Loading...
HomeMy WebLinkAboutRD CHANGE ORDER WATER TOWER ROAD CHANGE ORDER-EXTRA WORK AGREEMENT NO. 1 JOB NO. 1-16- Project Name Water Tower Road Contractor Dan Cristiani Excavating Co.,Inc. You are hereby authorized to proceed with the following described change or extra work: As per attached documentation: 1 Delete Quantity from Pay Item B6 4"Thick Concrete Sidewalk: 1,965 SY @$46.10/SY = $ (90,586.50) 2 Delete Quantity from Pay Item B7 Concrete Curb Ramp: 6 EA @$1,600.00/EA = $ (9,600.00) 3 Delete Quantity from Pay Item B11 18"PVC Casing: 425 LF @$98.40/LF = $ (41,820.00) TOTAL = $ (142,006.50) The method of payment for this change or extra work shall be: A reduction in the amount of One hundred forty two thousand six dollars and fifty cents =$142,006.50 Consulting Engineer: Ji :•.i, Toomb` d Lanz,Inc. Engineer's Signatu 4/Date�a/i8 Owner' pr City oIIe ,si ignar(s) 2. fi 6/e Date Contr.ctor's Appro .:1: Dan Cristiani Excavating Co.,Inc. '.��i - II pgi Author 'epresentative Tit e ate Page 1 of 1