The Jeffersonville Redevelopment Commissioners met on Wednesday May 7, 2003 at
5:30 PM in the Mayor's Fourth Floor Conference Room. This meeting was held to hear
Proposals for the Tenth and Spring Street Project. The following were present:
Barry Cahill, President
Kyle Williams, Vice President
Ed Zastawny, Secretary/Treasurer
Les Merkley, Commission Member
Absent:
Ron Ellis, Commission Member
Staff:
Gayle Robinson, Redevelopment Director
Kathy Haller, Consultant
Mary Sue Ellenbrand, Assistant to the Redevelopment Director
Anne Marie Galligan, City Attorney
Thomas Galligan, Mayor
AGAN DEVELOPMENT:
Mr. Jeff Agan and Mr. John Agan presented their proposal for the Tenth and Spring
Street Project. The name of the project would be Rivergate Commons, which would
consist of medical offices and retail space. The purchase price would be raised to
$550,000.00 if performance bond is deleted and tax abatement grant. Deed restrictions
will be accepted (No auto related stores, no convenience stores, no free standing fast
food). Architectural style will be reminiscent of Jeffersonville's early river heritage.
Durability of a complete masonry building assures aesthetic longevity.
METROPOLITAN UROLOGY:
Mr. Mike Shannon, Chief Operating Officer, Metropolitan Urology, PSC presented
plans for atwo-story16,000 square foot facility with plans to increase its staff and
presence in Jeffersonville. The practice, owned by eight doctors, operates seven distinct
offices in Louisville, Kentucky and six offices in Southern Indiana. The main office is
currently in Spring Hill Commons in Jeffersonville, where 40 employees currently work
in the 4500 square foot facility.
Ample landscaping will be planted between building and street to create an
aesthetically appealing corner. Behind the building the site will accommodate a covered
drop-off area. and a landscaped parking lot capable of accommodating 120 cars. The
proposed building will be steel frame with masonry veneer and aluminum windows.
SYMBION HEALTH CARE:
Mr. Mike French, CCIM, developer for ASC Physicians Group proposed a medical
building with total square footage of between 50,000 and 82,000 square feet. The first
floor surgical suites would require 16,000 square feet with another 3,000 square feet in
two separate lobbies for a total first floor footprint of 19,000 square feet. The building
will be situated such that traffic movements are facilitated through two separate covered
portico entrances.
Floors 2 and 3 will incorporate 16,000 gross square feet templates which will be
specifically laid out and plumbed for physician's offices and medical suites.
Up to two additional floors maybe incorporated for different but ancillary use.
Estimated cost of construction including on-site improvements for vehicular
movement, landscaping and lighting is estimated to be from $5,000,000.00 to
$8,200,000.00 for shell construction of operating suites, vanilla box medical office, and
shell construction for hotel use (if implemented). The costs of equipment and high-
standard finish for medical uses will increase the total cost by $2,500,000 - 3,000,000.
APPROVED:
~` .,.~
~~