Loading...
HomeMy WebLinkAboutCHANGED ORDER UTICA PIKE CHANGE ORDER-EXTRA WORK AGREEMENT NO. 4 JOB NO. 17C8 Project Name Utica Pike Sewer Replacement Contractor Temple and Temple Excavating and Paving You are hereby authorized to proceed with the following described change or extra work: As per attached documentation: 1 Connect Laterals from Existing Grinder Pumps = $ 10,068.65 TOTAL = $ 10,068.65 The method of payment for this change or extra work shall be: An additional amount of Ten thousand sixty eight dollars and sixty five cents =$10,068.65 Consulting Engineer: Jaco.1, Toombs and Lanz,Inc. 5;1'7/ Engineer's Signa - Date Owner's Approva: I o ors nville 5l17//2 ignature of Owner(s) )atc Contractor's Approval: Temple and Temple Exca va ting and Paving yL Secretary/Treasurer 5/14/2018 A y+lorized Representative Title Date Page 1 of I 4i•Vmple 1mpie EXCAVATING & PAVING. INC 1367 South Stat%, goad 60 • Salem. IN 47167 - Ph 812-8883 6644 • Fax 812-883.6664 DATE: May 11,2018 TO: Josh Darby Jacobi,Toombs and Lanz,Inc RE: Utica Pike Change Order—Lateral Connection It was brought to our attention that after completion of the job,a lateral was not shown on the plans. Please see our price below for potholing existing utilities,installing a 2" line to connect to a nearby location,and restoring disturbed areas with sod. Please let me know if you have any questions. Cost per Markup Description Qty Unit Unit Total Cost % Markup$ Total Price Laborer 80 HR $ 35.00 $ 2,800.00 15% $ 420.00 $ 3,220.00 Operator 40 HR $ 45.00 $ 1,800.00 15% $ 270.00 $ 2,070.00 Potholing Machine 10 HR $ 85.00 $ 850.00 15% $ 127.50 $ 977.50 Rented Excavator 1 LS $ 619.53 $ 619.53 15% $ 92.93 $ 712.46 2"PVC Pipe 200 LF $ 0.81 $ 162.00 15% $ 24.30 $ 186.30 Fittings 1 LS $ 313.82 $ 313.82 15% $ 47.07 $ 360.89 Skid Steer 10 HR $ 45.00 $ 450.00 15% $ 67.50 $ 517.50 Sodding 220 SY $ 8.00 $ 1,760.00 15% $ 264.00 $ 2,024.00 $ 8,755.35 $ 1,313.30 $ 10,068.65 Sincerely, Jason Miller Estimator/Project Manager Page I of 1