Loading...
HomeMy WebLinkAboutContract Documents- Police HQ • D Ti 20 07 Do cument AIOITM - tete,... A Standard Form of Agreement Between Owlet! and Contractor where the basis of payment is a Stipulated Sum 1 AGIIEEMENT made as of the Fifth day ofJune in the year Two Thousand Thirteen (In words, indicate day, month and year) ADDITIONS AND DELETIONS: The author of this document has BETWEEN the Owner: added information needed for its (Name, legal status, address and other information) completion. The author may also have revised the text of the original The City of ieffersonville and "The Jeffersonville Redevelopment Commission AIA standard form. An Additions and 500 Quartermaster Court Deletions Report that notes added Jeffersonville, IN 47130 information as well as revisions to the standard form text is availliNe from the author and should be reviewed. A vertical tine in the leftinargin of this and the Contractor: document Indicates where the author (Name, legal status, address and other information) has added necessary information and where the author has added to or AML Inc deleted from the original AIA text. , 2916 Campion Road This document has important legal Floyds Knobs, IN 47119 consequences. Consultation with an Telephone Number: 812-923-9895 attorney is encouraged with respect Fax Number: 812-923-5628 to its completion or modification. AIA Document A201 for the following Project: General Conditions of the Contract (Name, location and detailed description) for ConstructiOrt, is adopted in this document by reference. Do not use Jeffersonville Police Headquarters with other general conditions unless 2218 East 10th Street this document is modified. Jeffersonville, IN 47130 New Police Headquarters located in Jeffersonville, IN The Architect; (Name, legal Nam, address and other information) The Estopinal Grow, LLC 903 Spring Street Jeffersonville, IN 47130 Telephone Number: 812-282-3700 Fax Number: 812-282-4383 The Owner and Contractor agree as follows. AIA Document A101 — 2002. copyright to 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Init. institute of Architects. Alt rights reserved. WARNING: This Ale Document is protected by U.S. Copyright Law and Internationiki Treaties. Unauthorized reproduction or distribution of this ALA Document or any portion of IL may result in severe civil end criminal penalties, and will be prosecuted to the ' / maximum extent possible under the law. This document was produced by AIA software at 16:1620 on 06/06/2013 under Order No.5864061282 1 which expires on 07117/2013, and is not for resale. User Notes: (1278409906) SAO ((;143 TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement if it differs from the date of this Agreement or, if applicable, state that the date will be fried in a notice to proceed.) I June 19, 2013 If, prior to the commencement of the Work, the Owner requires time to file mortgages and other security interests, the Owner's time requirement shall be as follows: § 3.2 The Contract Time shall be measured from the date of commencement. I § 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than three hundred thirty calendar ( 330 ) days from the date of commencement, or as follows: (Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of commencement. If appropriate, insert requirements for earlier Substantial Completion of certain portions of the Work.) Time begins from date of written Notice to Proceed. AIA Document A101 TM - 2007. Copyright ®1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Init. Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 2 reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the i maximum extent possible under the law. This document was produced by AIA software at 15:25:26 on 06/05/2013 under Order No.5864061282_1 which expires on 07/17/2013, and is not for resale. User Notes: (1195783017) - -S— Portion of Work Substantial Completion Date , subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for liquidated damages relating to failure to achieve Substantial Completion on time or for bonus payments for early completion of the Work.) $500 /consecutive calendar day beginning first day beyond completion time above or as amended by change order. ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be Six Million Two Hundred Fifty -six Thousand Dollars and Zero Cents ($ 6,256,000.00 ), subject to additions and deductions as provided in the Contract Documents. § 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the bidding or proposal documents permit the Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires.) 1 Alternates have not been accepted. 1 § 4.3 Unit prices, if any: See attached proposal form (Identify and state the unit price; state quantity limitations, if any, to which the unit price will be applicable.) Item Units and Limitations Price Per Unit ($0.00) 1 § 4.4 Allowances included in the Contract Sum, if any: See attached proposal form (Identify allowance and state exclusions, if any, from the allowance price.) Item Price ARTICLE 5 PAYMENTS § 5.1 PROGRESS PAYMENTS § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: § 5.1.3 Provided that an Application for Payment is received by the Architect not later than the 25 day of a month, the Owner shall make payment of the certified amount to the Contractor not later than the 10 day of the following month. If an Application for Payment is received by the Architect after the application date fixed above, payment shall be made by the Owner not later than thirty (30 ) days after the Architect receives the Application for Payment. (Federal, state or local laws may require payment within a certain period of time.) § 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. AIA Document AIOITM — 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Init. Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 3 reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the t maximum extent possible under the law. This document was produced by AIA software at 15:25:26 on 06/05/2013 under Order No.5864061282_1 which expires on 07/17/2013, and is not for resale. User Notes: (1195783017) § 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. § 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of ten percent ( 10 %). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute shall be included as provided in Section 7.3.9 of AIA Document A201TM -2007, General Conditions of the Contract for Construction; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored offthe site at a location agreed upon in writing), less retainage of ten percent ( 10 %); .3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of AIA Document A201 -2007. § 5.1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under the following circumstances: .1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to the full amount of the Contract Sum, less such amounts as the Architect shall determine for incomplete Work, retainage applicable to such work and unsettled claims; and (Section 9.8.5 of AIA Document A201-2007 requires release of applicable retainage upon Substantial Completion of Work with consent of surety, if any.) .2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable in accordance with Section 9.10.3 of AIA Document A201 -2007. § 5.1.8 Reduction or limitation of retainage, if any, shall be as follows: (If it is intended, prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting from the percentages inserted in Sections 5.1.6.1 and 5.1.6.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) 1 When project is 50% complete retainage to be reduced to 5 %. § 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. § 5.2 FINAL PAYMENT § 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2.2 of AIA Document A201 -2007, and to satisfy other requirements, if any, which extend beyond final payment; and .2 a final Certificate for Payment has been issued by the Architect. § 5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final Certificate for Payment, or as follows: ARTICLE 6 DISPUTE RESOLUTION § 6.1 INITIAL DECISION MAKER The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A201 -2007, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker. AIA Document A101 TM - 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Init. Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 4 reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:25:26 on 06/05/2013 under Order No.5864061282_1 which expires on 07/17/2013, and is not for resale. User Notes: (1195783017) 6/ / 3 (If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.) § 6.2 BINDING DISPUTE RESOLUTION For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A201 -2007, the method of binding dispute resolution shall be as follows: (Check the appropriate box. If the Owner and Contractor do not select a method of binding dispute resolution below, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction.) [ X ] Arbitration pursuant to Section 15.4 of AIA Document A201 -2007 [ ] Litigation in a court of competent jurisdiction [ ] Other (Specify) ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201 -2007. § 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201 -2007. ARTICLE 8 MISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A201 -2007 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any.) § 8.3 The Owner's representative: (Name, address and other information) Clinton Deckard 500 Quartermaster Court Jeffersonville, IN 47130 § 8.4 The Contractor's representative: (Name, address and other information) Scott L. Welch 2916 Campion Road Floyds Knobs, IN 47119 AIA Document A101 Tn ' 2007. Copyright ®1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Init. Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 5 reproduction or distribution of this Ale Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:25:26 on 06/05/2013 under Order No.5864061282_1 which expires on 07/17/2013, and is not for resale. User Notes: (1195783017) �� /� § 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. § 8.6 Other provisions: ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below. § 9.1.1 The Agreement is this executed AIA Document A101 -2007, Standard Form of Agreement Between Owner and Contractor. § 9.1.2 The General Conditions are AIA Document A201 -2007, General Conditions of the Contract for Construction. § 9.1.3 The Supplementary and other Conditions of the Contract: Document Title Date Pages § 9.1.4 The Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) 1 The Project Manual dated January 2013 issued by The Estopinal Group, LLC. See attached Table of Contents Section Title Date Pages § 9.1.5 The Drawings: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) I The Drawing Set dated January 2013 issued by The Estopinal Group, LLC. See attached Table of Contents Number Title Date § 9.1.6 The Addenda, if any: Number Date Pages Addendum #1 3/21/13 163 Addendum #2 3/27/13 9 Addendum #3 4/04/13 33 Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9. § 9.1.7 Additional documents, if any, forming part of the Contract Documents: .1 AIA Document E201TM -2007, Digital Data Protocol Exhibit, if completed by the parties, or the following: AIA Document A101 TM — 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Init. Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 6 reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:25:26 on 06/05/2013 under Order No.5864061282_1 which expires on 07/17/2013, and is not for resale. User Notes: (1195783017) ,:z.-(A) .2 Other documents, if any, listed below: (List here any additional documents that are intended to form part of the Contract Documents. AIA Document A201 -2007 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) ARTICLE 10 INSURANCE AND BONDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A201 -2007. (State bonding requirements, if any, and limits of liability for insurance required in Article 11 of AIA Document A201- 2007.) Type of insurance or bond Limit of liability or bond amount ($0.00) This Agreement entered into as of the day and year first written above 7 OWNER (Signature CONTRACTOR (Signature) R ilk 0 ij Al C' 1 • 4.I Scott L. Welch, President (Printed name and title (Printed name and title) AIA Document A101 TM - 2007. Copyright ©1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 2007 by The American Init. Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized 7 reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:25:26 on 06/05/2013 under Order No.5864061282_1 which expires on 07/17/2013, and is not for resale. User Notes: (1195783017) 62/4/1_3 Certification of Document's Authenticity AIA® Document D401 TM — 2003 I, Scott L. Welch, hereby certify, to the best of my knowledge, information and belief, that I created the attached final document simultaneously with its associated Additions and Deletions Report and this certification at 15:25:26 on 06/05/2013 under Order No. 5864061282_1 from AIA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AIA Document A101TM — 2007, Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum, as published by the AIA in its software, other than those additions and deletions shown in the associated Additions and Deletions Report. 360 (Signed) L Jech -F -. p ,,(,e/D (Title) (.0 (Dated) AIA Document D401 TM - 2003. Copyright © 1992 and 2003 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may 1 result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:25:26 on 06/05/2013 under Order No.5864061282_1 which expires on 07/17/2013, and is not for resale. User Notes: (1195783017) Jeffersonville Police Headquarters JEFF.038 City of Jeffersonville January 2013 SECTION 000003 - TABLE OF CONTENTS Cover Certification Page Section 000003 Table of Contents Section 000004 List of Drawings Section 000010 Project Directory Section 000020 Invitation to Bidders Section 000100 Instructions to Bidders AIA Document A701 — Instruction to Bidders Section 000120 Supplementary Instructions to Bidders Section 000200 Information Available to Bidders Geotechnical Exploration Report Ordinance- 2000 OR -10; Ordinance Establishing Fire Hydrant Specifications for Developers and Others — City of Jeffersonville Common Wage Rates — Clark County Section 000300 Proposal Form Form 96 AIA Document A305 -- Contractor's Qualification Statement Section 000310 Bidders Checklist Section 000410 Bid Security Form AIA Document A310 — Bid Bond Section 000450 Non - Collusion Affidavit Section 000500 Agreement Form AIA Document A101 — Standard Form of Agreement between Owner and Contractor Section 000600 Contractor's Bond for Construction AIA Document A312 — Performance Bond AIA Document A312 — Payment Bond Section 000700 General Conditions AIA Document A201 — General Conditions of the Contract Section 000800 Supplementary Conditions Division 1 General Requirements Section 011000 Summary Section 012100 Allowances Section 012300 Alternates Section 012600 Contract Modification Procedures Section 012900 Payment Procedures Section 013010 Architect's Electronic Drawing Files Section 013100 Project Management and Coordination Section 013200 Construction Progress Documentation Section 013300 Submittal Procedures Section 014000 Quality Requirements Section 014200 References Section 015000 Temporary Facilities and Controls Section 016000 Product Requirements Section 017300 Execution Section 017700 Closeout Procedures Section 017823 Operation and Maintenance Data Section 017839 Project Record Documents Section 017900 Demonstration and Training Division 2 Existing Division 3 Concrete Section 032000 Concrete Reinforcing Section 033000 Cast -in -Place Concrete Division 4 Masonry Section 042000 Unit Masonry TABLE OF CONTENTS 000003 - 1 6/--;1/4S, Jeffersonville Police Headquarters JEFF.038 City of Jeffersonville January 2013 Section 042731 Reinforced Unit Masonry Section 044300 Stone Masonry Section 047200 Cast Stone Masonry Division 5 Metals Section 051200 Structural Steel Framing Section 052100 Steel Joist Framing Section 053100 Steel Decking Section 054000 Cold- Formed Metal Framing Section 055100 Metal Stairs Division 6 Wood Plastics and Composites Section 061000 Rough Carpentry Section 061600 Sheathing Section 064023 Interior Architectural Woodwork Division 7 Thermal and Moisture Protection Section 072100 Thermal Insulation Section 074216 Insulated -Core Metal Wall Panels Section 074265 Thermal and Air Barrier Wall System Section 075323 Ethylene - Propylene - Diene- Monomer (EPDM) Roofing Section 076200 Sheet Metal Flashing and Trim Section 077200 Roof Accessories Section 079200 Joint Sealants Division 8 Openings Section 081113 Hollow Metal Doors and Frames Section 081416 Flush Wood Doors Section 083113 Access Doors and Frames Section 083323 Overhead Coiling Doors Section 084113 Aluminum- Framed Entrances and Storefronts Section 084413 Glazed Aluminum Curtain Walls Section 087100 Door Hardware Section 087113 Automatic Door Operators Section 088000 Glazing Division 9 Finishes Section 092216 Non - Structural Metal Framing Section 092900 Gypsum Board Section 093000 Tiling Section 095113 Acoustical Panel Ceilings Section 096513 Resilient Base and Accessories Section 096519 Resilient Tile Flooring Section 096813 Tile Carpeting Section 097050 Resinous Flooring Section 099120 Painting Division 10 pecialties Section 102113 Toilet Compartments Section 102226 Operable Partitions Section 102600 Wall and Door Protection Section 102800 Toilet, Bath, and Laundry Accessories Section 104413 Fire Extinguisher Cabinets Section 104416 Fire Extinguishers Section 105113 Metal Lockers Division 11 Equipment TABLE OF CONTENTS 000003 - 2 Jeffersonville Police Headquarters JEFF.038 City of Jeffersonville January 2013 Section 114500 Walk -in Cooler /Freezer Division 12 Furnishings Section 122413 Roller Window Shades Division 13 Special Construction Section 130650 Bullet Resistant Protection Division 14 Conveying Systems Division 20 Mechanical Section 200100 General Provisions — Mechanical Section 200100 Heat Pump Start-Up Section 200200 Scope of the Mechanical Work Section 200300 Shop Drawings, Maintenance Manuals and Parts Lists Section 201100 Sleeving, Cutting, Patching, Firestopping & Repairing Section 201200 Excavation, Trenching, Backfilling & Grading Section 201300 Pipe, Pipe Fittings, & Pipe Support Section 201305 Geothermal Loop System Section 201310 Pipe Filling, Cleaning, Flushing, Purging and Chemical Treatment Section 202100 Valves Section 202200 Insulation — Mechanical Section 202300 Thermometers, Pressure Gauges & Other Monitoring Instruments Section 202400 Identifications, Tags, Charts, Etc Section 202500 Hangers, Clamps, Attachments, Etc Section 202600 Mechanical /Electrical Vibration Controls and Seismic Restraints Section 203100 Testing, Balancing, Lubrication and Adjustments Division 21 Fire Protection Section 210100 Fire Protection Section 210102 Fire Protection (Clean Agent Fire Suppression System) Division 22 Plumbing Section 220100 Plumbing Specialties Section 220200 Plumbing Fixtures, Fittings and Trim Section 221119 Fire Hydrant Services and Valves Section 221423 Culverts and Storm Drainage Division 23 Heating Ventilating and Air Conditioning (HVAC) Section 230100 Pumps Section 230200 HVAC Equipment and Chemical Treatment Section 231100 Registers, Grilles, Diffusers and Louvers Section 231200 Sheet Metal Division 25 Building Automation System Section 250400 Controls — Direct Digital — Web Based Division 26 Electrical Section 260000 General Provisions Section 260010 Scope of the Electrical Work Section 260015 Coordination Among Trades, Systems Interfacing and Connection of Equipment Furnished by Others Section 260020 Shop Drawings, Literature, Manuals, Parts Lists, and Special Tools Section 260030 Cutting, Patching & Repairing TABLE OF CONTENTS 000003 - 3 Jeffersonville Police Headquarters JEFF.038 City of Jeffersonville January 2013 Section 260040 Excavation, Trenching, Backfilling & Grading Section 260060 Grounding Section 260075 Identifications Section 260120 Conductors, Identifications, Splicing Devices & Connectors Section 260130 Raceways & Fittings Section 260135 Cabinets, Outlet Boxes & Pull Boxes Section 260140 Wiring Devices & Plates Section 260155 Motor Starters Section 260230 Emergency Standby Systems Section 260285 Surge Suppression Systems Section 260400 Electrical Distribution Equipment Section 260500 Lighting Fixtures and Lamps Section 262750 Electrical Seismic Restraints Division 27 Communications Section 270710 Datalloice System Section 270780 CATV Systems Division 28 Electronic Safety and Sec urity Section 283100 Fire Alarm System Section 286601 Lightning Protection System Division 31 Earthwork Section 311000 Site Clearing Section 312000 Earth Moving Section 313116 Termite Control Division 32 Exterior Improvements Section 321216 Asphalt Paving Section 321313 Concrete Paving Section 321373 Concrete Paving Joint Sealants Section 321500 Flagpole with Tunnel Light Assembly Section 321715 Traffic Control Signs Section 321723 Pavement Markings Section 329200 Turf and Grasses Division 33 Utilities Section 330500 Common Work Results for Utilities Section 334100 Storm Utility Drainage Piping Section 334600 Subdrainage END OF SECTION 000003 TABLE OF CONTENTS 000003 - 4 A 13 Jeffersonville Police Headquarters JEFF.038 City of Jeffersonville January 2013 SECTION 000004 - LIST OF DRAWINGS COVER SHEET PR1 PROJECT REFERENCE AND DETAILS CIVIL CO.1 SURVEY EXISTING SITE CO.2 SURVEY EXISTING SITE C1 SITE DEMOLITION PLAN C2 SITE LAYOUT PLAN C3 SITE GRADING PLAN C4.1 SITE UTILITY PLAN C4.2 PIPING SCHEDULE CA SITE LAYOUT PLAN ALTERNATE SHEET CX1 CROSS SECTIONS DITCH LINE 1 STA 0 +25 TO 1 +25 CX2 CROSS SECTIONS DITCH LINE 1 STA 1+50 TO 2 +00 CX3 CROSS SECTIONS DITCH LINE 1 STA 2 +25 TO 2 +75 CX4 CROSS SECTIONS DITCH LINE 1 STA 3 +00 TO 3 +50 CX5 CROSS SECTIONS DITCH LINE 1 STA 3 +75 TO 4 +25 CX6 CROSS SECTIONS DITCH LINE 1 STA 4 +50 TO 5 +25 CX7 CROSS SECTIONS DITCH LINE 1 STA 5 +75 TO 6 +00 CX8 CROSS SECTIONS DITCH LINE 1 STA 6 +27.91 TO 6 +75 STRUCTURAL S0.1 STRUCTURAL GENERAL NOTES AND ABBREVIATIONS S0.2 STRUCTURAL QUALITY ASSURANCE PLAN S0.3 WIND PRESSURE DIAGRAMS AND SCHEDULE S0.4 STANDARD SECTIONS S0.5 TYPICAL MASONRY SECTIONS S1.1 FOUNDATION AND FIRST FLOOR PLAN -BASE BID S1.2 ENLARGED FOUNDATION AND FIRST FLOOR PLAN -BASE BID S1.3 PARKING CANOPY FOUNDATION AND ROOF FRAMING PLANS -ADD ALTERNATE #1, #2, AND #6 S1.4 FOUNDATION DETAILS -ADD ALTERNATE #1, #2, AND #6 S1.5 FOUNDATION DETAILS -ADD ALTERNATE #1, #2, AND #6 S1.6 PARKING CANOPY FOUNDATION AND ROOF FRAMING PLANS -ADD ALTERNATE #5 S2.1 MEZZANINE FRAMING PLANS -BASE BID S2.2 CANOPY FRAMING PLAN -ADD ALTERNATE #1, #2, AND #6 S3.1 ROOF FRAMING PLANS S3.2 ENLARGED FRAMING PLANS -BASE BID S3.3 ENLARGED FRAMING PLANS -ADD ALTERNATE #1 AND #2 S4.1 FOUNDATION SECTIONS AND DETAILS S4.2 FOUNDATION SECTIONS AND DETAILS S5.1 MEZZANINE FRAMING SECTIONS AND DETAILS S6.1 ROOF FRAMING SECTIONS AND DETAILS S6.2 ROOF FRAMING SECTIONS AND DETAILS S6.3 ROOF FRAMING SECTIONS AND DETAILS S7.1 SCHEDULES AND DETAILS ARCHITECTURAL A0.1 ARCHITECTURAL SITE PLAN A1.1 LIFE SAFETY PLAN A3.1 DIMENSION PLAN A4.1 ARCHITECTURAL PLAN A5.1 REFLECTED CEILING PLAN A5.2 CEILING DETAILS A6.1 ROOF PLAN A6.2 ROOF PLAN DETAILS A7.1 ENLARGED TOILET PLANS AND PLAN DETAILS A8.1 EXTERIOR ELEVATIONS A9.1 WALL SECTIONS LIST OF DRAWINGS 000004 - 1 z kJ & /2ice Jeffersonville Police Headquarters City of Jeffersonville JEFF.038 January 2013 A9.2 WALL SECTIONS A9.3 WALL SECTIONS A10.1 PLAN DETAILS A11.1 INTERIOR ELEVATIONS A11.2 INTERIOR ELEVATIONS A11.3 INTERIOR ELEVATIONS Al2.1 CASEWORK SECTIONS A14.1 OPENING SCHEDULE AND DOOR ELEVATIONS A14.2 OPENING DETAILS A15.1 ALUMINUM FRAME ELEVATIONS AND DETAILS A15.2 OPENING DETAILS INTERIOR DESIGN ID1.1 FLOOR FINISH PLAN ID2.1 ROOM FINISH SCHEDULE ADD ALTERNATES A1.1ALT LIFE SAFETY PLAN - ALTERNATE A4.1ALT ARCHITECTURAL PLAN - ALTERNATE A5.1ALT REFLECTED CEILING PLAN - ALTERNATE A6.1ALT ROOF PLAN - ALTERNATE A8.1ALT EXTERIOR ELEVATIONS - ALTERNATE ID1.1ALT FLOOR FINISH PLAN - ALTERNATE PLUMBING FP1.0 FLOOR PLAN - FIRE PROTECTION FP2.0 FLOOR PLAN - FIRE PROTECTION - ALTERNATE P1.0 LEGENDS / GENERAL NOTES / DETAILS P2.1 FLOOR PLAN - FIRST FLOOR PLUMBING P2.1ALT FLOOR PLAN - FIRST FLOOR PLUMBING - ALTERNATE P3.0 FLOOR PLAN - UNDER SLAB WASTE AND VENT P3.0ALT FLOOR PLAN - UNDER SLAB WASTE AND VENT - ALTERNATE P3.1 FLOOR PLAN - FIRST FLOOR WASTE AND VENT P3.1ALT FLOOR PLAN - FIRST FLOOR WASTE AND VENT - ALTERNATE P3.2 ROOF PLAN - STORM DRAIN PIPING P3.2ALT ROOF PLAN - STORM DRAIN PIPING - ALTERNATE MECHANICAL FP1.0 FIRE PROTECTION LEGEND, DETAILS, AND GENERAL NOTES FP2.0 FLOOR PLAN - FIRE PROTECTION P1.0 PLUMBING LEGEND, DETAILS, SCHEDULES, AND GENERAL NOTES P2.0 FLOOR PLAN - UNDERSLAB PLUMBING P2.1 FLOOR PLAN - PLUMBING P2.3 ROOF PLAN - PLUMBING P3.0 SANITARY WASTE RISER DAIGRAM M1.0 MECHANICAL LEGEND AND GENERAL NOTES M1.1 MECHANICAL SITE PLAN M2.0 FLOOR PLAN - AIR DISTRIBUTION M2.1 ROOF PLAN - MECHANICAL M3.0 FLOOR PLAN - MECHANICAL PIPING M4.0 ENLARGED MECHANICAL ROOM PLAN M5.0 MECHANICAL DETAILS M5.1 MECHANICAL DETAILS M6.0 MECHANICAL SCHEDULES ELECTRICAL EU1.0 ELECTRICAL SITE PLAN EU1.1 SITE DETAILS E1.0 ELECTRICAL LEGEND AND GENERAL NOTES E3.1 FIRST FLOOR PLAN - LIGHTING E3.1ALT LIGHTING/ POWER/ SYSTEMS - ALTERNATE E4.1 FIRST FLOOR PLAN - POWER E5.1 FIRST FLOOR PLAN - SYSTEMS LIST OF DRAWINGS 000004 - 2 6 / L' 3 Jeffersonville Police Head uudern City ofJeffersonville JEFF.038 January 2013 E8.0 LIGHT FIXTURE SCHEDULE AND DETAILS E7.0 POWER DIST RISER E7.1 PANELBOARD SCHEDULES E7.1 PANELBOARD SCHEDULES E8.0 ELECTRICAL DETAILS E8.1 FIRE ALARM RISER END OF SECTION 000004 LIST OF DRAWINGS 000004 - 3