Loading...
HomeMy WebLinkAboutTenth Street Improvement Projec (2)TENTH STREET IMPROVEMENT PROJECT SUPPLEMENTAL AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL SERVICES This Supplemental Agreement, made and entered into this afl~. day of ttn~ttc.~ 2002, by and between the Board of Public Works and Safety, Jeffersonville, Indiana, hereinafter called the OWNER, and Jacobi, Toombs and Lanz, Inc., a firm of Professional Engineers, 120 Bell Avenue, Clarksville, Indiana 47129, hereinafter referred to as the ENGINEER. WITNESSETH WHEREAS the OWNER and the ENGINEER did, on November 13, 1995, enter into an agreement to implement the reconstruction of the Tenth Street Improvement Project, which included preliminary studies, survey, design, plans, specifications, utilities, and other items, and WHEREAS, the scope of the original project did not include the widening of Tenth Street and its resulting acquisition of additional rights-of-ways, and WHEREAS, it has further become necessary to develop the project in two (2) separate phases, described as follows: Phase 1: Beginning at the CSX railroad crossing located approximately 350 feet west.of the Tenth and Spring Street intersection, and proceeding east along Tenth Street to a point between Dutch Lane and Pratt Street, a distance of approximately 3,943 feet. Phase 2: Beginning at a point between Dutch Lane and Pratt Street, the terminus of Phase 1, and proceeding east along Tenth Street to Main Street, a distance of approximately 1,357 feet. AND, WHEREAS, in order to provide for the completion of this work it is necessary to amend and supplement said agreement. Now, therefore, it is agreed by and between the parties hereto to the following additions or changes in the agreement: 1. The following paragraph is added to Section 1.4, Final Design Phase: 1.4.6 The Engineer shall prepare legal plats and descriptions for all parcels from which additional right-of-way is required. The following paragraphs are added to Section 1, Basic Services of the Engineer: 1.7 Right-of-Way Management, Title Work, Buying 1.7.1 The Engineer shall manage and coordinate al of the work required for the acquisition of additional rights-of-ways. 1.7.2 The Engineer shall provide the appropriate tit!e, searches to ascertain ownership of the properties affected by right-of-way acqms~txon. 1.7.3 The Engineer shall provide a Buyer or Property Acquisition Specialist who will contact the affected property owners, make the offers, and process the required documents to purchase additional rights-of-ways. Any property that cannot be obtained by standard negotiations will be turned over to the City Attorney's office for condemnation proceedings. 1.7.4 The Engineer shall recommend to the OWNER, Appraisers and Review Appraisers who will prepare the fair market value of all lands that need to be acquired for right-of-way. The Engineer shall coordinate and manage the Appraisers and Review Appraisers. The cost of preparing these appraisals will be billed directly to the Owner and are not included in this agreement. Paragraph 2.2.1 of Section 2.2, Resident Inspection Services During Construction, is changed as follows: 2.2.1 The Engineer, if requested by the Owner, shall...(the rest remains unchanged). Paragraph 5.1.1, Basic Services, of Section 5, Payments to the Engineer, is changed as follows: For Section 1.3, Preliminary Design Phase, a lump sum fee of fifteen thousand two hundred dollars ($15,200.00) for Phase 1, and a lump sum fee of five thousand two hundred fifty two dollars ($5,252.00) for Phase 2. For Section 1.4, Final Design Phase, a lump sum fee of one hundred six thousand three hundred forty dollars ($106,340.00) for Phase I, and a lump sum fee of fifty one thousand four hundred dollars ($51,4(30.00) for Phase 2. 2 For Section 1.5, Bidding and Negotiating Phase, a lump sum fee of three thousand dollars ¢3,000.00) for Phase 1, and one thousand dollars ($1,000.00) for Phase 2. For Section 1.6, Construction Phase, a lump sum fee of sixteen thousand thirteen dollars ($16,013.00) for Phase 1, and a lump sum fee of five thousand five hundred thirty four dollars ($5,534.00) for Phase 2. For Section 1.7, Right-of-Way Management, Title Work, and Buying, a lump sum fee of thirty five thousand eight hundred dollars ($35,800.00) for Phase 1, and a lump sum fee of thirty five thousand eight hundred dollars ($35,800.00) for Phase 2. Paragraph 5.2.2, Section 5.2, Times of paYment, is changed as follows: TOTAL PHASE PROJECT PHASE 1 PHASE 2 Preliminary Study, Report, Surveying $ 50,051 Preliminary Design 15,200 5,252 Final Design, including Signals 86,340 32,200 Plats and Descriptions 20,000 19,200 Right-of-Way Management, Buying, Title 35,800 35,800 Work Bidding and Negotiating 3,000 1,000 Construction Management 16,013 5,534 Subtotal $ 50,051 $ 176,353 $ 98,986 Total Proiect $ 325,390 6. Paragraph 5.1.2.4 of 5.1.2, Additional Services, is changed as follows: 5.1.2.4 Resident Project Inspection For inspection and resident inspection services during construction under paragraph 2.2.1, if requested by the Owner, payment to the Engineer shall be established by separate agreement, and is not part of this contract. 3 ~- f;- ~' JohnH. Toombs, J]'(./ ~,/ Vice President and Tre~a~urer 4