Loading...
HomeMy WebLinkAboutChange Order #3 for 2026-1 CCMG Paving Project City of Jeffersonville Government Contract Coversheet Please note: All information MUST be completely filled out and submitted to Clerk's Office within 48 hrs of execution. Date Submitted to Clerk: 4/22/2026 Department: Motor Vehicle (Street) Vendor Name: MAC Construction & Excavating, Inc. Sign Date: 4/22/2026 Ending Date: 8/17/2026 Amount of Original Contract: $1,162,900.00 IJ L111� QII dIIIC1IUIIICIIL VI I-1101I C UIUCI to original contract? Yes or No Amended Contract Amount: $65,000.00 Purpose: Change Order#3 for 2026-1 CCMG Paving Project. Milling/Paving/Striping Utica Pike from Kewanna Dr. to tracks at old Jeff Boat entrance (about 2200 LF). For Clerk's Office to fill out Date uploaded to Gateway: 7/9(00c: BID PROPOSAL MAC CONSTRUCTION MAC CONSTRUCTION & EXCAVATING, INC. 1908 UNRUH COURT NEW ALBANY,IN 47150 Contact: Ted Newton Phone: 239-877-8809 Email: tedn@macconstruction.com Quote To: Kevin Morlan/James Ward Job Name: CO3 -Utica Pike Street Commisioner/Superintedent Jeffersonville 2026 CCMG City of Jeffersonville/Jeff Wastewater Job#: 126033 Phone: 812-285-6455 Date: 4/17/26 Email: kmorlan@cityofjeff.com jward@cityofjeff.net ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT 3000 MOBILIZATION 1.00 LS 2,244.50 2,244.50 3100 MAINTENANCE OF TRAFFIC 1.00 LS 4,775.00 4,775.00 3200 ASPHALT MILLING 6,500.00 SYS 2.00 13,000.00 3300 HMA SURFACE,TYPE B(ASSUME 165 LB/SY)( 550.00 TON 70.00 38,500.00 3400 THERMO PAINTED LINES 4,350.00 LF 1.03 4,480.50 3500 BIKE SYMBOLS THERMO 4.00 EA 500.00 2,000.00 GRAND TOTAL $65,000.00 NOTES: Scope of work includes 1.5"mill and repaving full road width of Utica Pike from Kewanna Dr.to tracks at old Jeff Boat enterance(about 2200 LF). All striping in the work zone will be striped back using thermoplastic. Miscellaneous Notes -This proposal is based on MAC performing the entire scope of work as detailed in the project documents and this proposal. Items cannot be deleted the without proposal being rebalanced and resubmitted by MAC -Bid is based on normal work hours. Page 1 of 1 CHANGE ORDER- EXTRA WORK AGREEMENT NO. 3 JOB NO. 251032 Project Name Jeffersonville CCMG 2026-1 Street Paving Project Contractor MAC Construction&Excavating,Inc. You are hereby authorized to proceed with the following described change or extra work: As per attached documentation/breakdown: 1. Repaving of Utica Pike from Jeff Boat to Kewanna Drive = $ 65,000.00 TOTAL = $ 65,000.00 The method of payment for this change or extra work shall be: An additional amount of Sixty five thousand dollars and no cents= $65,000.00 Consulting Engineer: Prime AE Group, Inc. � — 4-21-2026 ./ Engineer's Signature Date Owner's Approval: Jefferson 71 B d of,Pufilic Works and Safety N (7194\— Signature of Owners) Date Contractor's Approval: MAC Construction&Excavating, Inc. Project Manager 4/20/2026 Authorized Representative Title Date P:\Projects\2025\251032-000R Jeffersonville CCMG FY2026 Street Paving Project\Documents\2026-I\251032-Change Order 3-Utica Pike from Jeff Boat to Kewanna