HomeMy WebLinkAboutVissing Park Contract 1 0). 1 0 . 7 4. ..,;: .... A . . .. Document At l'm 2007 . _. Standard For ofAgreement Between Owner and Contractor where the basis of . payment is a Stipulated Sum . , AGREEMENT made as of the Twenty-Fiat) (kty of May in the year Two Thousand Twelve ADOrrIONS AND DELETIONS: (in ivords, indicate day, month and year) The author a Ws document nes added information needed for its BETWEEN the Owner: completion,. The author may also 1: (Name, legal slaw, address and ather iniarmation) have revised the text of the original AlA .standard form, An Acktftions City ofJeffersonville — Parks and Recreation City Hall Deletions Report that notes added Information as was as ravish:in• to 500 Quartermaster Court, Suite 205 Jeffrsonville, IN 47130 the standard form text is av014Ne from the author and ,shoud be Telephone Number 812280.4704 rodiewed A vertcal line in the. kift . Fax Number 812.285.6481 margin of this document irvdicates where the author has added ,. I rIttcassary information and where and the Contractor: I tiVanto, legal status, address and atik. information) the author has added to or deloteci from the original Al A text ANIL, Inc, This document has important fagot 2916 Campion Road :consequences, Consultation with an Floyd .KnobS, IN 47119 attorney is :encouraged with respect Telephone Nuniber 1112.923,9895 to its. completion or modification, Fax Number: 812.9233628 . AIA Document ,A2O1 TN -20QT ., General Conditions of Ma .Contract for the f011owing Project: for Constmotion. is adopted iri ltia (Name, location am, detailed desert:0aq) document by reference. Do not use with other general :conditions unless. i .. . Park Vissmg P this document is modified. 2012 Community Fields and Neighborhood Park 2700 lklissing Park „Road JeffersonAlle, Indiana The Architect: , 1 (Name, legal status, address and otber niformation.) 1 1 i Kovert liir,skins Architects, Inc. 63 'Walnut Street Jeffersonville, IN 47130 Tel Number: 812.282,9554 Fax Number: 812.282.9171 ..: The Owner and Contractor agree as .follows. 1 1 ., i 1. 1 i 4 AIA Document A101" — 2007 Caayviglt C. 1915, 1918.. 1925, 19 96 27, 1991. 10. 1981, 1981 1967, 19 1977. 1907. 1991, 1997 ars12007 by The American 414 institute of Architects. AO r ri Ids ezeivad, WAFfialliGi.: This A1A C40104044 :: 1) 0104044 tott il*0 ',13 . as, common Lavf Ann tntemainelw Transom Unsintiorissa g rearadiustfah of , thit Ate 'Crosairarit, Of 4.11Y pastion or lt MAY :MT.* Jill , ki , ,WO sisti and ndintrisi Perg4iie7, Old WM '10 Pre.MOV:10.0d W 00 i rhasitourn aslant ;melt* under the tow,. This docianent etas produced by AIA beware aitt4i.11 15 on a5110,1012 ender Order .No,7384291187_1 which typires an 01121t2012, and is not for omen: l Use N aim: 079239819 ) :-: TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT . 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION ::. 4 CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS •:',,,..';:. 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract .Documents consist of this Agreement, Conditions of the Contract (Cieneral, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement. and .Moditications issued after execution of this .Agreement, all of which :form the Contract, and are as folly a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prim negotiadons, representations or , agieements, either written 1 oral. An enumeration of the Contract Documents, other than a Modification, appears Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contwtor shall :fully execute the Work dcuribed in the Contract Documents, except as specifically indicated in the C.brittl'ict Documents to ht the responsibility of others, ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION • § 3.1 The date of commencement of the Wirk shal he the date of this Agreetrtent unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner, „ .. (insert the date 4i tt it diffiTs front the date of this .4 gree meat or, lopplieetbk, slate that the iftite 11 be fixed in et notice to pi ) 1 Date of this Agreement • , If, prior to the coinineneemcnt of the Work, the Owner requires time to file mortgages and other security iinerests, the Owner's time requirement shall he as follows: .:., § 3.2 The Contract Time shalt be measured from the date of commencement. § 13 The Contractor shall achieve Substantial Completion of the entire. Work not later than Two Hundred Forty 240 ) chls from the date of tortimencentent, or as follows: I, Invert number el:lea/endow days. Ahernatively, a calendar date may 1,k 1 'soil ti roordineded with the date qf • :, eannnencoment If appropriate, insert regentvinents for eat-tier Suintantial Completion 11/1'? "ifti in pot`tiata glike IWOrk) MA Document A1101" — 2097„ Conyr4gb1 01:915, 1919,192;5, 1927, 1951,19.59, 196•, 1995., 12117 1174, 1977, 1997. 1091, 1997 end 2007 by The Arieficen , • 4 , • . , , ,, , Insblutie of /ii C1 Ad milts reserved WANNING: TN& AlA Ppentneet la preteetod b'y tt,S -,:',•4vyttpht Law mtit totomationet 1 masa, Unsamatized 2 • mood eetion or distrfbetion 0.4 thisi MO 000.mont, of Any poPips et tr, may rev* 141 sevors civil 411:d tilmtnet penalties,. end: wili bo prosecuted to tin , 1 mpalen an extent potaibte under the two, This dee ument was prodwed by AlA toft;,vora at 1419'15 on 09/1912012 under Order Neraeoatio_i which :expires on 07, and is not for *esale. User Notes; 075239er 53) 'I': iI i I i I i 0,. 1 , i .,t Portion of Work Substantial Completion Date I I .Buildings and Fields January 20, 2013 ., 1 , sehieet to adjustments of this Contract Time as provided in the Contract Documents. ansert preni,sioms, if any, for iirjviatited ikm14.1,ges relating to failure to achieve Substantial (*on.ipletion on time &for bonus fl, i1 jar earlj completion of the Work) ARTICLE 4 CONTRACT SUM § 4.1 'The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's pertbrinance of the Contract, The Contract Sum shall be Four Mil 14.41 One Hundred Sixteen Thousand Three Hundred Dollars and .001$1.00 ($ 4,116,300.00 ), subject to additions and deductions as provided in the Contract 3 § 4,2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract DeX.Illtil en ts and are hereby accepted by tile Own er (State the numbers Of Other idenfilieilliOn qt affef4ed attermat(?s, ti the bidding or pr °pawl documents pclinit th Owner 10 accept other idiernates subsetittent to the eXceitiJail qribiS Agrreiner0e, (/.k /1 a Schedule (9‘ such other alternates showing the aillOtIllt fi)1 each and the date wilt! 11 that amount expires.) Base Bid $2,721.000 Alternate 1-Restroonn Building $ 151,000 Alternate 2-Shelter House Pavilions $ 213,000 Alternate 3-Maintenance Building $ 1 I 7000 Alternate 5-Playground A $ 50,000 Alternate 6-Playground B $ 97,600 Alternate 7-Basketball Courts $ 158,000 Alternate 8-Practice Green $ 38.600 Alternate 9-Woodiand Walking Trails $ 77,000 Alternate 10-Pergola $ 56,300 Alternate 1 1-Site Lighting $ 40,300 ., Alternate 12A-Sports Lighting Systerri Type A $ 272.000 Alternate 13-Landscape Plantings Phase I $ 56.600 Alternate 14-Landscape Plantings Phase 2 $ 9.900 Alternate 15-Site Furnishings Phase I $ 38,000 Alternate 16-Site FLA rnishings Phase 2 $ 20,000 Total Contract Sum $4,116300 § 4.3 Luit prices, if any: adent16 and state the unit price; state quaniticv limitations, flatly, to Ivhich the nnit price 1‘ he applicable.) ., item Units an Limitations Price Per Unit ($0,00) Excavatirin; Earth, trench, rnachine, Cubic Yard 13,80 including removal lit u site Excavation: Cubic Yard 75,00 Earth, trench, hand, including removal from ,site Sitework; I-4andling and moving via Cubic Yard 6.00 machine orusite without removing from site A1A Document Min' — 2907. Copyright itit 1916, 1918 1629, 1 1951, 1969, 196% 1963, 1967, 1974, 1t?? 1997 1997 arid Z007 by The American . lett. Institute of Architects. All rights restryed. WAlithriCe, This A 1300:000 L.9 LI,S, Golndot Low and Intemsticoni Treaties, titanihortLeti reetbduchon or diefribution of this Ate aotianoot, m 0:ay porfinit of it may rosoft in IseVer0 Civa*.nd oloartniplinshisi, and wtti be peon coed to tho — / met linurn extent possiNs midst the •iow 'This document mum produced by AlA software At 154012 cc 0S(19,1012 uricIer Order t.to.n64'191197_1 which evires on 07121,2 012, and is not for resole User NOW. (05103813) [ , 1 1 j Site 'Fill; earth, hauled, placed, :Cttbic Yard 14.95 compacted '4. i Backtill; hauled, placed,. compacted Cubic Yard 16.95 1 1 I Engineered Structural Fill; hauled, Cubic Yard 22,00 placed, compacted 1 Trench Rock Removal Cubic Yard 100,0(1 i MRS9 Rocik Removal Cubic Yard 85.00 Drilling/Coring Rock Removal Lineal Foot 350.00. Concrete Mock; Each 14.35 $ K. 16 x 8", integrally colored split, faced type I §4.,4 Allowances included in the Contract Sum:, if any adentifi allowance and slate exclusions, if any from the allowance 'nice.) ..1 Item Price. Contingency Allowance $100,000,00 .:- ARTICLE 5 PAYMENTS SA PROGRESS PAYMENTS §:ill :Based upon :Applications for Payment submitted to the Arch:nein: by the Contractor and Certificates •for • Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents, $,.1.2 The period covered by each Application for Payment shall be one calendar month .ending on the last day of the •month, or as •follows: I • §5,1„ Provid.ed that an Application for :Payment is received by the Architect not later than the. Fifth day of a • 1 month, the Owner Shall make payment of the certified amount to the Contractor not later than the last day of the following month. Ilan Application Iry :Payment, is received b the Architect:atter the application date fixed above, 4 payment shall be made by the Owner not later than Forty .Five ( 45 ) days after the Architect receives the Application for Payment, 11 i' , (Federal, state at local laws Noy requfre pcomentivishin ( comb" period of tiara) § .5.1A Each Application for Payment shall be based ,imi the nisi recent schedule avid:ties submitted 4 the [ Ccattraetor :in accordance with the Contract Documents. 'The schedule of values shall allocate the entire Contact Sum among the various portions of the Work, The whediale of values shall be prepared in such form and supported . by such data io substantiate its aetatracy as the Architect may require. This schedule, unless ,objected to by the krchitect, shall be . .used as a basis for reviewing the Contractor's Applications for :Payment § 5.14 Applications for Payment shall show tile percentage of completion of each portion of the Work as of the end .:. of the period rxivered by the Application Ric Payment § 5.1.6 Subject to. other provisions of the. Contract Documents the amount of each progress payment shall be computed as follows: 1 ,1 Take that portion: °feu Contact Sum properly allocable to .completed Work as determined by multiplying. the 'percentage completion of each portion of the Work by the share , of the Contract Sum allocated to that portion of the Work in the schedule of values„ :less retainage a:rive percent ( 5 %),. Pending final determination oft:os t. to the Owner of changes in the Work, amounts not in dispute 1. • i ..... . . . „.. . . . ... , ...._ .,,,..... MA llocument A101" —2007, Ceprioht $01916,. 19111, 192S, 17 1991,1998, 1961.. 1963, 1%7, 1974, 1977„19117, 1991, 1997 end 24)07 by The AtIllikilli Init. Institute Oi Arolitects. -AO rights fOlOiltett WARNING: TN* me 00.COMMI. is :prolog:OW by tiC:. Copy:NOM bb bob lotombNobbi Tboottes, timtathortud mprottodiart Or 4tot4ttuttoo or Oil* Me Ctolouovoit, or any pot** of ft, may rottott to **war* otiett *oil otanitoat pt tioa„ aiod wilt. bo PrOtOgiUNd to IN -- ,r' noxineent *dent p8ci4b40 'tkatkt Ma taw IN $ document Wpt produced by AIA thot of . 16 . ,40:62 en 0546/2012 under. Order No7394281197_1 which expires on 07/21/2012, and k rot for male. User Notes: 1696ioat 3) , ii, , , 4 , „ I i 1 t I I shall he included as. provided in Section 7.3.9 of NIA Document A201 General Conditions I of the Contract for Construction; , i Add that portion of the Contract Sum properly allocable to materials and equipment &livered and , , .. , suitably stored at the site tor subsequent incorporation in the completed construction (or, if approved in advance by the (holer, suitably stored off the site at a location agreed upon in Switing), less ratainage of Five percent. ( .3 Subtract the aggregate of previrlus payments made boi the Owner; and i .4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate .for Payment i as provided in Section '15 of AIA Document A201 i -,1 § 5,1.7 The progress payment amount determined in accordance with Section 5,1.6 shall be further .modi lied under 1 i the following circumstances: J .1 Add, upon Substantial Completion of the Work, a sum 91.1111cient to increase the total payments to tht 4 full amount ofthe Contract Sum, .less such amounts as the Architect shall determine for incomplete t retainage applicable to such work and unsettled claims; and i (Section 9.8..5 of AM Document A201-2007 requitrs wlease o f eopplicable retontage upon 1 Substantial C:bmplelicin tiW01*.u.lth consent qf surety, if any.) .1 I „2 Add., if final completion c,f the Work is thereafter materially delayed through no fault of the i Contractor, any additional amounts payable in accordance with Section 9..10.3 of A1A fkcument r i A201-2007. "4 '. I § 5,1,8 Reduction or limitation of retainage, if any, shall be as follows: i I alit ht intended, prior to Substarnial Contpletion qi the entire l'f to reduce or limit the rekoinage resulting,frOM 1 the perrentages inserted in Sections 5.1.6 I and 5,1.62 above, and this is not eviained elsewhow in the Contiaot 4 , . I Mx! nments, 'wed /it, g , prot"osioinr for such retluction or limitation.) , I None i :4 4 4 § 11.9 .Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for I materials or equipment utt ich have not been delivered and stored at the site. i , 4 § 5.2 FINAL PAYMENT i , § 5,2.1 Final payment, constituting the entit'e unpaid balance of the Contract Sum, shall be mad by the Owner to the 1 Contr.actor when . 1 1 I the Contractor has hilly perfixmed the Contract except fix the. C'ontractoes responsibility to comet 1 I . Arork as provided in Section 12.2.2 ol .•1A. Document A201-2007, and to satisfy other requirements. 1 if any, which extend beyond final payment; and .2 a final Certificate fin' Paymern. has been issued by the Architect. i § 5.2.2 The Owner's final paymeid to the Conti actor shall be made no later than 3D days after the issuance of the Architect's final Certificate fix Payment, or as tbilows: 1 , i , , ARTICLE 6 DISPUTE RESOLUTION , § 6,1 INITIAL DECISION MAKER The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of MA Document A201-2007, unless the parties appoint below another individual, not a party to this Agreement, to 5C1"Ve us Initial Lkeision Maker. ()' the pen.tits mntually agree, insert the "Tao fe, culdress 4'Ind other conkrt nTiOnnation qf the Initial Dec ision bloke'', if other than Ow Architect) , : , , , , MA Document A101 ru — 2007. Copyrolo tars, tam, 1925, 1937„ 1951, 1950, 1901, 163, 1997, 1974, 1977, 1997, 1991, 1997 and 2007 by The. Ameriort , Snit Inseteute of Architects, All rights reseresd WARNING:1We Ate Document it muter:UN by WS, Couright bow non interttatkmot TrOSikt*. UttiAlthOrtad g . , W 004.4600 Or diO" Of tfill AtA ' accom9 Of MrtY PO4194114 lb M91 molt in wevvar$ ciVit mod atimittol ponoltio$, and orin bo musecutod to thy '''' i mosimum extent possibto under the laW, Thif4 &carmen was. produced by Afik savors al 1441915 co 09102012 4NC Order No7'394281197_1 which r. (Wire& On 07t21/2012, and 1$ net for resets:. User Notes: 0752398190) , lai 4 .1. 1 § 6.2 BINDING DISPUTE RESOLUTION . . 1 For any Claim subject to, but not resolved by, mediation pursuant to Section 153 of AM Document A201,•2007, the method of binding dispute resolution shall be as :follows: 1 (Cheek the appropriate box ((de Owner and Contractor do not se lee rethod 04A:ding .dispute resolution 3 below, or do not subsequen* agree in witing to a hiding &grate resolution method other than litigation Claims will be resolved by lingaoon in a coon of competent foriSdietion) 1 1 Arbitration pursuant to Section 1.5A of MA Document A.2012007 i 1 I X I LitigatiOri ill a coutt of competent Jurisdietion 1. I 1 Other (Sped:JO i ARTICLE 7 'TERMINATION OR SUSPENSION 1 § 7.1 The Contract may he terminated by the Owner or the Contractor :as prcwided in .Article 14 of ALA :Document I A201•2007. § 71 The Work may be suspended by the Owner as provided in .Article 14 of AlA. Document A201-2007, ARTICLES MISCELLANEOUS PROVISIONS § 81 Where reference is made in this Agreement to a provision of MA Document A201•2007 or another Contract I Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract 1 Documents„ , 1 § 8,2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated I below, or in the absence: thereof, at the legal rate prevailing from time to .time at the place Where the Project is I located, 1 i (hqert rate ,of intetest agreed upon, if ony) 1 1 One Third Percent (0,33%) per - month 1 § 8,3 'the Owner's representtive: Warne, addrea and other inforrnotion) 1 • Paul Northam, Director of Parks and Recreation C4 Hail 500 Quartermaster Court. Suite 205 Jeffersonville. IN 47130 Telephone Number: 8 .1:?2.280.4704 FaxNumber: 812.285,6481 Email Address: pneatham@clotleff net § 8.4 The Contractor's representative: (Nam e mfriress awl other informa(ion) Bobby Libs, Vice President AK., Inc, 2916 Campion. Road Floyd Knobs, IN 47119 • Telephone Number: 812,921,9895 Fax Number 812.923,562R rclibsAamlinc.net § 8,5 Neither the Owners not the Contractor's representative shall be changed without ten days written notice to the other party. MA 1:10currieret A101 w - 2007, Coprightit) 1916, 1918, 1928,1 827, Mt f 988, 1861,1983,, 1987, 1.074., 1877,1987,, 1891. IOW and 2007 by Tha American Init. Itistituto iiii Ardialtecte, All rights reaervi4 WARNING:, 'Tht* Ate Oatiament fa rate:Wee by tVt. COpyrigiot ' W. international Tr#1049S, if omititortzed A . reitiodoelion or diabiteatiott of thilt§Atie 000l$Mtnt, er any potion of ft, may result In severe dive and or:WOW pogultioo., *go will be pros,00ttio lb WO '''' i m.00010. eateet peatiAtie .tiatay Gie haw This 4006n:wit was producaid by AIA 60ftware at 14:1811. en OS/181202 under Oder No73842811071 wflith opiros on 07/21/2812 . and id not fey role, Wow Notes:. (1752398153) , . . , .. ,,. f 1 i A ii i § 9,6 Other provisions: : t i 1 ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS i §9.1 The Contract Documents,. except kw :Modifications issued ratter execution of this Agreement, are enumerated in 1 i the sections blow. § 9.1,1 The Agreement is this executed MA Document A10 Standard Form of Agreement Between Owner and Contractor, § 9,11 The General Conditions. are .A IA Document A20 I —2007, General Conditions of Ow Contract for I I. Construction, 1 § 9.1.3 The Supplementary and .other Conditions of the Contract: i Document Title Date Pages 00810 Supplementary 'General 04/06/12 Eighteen (1 8) Conditions. i , § 914 The Specifications: 1 (Either fist the Specifications hem cm refer to On exhibit attached to tifti.,.g Agreement) 1 i 1 :index of Specifications --- °Exhibit Al' i 1 Section Title Date Pages i 1 1 §915 'The. Drawings: I . (Either kit the Drawings here or tlfer to an exhih'4 altar hed to this Agreement) 1 Index of Drawings — "Ekhibit B" 1 Number Title Date i § 9,1,9 'the Addenda„. if any: I 1 Number Date Pages One(1) 04426/12 Two (2) 04/30, I 2 One (I) Portions of Addenda relating ft bidding requirements are not part of the Contract Documents unless the bidding. ., requirements are also enumerated i.n this Article 9. § 9.1.7 Additional documents, i any, .forming part of tit e Contract Documents: ,1 MA Doetnnent E201 Digital. Data Protocol Exhibit, if completed by the parties, clr following: . . .2 Other documents, if any, listed below, (list here any additional documents that are intended to/Orin part qf the Cantract Documeno AM Document 4201-200.7 pi-ov ides that bidding requirements such as advert/Igen:ern or invitation to bid, Insnyfr lions to Bidders, .sample lin-tits and the Contractor!: bid are not patl 4rthe Conn. Documents unless enumentted in ibis Agreement n'te,i. should be listed hit if intended ft) be port .orthe (.thitract DOCIrnients) AtA Document A101" 2007. Copyrt4ht 01914. 1918, 1925,, MI, 1951, 1958„ Mt 1053, 1007,1974. 1977, 1987, 1991. 1907 and 7t197 :by The Ance Init. Institute of .Architacts. All rights ressmiedi ANANN$NG Tide /LA DOCUMOM 4, protected by ttA. GopyriUM Le 00 roteratrboost TreettectIrtnathorizab 7 , tom0 ordistilionteri of thlis.At 0 Donbass*, or any portico of it taw omati to 60:ots 010 sod cdratast pronibtes, *Mt Witt to0 00;44 i:0 90:0, . i . 4W,gittnati OSiel rpossIble undertne taw, This document was pt)odueed by AIA. software at 14!.19:'.15 no W10;2012 under Order No.7384281197_1 Whch expires cm .07/2 *.,f2012,.etull is rvt or resale> ..:. User Notes; (1752396154 ..: i 1 i i i ARTICLE 10 INSURANCE AND BONDS , The Contractor shall purchase and maintain ill:•urailee and provide bonds as set forth ill Article 11 of'AIA Document A201-2007, (Stairs banding r oqulr c.'iii .'iris, Kam.; and limits of liability fint lrtulr iurcc r'eiJaked in Article 11 V11(r1 Dvcrrrrrertl 4201- 2007.) i Type of Insurance or bond i Limit of liability or bond amount ($0,00) I Performance Bond & Payment Bond Contract Sum Insurance (various) Scheduled in 00810 Supplementary General Conditions 1 This Agreement entered into as of the clay and year first written above, I, OW R (,Slgna(rnti°) CONTRACTOR (Sl rfrarrrle) 1 Paul Northian1, Director of Parks and Recreation Bobby fibs, ' (Pi /ntrd ,u:,,, � and title GAD t > (Printer/ name and litle) i i i l i F i i i t 1 R e p C , I hilt A1A Document At01 to — 2007. Copyriahl 1815, 1918, 1025, 1937, 1051, 1988, 1901, 1993, 1967, 1E 1907, 10)1, 1997 and 2007 by The Amarlcun Inslltute of Arehitecla, MI rights rosorvod� WAFINIA1at 71110 AIA bocurnont is protunlad by U. C�tpyt►Qltt Law and International Treanor:. Unauthorized roprorlucUon or dlalrlbullort of 11ria AlA Doormat, or arty portion of 11, may manic In savory civil told criminal ptitti*Itlks, and w111 try prosecutor/ to Rho 8 / ma:litotnit olrtant lrossibio undo/ the law. This daa:manlwas produced by AIA aottwsre al 11:10;1S alt 09/10/2012 under Order No.7304241197_1 which e4 UAS On 07/21,2012. and is not for resale, User Notoe: (17523001931 I 1 I I 1 1 i i 1 "Exhibit A" CITY OF JEFFERSONVILLE 1112.02 2012 VISSING PARK 04/06/2012 INDEX TO SPECIFICATIONS T S BIDDING REQUIREMENTS Section 00100 Notice to Bidders AIA A701 Instructions to Bidders Section 00210 Supplementary Instructions to Bidders Section 00220 Contractor's Bid Submittal Checklist Section 00300 Contractor's Bid Form: Public Works Section 00301 Proposal Form: Part I (Form 96, Revised 2010) I Section 00302 Proposal Form: Part II (Form 96, Revised 2010) j CONTRACT FORMS S ection 00410 Bid Security cunty Form AIA A310 Bid Bond 1 Section 00430 Subcontractor List j Section 00500 Agreement Form AIA A101 Standard Form of Agreement Between Owner and Contractor Section 00600 Contractor's Bond for Construction AIA A312 Performance Bond and Payment Bond Section 00670 Escrow Agreement CONDITIONS OF THE CONTRACT Section 00700 General Conditions AIA A201 General Conditions of the Contract for Construction Section 00810 Supplementary General Conditions Section 00830 Wage Determination Schedule Insert Wage Scale DIVISION 1 GENERAL REQUIREMENTS Section 01110 Summary of Work - Single Contract Section 01130 General Construction Requirements Section 01220 Contingency Allowance Section 01230 Alternates Section 01300 Project Meetings Section 01310 Project Management and Coordination Section 01320 Construction Progress Documentation Section 01330 Submittal Procedures Section 01370 Schedule of Values Section 01400 Quality Control Section 01420 References Section 01510 Temporary Utilities Section 01520 Temporary Construction Section 01610 Product Delivery and Handling Section 01630 Product Options and Substitutions Section 01640 Owner Furnished Equipment Section 01732 Cutting and Patching Section 01738 Selective Demolition Section 01740 Cleaning Section 01770 Closeout Procedures Section 01780 Closeout Submittals INDEX TO SPECIFICATIONS INDEX -1 t I 5 "Exhibit A" CITY OF JEFFERSONVILLE 2012 VISSING PARK 1112.02 1 04/06/2012 DIVISION 2 SITE WORK 1 Section 02110 Site Clearing Section 02200 Earthwork Section 02201 Riparian Zone Restoration Insert Redwing Report Section 02280 Termite Control Section 02370 Erosion Control Section 02510 Asphalt Concrete Paving (IN) I Section 02710 Water Distribution Section 02720 Site Drainage Insert Storm Structures Cutsheets I Section 02730 Sanitary Sewage Section 02735 Sewer Lift Station Section 02751 Cast In Place Detectable/Tactile Warning Surfaces Section 02810 Irrigation System Section 02825 Welded Ornamental Fence System Section 02830 Chain Link Fences Section 02835 Segmented Retaining Wall Section 02870 Site Furnishings Section 02885 Playground Equipment 1 Section 02921 Athletic Field Soil Preparation Section 02930 Lawns and Grasses Section 02950 Trees, Plants and Ground Covers Section 02951 Maintenance Edging DIVISION 3 CONCRETE Section 03300 Cast -In -Place Concrete DIVISION 4 MASONRY Section 04100 Mortar Section 04150 Masonry Accessories Section 04160 Masonry Reinforcement Section 04220 Concrete Unit Masonry Section 04270 Glass Unit Masonry Section 04420 Cut Stone Section 04510 Masonry Protection and Cleaning DIVISION 5 METALS Section 05500 Miscellaneous Metals Section 05560 Removable Metal Bollards DIVISION 6 CARPENTRY Section 06100 Rough Carpentry Section 06190 Prefabricated Wood Trusses Section 06400 Architectural Woodwork INDEX TO SPECIFICATIONS INDEX -2 lemiumm i jj "Exhibit A" CITY OF JEFFERSONVILLE a 2012 VISSING PARK 1112.02 04/06/2012 4 J DIVISION 7 THERMAL AND MOISTURE PROTECTION Section 07200 Insulation Section 07264 Foam Insulation Section 07310 Shingles Section 07470 Metal Soffit Panel Section 07600 Flashing, Sheet Metal and Roof Accessories Section 07625 Aluminum Soffit Section 07650 Flexible Flashing Section 07900 Joint Sealers DIVISION 8 DOORS AND WINDOWS Section 08110 Steel Doors and Frames Section 08305 Access Doors Section 08331 Coiling Counter Door — Powder Coat Finish Section 08335 Overhead Coiling Door — Powder Coat Finish Section 08611 Clad Wood Windows Section 08710 Finish Hardware 1 if DIVISION 9 FINISHES Section 09250 Gypsum Drywall Section 09650 Resilient Tile Flooring Section 09700 Rubber Stair Treads and Risers Section 09900 Painting Section 09980 Concrete Floor Coating DIVISION 10 SPECIALTIES Section 10171 Solid Plastic Toilet Partitions Section 10350 Flagpole Section 10415 Glass Enclosed Bulletin Boards Section 10420 Plaque Section 10430 Exterior Signs Section 10440 Interior Signs Section 10522 Fire Extinguishers Section 10533 Cellular PVC Pergola System Section 10800 Toilet Accessories I DIVISION 11 EQUIPMENT Section 11480 Athletic Equipment DIVISION 12 FURNISHINGS No Items DIVISION 13 SPECIAL CONSTRUCTION Section 13127 Stadium Bleachers -Angle Frame Structure DIVISION 14 CONVEYING SYSTEMS No Items INDEX TO SPECIFICATIONS INDEX -3 i i i CITY OF JEFFERSONVILLE "Exhibit A" 2012 VISSING PARK 1112.02 04/06/2012 a 4 1 I DIVISION 15 MECHANICAL a I Section 15050 Basic Mechanical Requirements Section 15190 Mechanical Identification Section 15260 Piping Insulation Section 15410 Plumbing Piping Inside Building Section 15420 Plumbing Piping Outside Building Section 15430 Plumbing Specialties Section 15440 Plumbing Fixtures DIVISION 16 ELECTRICAL Section 16010 Summary of Electrical Work Section 16015 Electrical Coordination Section 16021 Concrete Work and Access Panels I Section 16025 ,t Codes, Fees and Standards Section 16050 Basic Materials and Methods Section 16111 Conduit Systems Section 16120 Wire and Cable Section 16164 Branch Circuit Panelboards Circuit Breaker Type Section 16170 Disconnect Switches Section 16199 Wiring Devices and Plates Section 16450 Grounding Section 16460 Transformers Section 16470 Distribution Panelboards Circuit Breaker Type Section 16471 Feeder and Branch Circuits Section 16485 Motor Starter Section 16500 Interior Lighting Section 16510 Exterior Lighting Section 16526 Sports Field Lighting Section 16610 Electrical Heaters Section 16660 Wiring For Equipment Section 16734 Scoreboards I Section 16851 Electric Dryers Section 16950 Occupancy Sensors i END OF INDEX INDEX TO SPECIFICATIONS INDEX -4 irma rirmummomm "EXHIBIT B" ARCHITECTURAL DRAWING SHEET INDEX 1 VISSING PARK t 2012 Community Fields and Neighborhood Park Number Title GENERAL DRAWINGS G -I0 I OVERALL SITE KEY PLAN CODE SUMMARY FOR SITE BUILDINGS G -20I BASE BID SITE PLAN G -202 ALTERNATE SITE PLAN CIVIL DRAWINGS 4 C •001 SITE DEMOLITION PLAN C -101 SITE DEVELOPMENT PLAN C -102 PARK NORTH - SITE DIMENSION PLAN C -103 PARK SOUTH - SITE DIMENSION PLAN C-104 SOUTH PARK ACCESS DRIVE- DIMENSION PLAN i C -20I OVERALL SITE PLAN C -202 PAD GRADING PLAN C -203 PARKING LOTS AND ADJACENT FACILITIES GRADING PLAN C -204 BALI. FIELDS AND ADJACENT FACILITIES GRADING PLAN I C -205 PARKING LOTS AND ADJACENT FACILITIES - STORM SEWER PLAN C -206 BALL FIELDS AND ADJACENT FACILITIES - STORM SEWER PLAN C -207 STORM SEWER PROFILES 4 C •208 STORM SEWER PROFILES I C -209 STORM SEWER PROFILES C -301 EROSION CONTROL PLAN C -302 EROSION CONTROL NOTES C -40) SITE DETAILS , C-402 SITE DETAILS C- C 404 403 SITE SITE DETAILS C -405 SITE DETAILS C -406 SITE DETAILS J UTILITY DRAWINGS U -101 ELECTRICAL SITE PLAN U -201 SITE UTILITY LAYOUT il U -202 SITE UTILITY LAYOUT FIELD DRAWINGS F-101 DETAILED SITE PLANS - DOG PARK AND BASKETBALL COURTS F-102 DETAILED SITE PLANS - PRACTICE GREEN AND PLAYGROUNDS F -F03 DETAILED SITE PLAN - OVERALL BALLFIELD LAYOUT F -104 SOFTBALL FIELD NO. 1 - DETAILED SITE PLANS AND IRRIGATION PLANS F -105 SOFTBALL FIELD NO. 2 - DETAILED SITE PLANS AND IRRIGATION PLANS F -201 TEAM BENCHES F -301 FIELD DETAILS LANDSCAPE DRAWINGS L -I0I SITE FURNITINGS LAYOUT PLAN - PARK NORTH L -IO2 SITE FURNITINGS LAYOUT PLAN - PARK SOUTH L-201 LANDSCAPE MASTER PLANTING PLAN - PARK NORTH L -202 LANDSCAPE MASTER PLANTING PLAN - PARK SOUTH L -203 PLANT SCHEDULES DETAILED PLANTING PLANS L-204 TREE PRESERVATION PLAN L -205 LANDSCAPE PLANTING PLAN - PHASE I - PARK NORTH L -206 LANDSCAPE PLANTING PLAN - PHASE I - PARK SOUTH L -207 LANDSCAPE PLANTING PLAN - ALTERNATES - PARK NORTH L -208 LANDSCAPE PLANTING PLAN - ALTERNATES - PARK SOUTH L -301 SEED AND MULCH PLAN - PARK NORTH L -302 SEED AND MULCH PLAN - PARK SOUTH L-40I LANDSCAPING DETAILS L-402 LANDSCAPE DETAILS "EXHIBIT B" ARCHITECTURAL DRAWING SHEET INDEX VISSING PARK 2012 Community Fields and Neighborhood Park 1 Number Title _ 1 QUIL.DING DRAWING$ B- I01 PRESSBOX BLDG - FOUNDATION PLAN PRESSBOX BLDG - 2ND FLOOR FRAMING PLAN PRESSBOX BLDG - ROOF FRAMING PLANS 8.102 RESTROOM BLDG - FOUNDATION PLAN / RESTROOM BLDG - ROOF FRAMING PLAN MAINTENANCE BLDG - FOUNDATION PLAN MAINTENANCE BLDG - ROOF FRAMING PLAN 13-103 SHELTER HOUSE PAVILION - FOUNDATION PLAN SHELTER HOUSE STRUCTURAL DETAILSION -ROOF FRAMING PLAN B -201 PRESSBOX BLDG - ARCHITECTURAL PLANS 8-202 PRESSBOX BLDG - REFLECTED CEILING PLANS PRESSBOX BLDG - ROOF PLANS 8 -203 RESTROOM BLDG - ARCHITECTURAL PLAN ii MAINTENANCE BLDG - ARCHITECTURAL PLAN B -204 RESTROOM BLDG - G REFLECTED CEILING PLAN RESTROOM BLDG - ROOF PLAN MAINTENANCE BLDG - REFLECTED CEILING PLAN MAINTENANCE BLDG - ROOF PLAN 8 -205 SHELTER HOUSE PAVILION - ARCHITECTURAL PLAN 8-206 SHELTER HOUSE PAVILION - REFLECTED CEILING PLAN SHELTER HOUSE PAVILION - ROOF PLAN 8-301 PRESSBOX BLDG - EXTERIOR ELEVATIONS B -302 RESTROOM BLDG - EXTERIOR ELEVATIONS MAINTENANCE BLDG - EXTERIOR ELEVATIONS B -303 SHELTER HOUSE PAVILION - EXTERIOR ELEVATIONS B -401 SECTIONS AND DETAILS B-402 SECTIONS AND DETAILS B-403 SECTIONS AND DETAILS 8-404 DOOR AND WINDOW SCHEDULES AND DETAILS CASEWORK ELEVATIONS AND SCHEDULE MISCELLANEOUS DETAILS B -501 PRESSBOX BLDG - PLUMBING AND MECHANICAL PLANS 13-502 PRESSBOX BLDG - LIGHTING AND POWER PLANS B -503 RESTROOM BLDG - PLUMBING AND MECHANICAL PLANS RESTROOM BLDG - LIGHTING AND POWER PLANS B -504 MAINTENANCE BLDG - PLUMBING AND MECHANICAL PLANS MAINTENANCE BLDG - LIGHTING AND POWER PLANS SHELTER HOUSE PAVILION - LIGHTING AND POWER PLANS 13-505 MECHANICAL AND ELECTRICAL SCHEDULES MECHANICAL DETAILS B -506 ELECTRICAL PANEL SCHEDULES SERVICE RISER DIAGRAM Fl F(TRIrAI IlFTAII s