Loading...
HomeMy WebLinkAboutChange Order #2 for 2026-1 CCMG Paving Project City of Jeffersonville Government Contract Coversheet Please note: All information MUST be completely filled out and submitted to Clerk's Office within 48 hrs of execution. Date Submitted to Clerk: 4/22/2026 Department: Motor Vehicle (Street) Vendor Name: MAC Construction & Excavating, Inc. Sign Date: 4/22/2026 Ending Date: 8/17/2026 Amount of Original Contract: $1,162,900.00 IJ ll III qll gI11Cl IUIIICI Il. UI LI IQI ISC UI UCI to original contract? es or No Amended Contract Amount: $47,650.00 Purpose: Change Order#2 for 2026-1 CCMG Paving Project. Eastbrook Boulevard sidewalk addition. I For Clerk's Office to fill out ��}} Date uploaded to Gateway: 1 0� dam, BID PROPOSAL =MAC CONSTRUCTION MAC CONSTRUCTION & EXCAVATING, INC. 1908 UNRUH COURT NEW ALBANY,IN 47150 Contact: Ted Newton Phone: 239-877-8809 Email: tedn@macconstruction.com Quote To: Kevin Morlan Job Name: CO2-Eastbrook Blvd Sidewallk Additio► Street Commisioner Jeffersonville 2026 CCMG City of Jeffersonville Job#: 126033 Phone: 812-285-6455 Date: 4/2/25 Email: kmorlan@cityofjeff.com ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT 4000 MOBILIZATION 1.00 LS 500.00 500.00 4100 CONSTRUCTION ENGINEERING 1.00 LS 2,500.00 2,500.00 4200 EROSION CONTROL 1.00 LS 1,000.00 1,000.00 4300 COMMON EXCAVATION 100.00 CYS 85.00 8,500.00 4400 NEW SIDEWALK-5' 330.00 SYS 80.00 26,400.00 4450 CURB RAMPS 2.00 EA 3,000.00 6,000.00 4500 RESTORATION 1.00 LS 2,750.00 2,750.00 GRAND TOTAL $47,650.00 NOTES: Scope of work includes all materials,labor and equipment needed to install approximately 600 LF of new 5'sidewalk on the E side of Eastbrook Blvd. Includes curb ramps and ADAs at Castleton Apartments. As site conditions allow, layout will include 5'grass stripe between back of curb and sidewalk. All restoration will be seed/straw. Confirmation of ROW limits by others. Miscellaneous Notes -This proposal is based on MAC performing the entire scope of work as detailed in the project documents and this proposal. Items cannot be deleted the without proposal being rebalanced and resubmitted by MAC -Bid is based on normal work hours. Exclusions -permits -rock excavation -handling or disposal of contaminated materials -undercut and refill. Page 1 of 1 CHANGE ORDER-EXTRA WORK AGREEMENT NO. 2 JOB NO. 251032 Project Name Jeffersonville CCMG 2026-1 Street Paving Project Contractor MAC Construction&Excavating,Inc. You are hereby authorized to proceed with the following described change or extra work: As per attached documentation/breakdown: 1. Eastbrook Sidewalk Extension = $ 47,650.00 TOTAL = $ 47,650.00 The method of payment for this change or extra work shall be: An additional amount of Forty seven thousand six hundred fifty dollars and no cents= $47,650.00 Consulting Engineer: Prime AE Group, Inc. �� / 4-15-2026 / Engineer's SIgna e Date Owner's Approval: Jeff s Bo d fPublic Works and Safety Signature of Owner(s) Date Contractor's Approval: MAC Construction &Excavating, Inc. /'j , -, Project Manager 4/15/26 Authorized Representative 'Title Date P:\Projects\2025\251032-000R Jeffersonville CCMG FY2026 Street Paving Project\Documents\2026-1\251032-Change Order 2-Eastbrook Sidewalk Extension