Loading...
HomeMy WebLinkAboutRD WATER TOWER ROAD Am CHANGE ORDER-EXTRA WORK AGREEMENT NO. 2 JOB NO. 17167 Project Name Water Tower Road Contractor Dan Cristiani Excavating Co.,Inc. You are hereby authorized to proceed with the following described change or extra work: As per attached documentation: 1 Add Force Main Extension(Approx.715')from East Side of SR-62 to Connect to Sanitary Sewer = $ 149,283.00 (Gottbrath Parkway Sewer Connection) TOTAL = $ 149,283.00 The method of payment for this change or extra work shall be: An additional amount of One hundred forty nine thousand two hundred eighty three dollars and no cents =$149,283.00 Consulting Engineer: Jacobi, ombs and Lanz,Inc. 7-Engineer's Signature Date Ow sA oval Cityoffe:, -.•,.•• e Sign. re.f Owners) Date Contractor's A proval: D , Cnstrani Excavatin Co. Inc. C'/i�IS T4CKsort t�iGe l�resridBn� y/y Authorized Representative Title Date Page 1 of 1 1971 - Present DAN CRISTIANI EXCAVATING CO., INC. 47 1221 Old Hwy. 31E YEARSOF P. O. Box 2427 EXCELLENCE Clarksville, IN 47131-2427 DanCristiani PHONE (812) 282-9866 Fax (812)282-9908 Excavating Co.,Inc. PROPOSAL To: City of Jeffersonville ATTN: Josh Darby, P.E. Date: 11/29/18 JOBSITE: Gottbrath Parkway Sewer Connection Based on Jacobi, Toombz, and Lanz, Inc. drawings dated 11/14/2018. Furnish and install approx. 569' of 8" C900 DR18 PVC Pipe. Furnish and install approx. 146' of 8" C900 DR18 Certalok Pipe. Furnish and install ten 8" DI MJ Bends w/ megalugs. Furnish and install tracer wire and detection tape. Bore and Jack 146' of 18" dia. .375 wall steel casing in rock. Furnish and install casing spacers and casing end seals. Furnish and install 8" MJ fittings to construct drop on manhole. Stone encase all open cut trench pipe with #8 stone. Stone backfill open cut trench entirely with #8 stone under pavement. Haul away excess dirt and rock. Pressure test. Seed and straw disturbed areas. Total: $149,283. 00 Excludes: Permits, soil testing Notes: If soft subgrade is encountered, soil stabilization or treatment will be extra to the owner. Acceptance to constitute a contract between us. This bid to hold for a period of 30 days from date. Terms: Net 15 days following date of invoice. DAN CRISTIANI EXCAVATING CO., INC. ACCEPTED BY Chris Jackson BY DATE J:\ESTIMATES\2018 ESTIMATES\GOTTBRATH SEWER CONNECTION\Proposal - Gottbrath Sewer Connection.docx Equal Opportunity Employer Page 1 of 1