HomeMy WebLinkAboutChange Order No.1 Coopers Lane South Sewers CHANGE ORDER - EXTRA WORK AGREEMENT NO. 1 JOB NO. 0809 Project Name: Coopers lane South Sewers Owner. Jeffersonville Sewer Board Contractor: Dan Cristiani Excavating, Inc. General Contract Additions 1 Deduct in quantity of 8' Sanitary Sewer, SDR 35 !Installation) by 53 LF @ $53.32/IF (Pay Item 2) - $2,825.96 2 Deduct In quantity of 8' Sanitary Sewer, SDR 35 (Material) by 53 LF @ $2.63/LF (Pay Item 2.1) -5139.39 3 Increase In quantity of Property Service Connections (Installation) by 7 @ $1,037/ea. (Pay Item 4) 57,259.00 4 Increase In quantity of Property Service Connections (Material) by 7 @ $439/ea. (Pay Item 4.1) 53,073.00 5 Increase in quantity of 4' Force Main (Installation) by 23 LF @ $30.91/LF (Pay Item 10) $710.93 6 Increase in quantity of 4' Force Main (Material) by 23 LF @ $1.54/LF (Pay Item 10.1) 535.42 7 Decrease In quantity of Silt Fence by 2001F @ $L80 /lF (Pay Item 11) 4360.00 8 Decrease in quantity of Concrete Encasement by 75 LF @ $23.011/1.F (Pay Item 12) 41,725.00 9 Decrease in quantity of Surface Asphalt by 94.45 Ton (9 561.50/Ton (Pay Item 14) 45,808.68 10 W mp Sum Modifications @ 5005 Hamburg Pike due to Water line Confkt (Sue Attached) 53,857.59 11 Fence & Asphalt Modifications @ Pump Station Site (See Attached) 51,314.00 Subtotal 55,390.91 Total Change Order: increase in the amount of Five Thousand Three- Hundred and Ninety Dollars and NtnetyOne Cents. 55,390.91 Consulting Engineer: Jacobi, Ioombs & Lanz, Inc. 9 Enginee S 1 ,:l Date Owner's Approval: Jeffersonville Sewer B VI)a,7)/( lure Owner(s) of owr(sl Contractor's Approval: Dan Cristaan) Excavating, Inc. /' (' QA t r 11 it\ O, /- Authorized Representative Signature (] Date • DAN CRISTIANI EXCAVATING CO., INC. 1221 Old Hwy. 3113 P.O. Box 2427 CIarksville, SN 47131 -2427 PHONE (812)282 -9866 Pax (8I2)282 -9908 PROPOSAL To: City of Jeffersonville Attn: Josh Hillman DATE: June 30, 2011 JOBBITE: Cooper Lane Proposal for extra work performed on Line D approximately station 22 +00 due to 16" water line interference. The proposed 8" route was already sawcut and some excavation before being stopped and redirected. Proposed 8" area Sawcut on 8" main 234' a $1.35 $315.90 Asphalt restoration 60'X 4.5' 5 ton. a $80 $400.00 Stone backfill 20 ton 0 7.00 $140.00 Proposed lateral alternate route 6" 6" pipe 120 foot a 22.00 $2640.00 6" sawcut Coopers 80' a $1.35 $ 108.00 6" Bends 45 2 018.00 $ 36.00 Stone backfill 80' 80 tone ® 7.00 $ 560.00 Asphalt patch 200' 3 tons ® 80.00 $ 240.00 Normal Lateral Deduction 6" pipe 28' a $22.00 - $ 616.00 Sawcut 20' a $1.35 foot - $ 27.00 Stone Backfil] 30 Ton a $7.00 - $ 210.00 Asphalt Patch 20' 1 ton a 80 - $ 80.00 Sub total $3506.90 Mark up %10 350.69 Total Change $3857.59 Acceptance to constitute a contract between us. This bid to hold for a period of 30 days from date. Terms: Net I5 days following date of invoice. DAN CRIBTIANI EXCAVATING CO., INC. ACCEPTED 444 Au/ BY BY DATE Or \PROPOSALS 2 C11\A ULRRX PROPOSAL PORR.doc DAN C.RJSTI NI EXCAVATING CO., INC. 1221 Old Hwy. 31E P.O. Box 2427 CIarksville, IN 47131 -2427 PRONE (8I2)282 -9866 Fax (812)282 -9908 PROPOSAL To: City of Jeffersonville Attn: Josh Hillman DATE: July 26, 201I JOBSITE: Coopers Lane Lift station Proposal for additional fence and asphalt at the Coopers Lane Lift Station to allow for additional room for the portable generator. Approximately 10' x 38' Remove previous set post $150.00 Hartlage Pence $385.00 Stone base 20 ton $185.00 Libs Paving 4" 9 ton $594.00 Total add $ 1314.00 Acceptance to constitute a contract between us. This bid to hold for a period of 30 days from date. Terms: Net 15 days following date of invoice. DAN CRISTIANI EXCAVATING CO., INC. ACCEPTED BY BY DATE Gi \PROFOSALS 3011 \COOpere Lane Life Station Peace.doc --