Loading...
HomeMy WebLinkAboutData Network TechnologyData Network Technology 2143 Colonial Dr Corydon, IN 47112 Phone: Fax: ~ 812-948-1618 812-948-5015 Client Project Quotation Proposal FIRM NAME: Jeffersonville City Hall Presented To: Tim Caudill SYSTEM TYPE OR TOPOLOGY: 100 BASE "T" ETHERNET CABLE LEVEL 6 COMPLIANT TO 2005 I.E.E.E. STANDARDS AND SPECIFICATIONS SCOPE OF PROJECT & DESCRIPTION OF TASK: Data Network Technology will network a total of 291 Cat 6 lines as shown on the blue prints. (The data and voice will be networked with Cat 6 plenum cable). All voice and data cabling will be terminated to patch panels in the MDF or IDF. We will install (2) 7' freestanding data rack with wirmanagment within the MDF and (1) in the IDF. From the Phone board within the MDF and IDF we will install a total of 175 pair Cat 3 cable for cross connect to the voice workstations. We will terminate the 175 pair cables to 66 blocks on the phone board at the d-mark and at the rack we will terminate the voice trunk cables to patch panels (1) pair per jack for a total of(5) 48-port patch panels total. All of the connections will be labeled with a cable number at each end of the cable, at the front of the patch panel and the faceplate that will identify which port in the patch panel and what distribution location the jack goes to. At the distribution locations we will ground and secure the racks. Each data drop will be tested using the WireScope 350 and a copy of the test results will be supplied to the customer. Data Network Technology will test, label, and verify the integrity of all the data lines using the WireScope 350. All cable installation is warranted for 10 years for workmanship and materials. MATERIALS SUMMARY: See attached Spreadsheet Site: Jeffersonville City Hall 12/05/05 Page 1 of 2 PROJECT COSTS MATERIALS : $ 31,975.00 LABOR: $ 15,330.00 PROJECT TOTAL : $ 47,305.00 Please review the abo e~propo~s f~ou wish to proceed with this project please return this form with the authorizing/igl~l~t.~l~; F/iX # 812-948-5015 You will be contacted to schedule your Data Network Technology 2143 Colonial Dr Corydon, IN 47112 Phone: Fax: 812-948-1618 812-948-5015 Client Project Quotation Proposal FIRM NAME: Jeffersonville City Hall Presented To: Tim Caudill Frj Name: Date Page 2 of 2 1215/2005  Quantity Manufacture Description 52 General CAT 6 Plenum CABL~e 1000 Berk-Tek CAT 3 50 p~jr Plenum CABL~ 250 Berk-Tek t 2 Strand Multimode Plenum Armored Cable 2 Panduit Rack Mount Fiber Inclosures loaded w/SC Panels 26 Cernin~ $CM ultimode Connectors 272 Panduit 2ATEGORY 6 Voice Jacks 568 A&B~ 318 Panduit DATEGORY 6 Voice Jacks 568 A&B Blue ~ 175 Panduit DATEGORY 5 Voice Jacks 568 A&B White backbone 340 Panduit Blank Inserts IVORY 15~ Panduit 4 Position Executive Fac~ IVORY 1~ ~Panduit 48 PORT PATCH PANEL Sna~ 5 Panduit 48 PORT PATCH PANEL Cat 3 110~ 20 Panduit WIRE MANAGBMENT 2U WMP1E 18 Panduit Slolled Wall Wir~ 1~ --Panduit ~/nn Duct Cover $'Lon 3 Chadsworth 7' Free StandinG Black Racks 2 Chadsworth Ladder Tra_v Black 18' x 10' 3 Panduit Ground Clamb 2 Allen-Tel Backboard Blue for 66 Blocks 2 Allen-Tel White Board 20 Siemon Wire S~ols w/Screws I Greenlee Bu~oket Strinq ~ ~Panduit 3roun~ 8 Siemon 36 Blocks ~ Quiktron 5' Booted Cat 6 Patch Cables ~ 285 0 Quiktron 14' Booted Cat 6 Patch Cables ~ 500 0 Alien-Tel 7' Cat 3 Patch Cables 1.23 0 Panduit ' Booted Cat 6 Patch Cables ~ 690 0 Panduit 14' Booted Cat 6 Patch Cables 10.50 1~,00-427-0355 Dallmann Systems, Inc. 1247 Bridgeport Dr. Jeffersonville, Indiana 47130 812-283-7255 Fax 812-283-4247 QUOTATION November 4, 2005 The Estopinal Group 903 Spring St. Jeffersonville, In 47130 282-3700 CCTV SYSTEM JEFFERSONVILLE CITY HALL 282-3700 2 BOSCH Intuikey Remote Keyboard 1 $ 500.00 ' $ 500.00 18 19 22 23 27 I Fq.ipmeut & Materials Total $19,732.50 Notes: Rough-in conduits and 120vac to power supplies, Installation Package $4,725.00 outdoor cameras, and DVRs by E.C. Tax $0.00 Base Project Price $24,457.50