGE ORDER 11 A1A Document G701 - 2001 Change Order OWNER 0 Mayor Mike Moore ARCHITECT 0 file 1834.01/F-I I CONTRACTOR 0 Cristiani Excavating Co.,Inc FIELD 0 PROJECT: Chapel Lake Park CHANGE ORDER NUMBED 9 City of Jeffersonville Jeffersonville,IN DATE: September 24,2019 TO CONTRACTOR: ARCHITECT'S PROJECT NUMBER: 1834.01 Cristiani Excavating Co.,Inc 1221 Old Hwy.31 E. CONTRACT DATE: December 19.2018 Clarksville,IN 47130 CONTRACT FOR: General Construction THE CONTRACT IS CHANGED AS FOLLOWS: See attached summary sheet The original Contract Sum was $3.229.000.00 The net change by previously authorized Change Orders $989,458.00 The Contract Sum prior to this Change Order in the amount of $4,218,458.00 The Contract Sum will be incrcascd dec-reesed unchanged by this Change Order in the amount of The new Contract Sum including this Change Order will be $4,218,458.00 The Contract Time will be t e eed deer-eeeed unchanged by 0 days The date of Substantial Completion prior to this Change Order was May I.2020 The date of Substantial Completion as of the date of this Change Order therefore is May I.2020 NOTE This Change Order does not include changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supercede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. Kovert Hawkins Architects Cristiani Excavating Co,Inc Board of Public Works,City of Jeffersonville ARCHITECT CONTRACTOR OWNER 630 Walnut Street 1221 Old Hwy.31 E. 500 Quarterm ter Ct Jeffersonville,IN 47130 Clarksville,IN 47130 Jeffersonville, 713 r ADDRESS ADDRESS ADDRESS / /6)/1Cti-761,, -h/l-W---------- , /IA) (904...".--.--- BY BY J/ BY 1, Brendan T.Brown,AIA Derek Misch Mayor Mike M ore Name Name JI Name 24-Se -I9 9 /07.L1 Date Date t Date AIA DOCUMENT G70I -2001.Copyright© 1979. 1987,2000 and 2001 by The American Institute of Architects. All rights reserved. AIA License Number 109187 Change Order 11 -Contingency Summary: Item Description Amount RFP # Claim# 1 Base board heater in Maintenance Room at Shelter for full year use 1,975.00 9 CP-19 (in lieu of winterization) Subtotal 1,975.00 Adjust Contingency Allowance (1,975.00) Adjustment to Overall Contract Sum 0.00 Contingency Allowance Adjustment Log Original Contingency Amount/Cash Allowance 100,000.00 Adjustment to Contingency Allowance from Previous Change Orders (94,066.80) Adjustment to Contingency Allowance this Change Order (1,975.00) Balance Remaining in Contingency Allowance 3,958.20 Change Order 11 -Cash Allowance Summary: Item Description Amount RFP # Claim# 1 Park Entrance Sign & Structure 59,379.00 NA CP-18 Subtotal 59,379.00 Adjust Cash Allowance (59,379.00) Adjustment to Overall Contract Sum 0.00 Contingency Allowance Adjustment Log Original Cash Allowances 110,000.00 Adjustment to Cash Allowances from Previous Change Orders (50,000.00) Adjustments to Cash Allowances this Change Order (59,379.00) Balance Remaining in Cash Allowances 621.00 Change Order 11 -Contract Summary: Item Description Amount RFP# Claim# Subtotal 0.00 Total Adjustment to Contract Sum 0.00 Contingency Allowance Adjustment Log Original Contract Sum 3,229,000.00 Adjustment to Contract Sum from Previous Change Orders 989,458.00 Contract Sum Amount Prior to this Change Order 4,218,458.00 Adjustment to Contract Sum this Change Order 0.00 New Contract Sum 4,218,458.00 1971 - Present DAN CRISSIIANI EXCA VA 1 I TC CO, INC 1221 Old H 48 �' 31E YEARS OF P. O. Box 2427 EXCELLENCE Clarksville, IN 47131-2427 Dan Cristiana PHONE (812)282-9866 Fax (812)282-9908 ExcavatingCo.,Inc. Project: Chapel Lake Park New City Park ICP-19 I Jeffersonville, IN Reduction to To: Kovert Hawkins Architects Contingency Attn: Mr. Brendan Brown, AIA Allowance 630 Walnut St. Jeffersonville, IN 47130 Brendan.brown@koverthawkins.com Subject: RFP No. KHA-009 Date: August 29,2019 Electric Baseboard Heater in Maintenance 104 of Shelter Building: -Furnish and install (1) Electric Baseboard Heater with operable installation (1-Q mark CB1500 Baseboard Heater 70", 1500w, 120/1 with integral stat and disconnect) -Replace SPARE circuit S-18 with single pole,20A, 1500 Watts, wire size 12 TOTAL: $1,975.00 *Above revisions based on RFP-09 and B-101-8 drawings Prepared By: -.\ 1( gnature Derek Misch Project Manager Dan Cristiani Excavating Co., Inc. Cell: (574)870-0235 Email: derek@dcexc.com Page 1 of 1. Present DAN C_RISTIANI_E'XCAVATING CO INC. 1221 Old Hwy. 31E ¢8 YEARS OF P. O. Box 2427 EXCELLENCE Clarksville, IN 47.131-2427 Dan Cristiani PHONE (812)282-9866 Fax (812)282-9908 Excavating Co.,Inc Project: Chapel Lake Park ICP-18 I New City Park Jeffersonville, IN Reduction to To: Kovert Hawkins Architects Cash Attu:John Hawkins, AIA Allowance 630 Walnut St. Jeffersonville,IN 47130 john.hawkins@koverthawkins.coin Subject: RFP No. DC-014 Date: August 28, 2019 Entrance Structure Pricing, detailed as follows: Excavate for and form (2) Spread Footings, 5'x 8' x 1.33', with bottoms being 3.33' below grade. Furnish and place #5 rebar reinforcement and (16)3/4" x 18" L-Hook anchors. Pour 5 CY of 4,000 psi concrete for footings. Furnish and install (1) Hot Dipped Galvanized, Epoxy painted metal entrance structure per: -6" x 6" square tubes for uprights -4" x 4" square tubes for divider -1/2" plate for lattice work in the main arc -Stainless Steel lettering Backfill footings. Form and pour a 5' x 5' perimeter curb around base of columns. Furnish and place weed fabric barrier inside perimeter curb. Furnish and place landscape rock inside perimeter curb. TOTAL: $59,379.00 Note 1: The 2-Part Epoxy paint color to be chosen by the owner. Note 2: Pricing based on 'Sign01' drawing, dated 8/14/19. Equal Opportunity Employer Page 1 of 2 Prepared By: l 1 /(rdr Sr6ature Derek Misch Project Manager Dan Cristiani Excavating Co., Inc. Cell: (574)870-0235 Email: derek@dcexc.com Equal Opportunity Employer Page 2 of 2