Loading...
HomeMy WebLinkAbout01) Change Order #2 CHANGE ORDER - EXTRA WORK AGREEMENT ~O. 2 JOB NO. 0815 Project Name: Annex "F" - Evergreen Circle Sewers Owner: Jeffersonville Sewer Board Contractor: Dan Cri!>tiani Excavating Co., Inc. 1. Contract Item No.1 - 8" PVC Gravity Sewer - 57 ft. Deletedbecause the 8" Gravity to be installed from - $2,889.90 Ex. MH Sta. 16+21.26 Line "E" to MH 40 Sta. 0+74.0.? Line "f' had been installed previously. 2. Contract Item No.5 - Manhole, Type "C" - MH 40 Station 0+74.00 Line "f' deleted because MH had - $1,702.00 been installed previously on another contract. 3. Contract Item No. 7 - INDOT Surface Asphalt - 2.0 tons added to extend the driveway on Line "r' + $187.80 at approx. Sta. 1+50 to pave over storm sewer patching ,area. . 4. Contract Item No.8 - Surface Milling - Item decreased because the only milling performed was in front of - $4,800.00 either concrete or asphalt driveways. ' 5. Contract Item No. 10 - Asphalt Price Adjustment - Deduction made beCaUse ofthe asphalt index prices. - $6,488.00 , ' TOTAL THIS CHANGE ORDER - $15,692.10 . The method of payment for this change order shall be a deduction in the amount of fifteen thousand six Hundred nine -two dollars and ten sents. ' - $15,692.10 Contractor's Approval: Dan Cristiani Excavating Co., Inc. q}~ W" Authorized Representative S\SYDNEY\WPDOC S\08\08151\08151-C 01