Government Contract Coversheet
Please note: All information MUST be completely filled out and submitted to Clerk's Office
within 48 hrs of execution.
Date Submitted to Clerk: 6/18/2026
Wastewater
Department:
Jacobi, Toobs & Lanz, LLC
Vendor Name:
Sign Date: 6/18/2026
Ending Date: 10/31/2026
Amount of Original Contract: $69,500
Is this an amendment or change order
to original contract?
Amended Contract Amount:
Purpose:
Design the Replacement of the River Ridge
Off-Site Lift Station Force Main
For Clerk's Office to fill out
4'/(11/g6P
Date uploaded to Gateway:
ATTACHMENT B: WORK ORDER FORM
WORK ORDER NO. 2026-5
RIVER RIDGE OFF-SITE FORCE MAIN REPLACEMENT
SURVEY, DESIGN, PERMITTING AND BIDDING
Date: 4 die po
In accordance with the General Services Agreement between the City of Jeffersonville, Indiana, acting
thru its duly appointed Sewer Board (OWNER), and Jacobi, Toombs and Lanz, LLC (CONSULTANT),
dated 04/01/2010, this WORK ORDER is the written authorization to the CONSULTANT to provide the
work described herein, in accordance with the attached schedule, and fees.
Work: The Work shall be as described in Section A of this Work Order. CONSULTANT shall furnish all
labor, materials, supplies, equipment, supervision and services necessary for and incident to the
performance of the Work. CONSULTANT represents that it has thoroughly reviewed the Work and the
General Services Agreement and that it accepts the Work and the conditions under which the Work is to
be performed.
Schedule: The Schedule shall be set forth in Section B of this Work Order. CONSULTANT represents
that the Schedule is reasonable and achievable.
Payment Terms: Payments to the CONSULTANT shall be as described in Section C of this Work Order.
Terms and Conditions. The terms and conditions of the General Services Agreement referenced above
shall apply to this Work Order. This Work Order also incorporates, in Section D, all the terms and
conditions required to be included in it by the General Services Agreement.
OWNER: CONSULTANT:
Jeffersonville Sewer Board Jacobi, Toombs, and Lanz, LLC
Jeffersonville, Indiana 1829 E. Spring Street
500 Quartermaster C urt New Albany, IN 47150
Jeffersonville, I dia 47130 (812) 945-9585
(812) 285-640
�,,- Pr-�- B
By Y
Mayor Mike Moore, Presid nt Michael C. Harris, P.E.
President
ByOrr-1-4--•1, � Witness
Dale L. Orem, Member Josh Darby, P.E.
Director-Construction Services
By .�,tILF-tSr, 0`A-
William A. Saegess r, .E., P.L.S., Member
P:\Projects\JTL\Archive\New Albany\87o8S-Jeffersonville General Sewers\87o8S-2010\2026-5 RR Off-Site Force Main Replacement Survey and Design.doc
4 1
WORK ORDER NO. 2026-5
SECTION A - DESCRIPTION OF THE WORK
Jacobi, Toombs and Lanz, LLC (JTL) shall provide Professional Engineering services for the project
described as follows:
• Topographic Survey
JTL will perform topographic surveying to identify existing terrain and utilities as marked in the
field along the proposed force main alignment, which is preliminarily proposed to run along the
existing force main alignment from the River Ridge Off-Site Pump Station, along the north side of
the building located at 225 Lewman Way, to the point of pipe material change near an existing air
release valve on the west side of Lewman Way, JTL will also research and resolve existing right-
of-way and property lines. The deliverable will be in AutoCAD format to be used for Engineering
Design. The project corridor is estimated to be approximately 1,530' in length and 100' in width.
• Geotechnical Investigation
JTL will retain the services of a Licensed Professional Geotechnical Engineer to investigate and
provide a report on the findings of their subsurface investigation. A total of five (5) borings at a
depth of ten (10) feet will be provided.
• Design — Construction Plans
JTL will design and provide construction plans for the replacement of the force main along the
proposed alignment described above, meeting City and Wastewater Construction Standards. It is
anticipated that approximately 1,530' of 8" diameter PVC force main sewer will be installed as
part of this project in order to replace the existing 8" cast iron force main that is in poor condition.
• Permitting
JTL will complete the Sanitary Sewer Construction Permit Application using IDEM's most current
application forms and requirements. The application will be submitted to the City of Jeffersonville
Engineering Department, as the City is a self-permitting entity.
• Specifications and Bidding
JTL will prepare technical specifications and a bid request package to accompany the
construction plans. The construction cost is estimated to be more than $150,000, so the public
bidding process will be required. JTL will assist the Owner with solicitation of bids, answering
Contractor's questions during bidding, bid opening and recommendation to the Owner for award.
• Utility Coordination
JTL will coordinate any utility relocations that may be required. JTL shall follow the Indiana
Administrative Code and INDOT Utility Coordination Procedures to provide initial notifications to
the utilities within the project corridor, request verification of facilities from the utilities, request a
conflict review from the utilities, and request relocation work plans from the utilities.
The following Scope of Services are Not Included in this Work Order Agreement:
• Easement Plats and Descriptions, Appraising and Buying Services
Since it is anticipated that all construction will be within existing easement, services for easement
plats, descriptions, appraising and buying are not included in this work order. Should it be
determined during design that construction will be required outside of existing easements, the
necessary services shall be added via amendment or separate agreement.
• Construction Administration/Inspection
Construction Administration and Inspection Services are not included in the scope of this
agreement and can be added, if requested, by separate contract at a later date.
P:\Projects\JTL\Archive\New Albany\87o8S-Jeffersonville General Sewers\8708S-2010\2026-5 RR Off-Site Force Main Replacement Survey and Design.doc
2
• Centerpoint Easement Encroachment Permit
At this time it is unknown whether or not gas line easements exist over existing Centerpoint
Facilities. If during the process of design it is determined that the proposed force main will
encroach upon an existing Centerpoint Gas Utility Easement, an Encroachment Permit will be
required. This will be added by separate contract at a later date, if necessary.
• Subsurface Utility Engineering
No subsurface utility engineering is included in this proposal. Identification of existing utilities
shall be per standard 811 request and requests for mapping information to be provided by the
individual utility companies.
• River Ridge Right-of-Way Permitting
River Ridge requires that right-of-way permitting for utility encroachment be submitted by the
Contractor performing the work. Therefore, these services are not included as part of this scope.
SECTION B - SCHEDULE
JTL will begin work upon receipt of signed work order agreement. Survey and design will be complete
within 120 days of the signed work order. Permit applications will be submitted within 30 days after
design completion. The project will be complete and ready for bid within 150 days of the signed work
order. If, during the design process it is determined that easement acquisition is required, this schedule
could be impacted.
SECTION C - PAYMENT TERMS
Payment to the CONSULTANT shall be on a lump sum basis for a sum of $69,500.00. A breakdown of
the tasks/fees are as follows:
• Topographic Survey - $16,000.00
• Geotechnical Investigation - $7,500.00
• Design —Construction Plans - $28,500.00
• Permitting - $2,500.00
• Specifications and Bidding - $10,000.00
• Utility Coordination - $5,000.00
Total - $69,500.00
The CONSULTANT may submit monthly invoices for payment for work completed to date.
Exceeding Estimated Fees: The estimated total fees shown herein are based on the description of work
described in this agreement. The CONSULTANT reserves the right to request an adjustment to the
estimated total fees, if necessary, as a result of scope changes or schedule adjustments that are outside
the CONSULTANT'S control.
Easement Plats and Descriptions: If during the design phase it is determined that easement plats and
descriptions will be required for construction of the force main replacement, the fee for easement exhibits
(plat and description) shall be $2,750 per parcel. This shall be in addition to the fee summarized above
and shall be added via amendment.