HomeMy WebLinkAboutCHANGE ORDER 1 AIA Document G701 - 2001 Change Order OWNER 0 Mayor Mike Moore ARCHITECT 0 file 1834.01/F-11 CONTRACTOR 0 Cristiani Excavating Co.,Inc. FIELD 0 PROJECT: Chapel Lake Park CHANGE ORDER NUMBER: 01 City of Jeffersonville Jeffersonville,IN DATE: January 30,2019 TO CONTRACTOR: ARCHITECTS PROJECT NUMBER: 1834.01 Cristiani Excavating Co.,Inc. 1221 Old Hwy.31 E. CONTRACT DATE: December 19,2018 Clarksville,IN 47130 CONTRACT FOR: General Construction THE CONTRACT IS CHANGED AS FOLLOWS: See attached summary sheet The original Contract Sum was $3,229,000.00 The net change by previously authorized Change Orders $0.00 The Contract Sum prior to this Change Order in the amount of $3229,000.00 The Contract Sum will be Increased deereasest aashanged by this Change Order In the amount of 867,268.00 The new Contract Sum including this Change Order will be $4,096,268.00 The Contract Time will be increased decreased unchanged by 0 days The date of Substantial Completion prior to this Change Order was March 19,2019 The date of Substantial Completion as of the date of this Change Order therefore is March 19,2019 NOTE: This Change Order does not include changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supercede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER Kovert Hawkins Architects Cristiani Excavating Co.Inc. Board of Public Works.City of Jeffersonville ARCHITECT CONTRACTOR OWNER 630 Walnut Street 1221 Old Hwy.31 E. 500 Quartermaster CL Jeffersonville,IN 47130 Clarksville,IN 47130 Jeffersonville,IN 47130 ADDRESS ADDRESS ADDRESS BY BY BY Matthew D.Guilo,RLA Chris Jackson Mayor Mike Moore ( 1 ---- Name Name Name 30-Jan-19 �3 1 47 Date Date AIA DOCUMENT G701-2001.Copyright®1979,1987,2000 and 2001 by The American Institute of Architects. Ali rights reserved. AIA License Number 109187 • CHANGE ORDER-Contingency Summary Change Order 01 Summary: Item Description Amount RFP# Claim# 1 Alternate Structure Castings 1,120.00 NA CP-02 2 Additional Silt Fence 1 1,124.00 NA CP-03 3 Additional Silt Fence 2 2,200.00 NA CP-04 Subtotal 4,444.00 Adjust Contingency Allowance (4,444.00) Total this Change Order Contingency Allowance Adjustment Log Original Contingency Amount/Cash Allowance 210,000.00 Adjustment to Contingency Allowance from Previous Change Orders 0.00 Contingency Allowance Amount Prior to this Change Order 100,000.00 Cash Allowance 110,000.00 Adjustment to Contingency Allowance this Change Order Balance Remaining in Contingency Allowance 205,556.00 • CHANGE ORDER-Contract Summary Change Order 01 Summary: Item Description Amount RFP# Claim# 1 Basebid Deduct (281,921.00) RFP 1 CP-01 Chapel Lake Bridge Crossing Lentzier Creek Demo Lentzier Creek Parking Reduction Lentzier Creek Playground Lentzier Creek Lawn Space Lentzier Ceek Concrete Work Lentzier Creek Landscape Lentzier Creek Utilities Lentzier Creek Site Furniture 2 Alternate 1:Chapel Lake Shelter House 615,535.00 RFP-1 CP-01 3 Alternate 4: Landscape at Chapel Lake 14,457.00 RFP-1 CP-01 4 Alternate 9: Rubber Surface at Chapel Lake Playground 99,956.00 RFP-1 CP-01 5 Alternate 12:Lentzier Creek Restoration-South 187,092.00 RFP-1 CP-01 6 Alternate 15:Multi-use Trail 232,149.00 RFP-1 CP-01 Subtotal 867,268.00 Total this Change Order 3+7 r .31; Contingency Allowance Adjustment Log Original Contract Sum 3,229,000.00 Adjustment to Contract Sum from Previous Change Orders 0.00 Contract Sum Amount Prior to this Change Order 3,229,000.00 Adjustment to Contract Sum this Change Order 867,268.00 New Contract Sum 4.096,268.00