Loading...
HomeMy WebLinkAboutSLB Pipe Solutions (Youngstown Sewer Replacement) City of Jeffersonville Government Contract Coversheet Please note: All information MUST be completely filled out and submitted to Clerk's Office within 48 hrs of execution. 2/19/2026 Date Submitted to Clerk: Wastewater Department: SLB Pipe Solutions Vendor Name: 2/19/2026 Sign Date: Ending Date: 7/31/2026 $314,890 Amount of Original Contract: Is this an amendment or change order to original contract? Amended Contract Amount: Purpose: Youngstown Sewer Replacement. For Clerk's Office to fill out Date uploaded to Gateway: `P6 "1(°' Jeffersonville Sewer Board Youngstown Sewer Replacement DIVISION 00—PROCUREMENT & CONTRACTING Section 00 52 00 Agreement AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT THIS AGREEMENT is by and between Jeffersonville Sewer Board ("Owner") and SLB Pipe Solutions LLC ("Contractor"). Terms used in this Agreement have the meanings stated in the General Conditions and the Supplementary Conditions. Owner and Contractor hereby agree as follows: ARTICLE 1 —WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: The construction of approximately 850 LF of 8" PVC gravity sewer, 5 new sanitary sewer manhole structures, extension and connection of approximately 1,500 LF of 6" PVC sanitary sewer property service connections, lining of approximately 136 LF of existing 8" VCP sanitary sewer with reinstatement of 4 property service connections, safeloading and abandonment of approximately 800 LF of existing 8" VCP sanitary sewer and manholes, in addition to all equipment and services required to complete this work,and all other items shown in the plans and mentioned in these specifications for a complete project. ARTICLE 2—THE PROJECT 2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Youngstown Sewer Replacement ARTICLE 3 —ENGINEER 3.01 The Owner has retained Jacobi, Toombs, and Lanz LLC ("Engineer") to act as Owner's representative, assume all duties and responsibilities of Engineer, and have the rights and authority assigned to Engineer in the Contract. 3.02 The part of the Project that pertains to the Work has been designed by the Engineer. ARTICLE 4 —CONTRACT TIMES 4.01 Time is of the Essence 00 52 00-1 Jeffersonville Sewer Board Youngstown Sewer Replacement DIVISION 00—PROCUREMENT & CONTRACTING Section 00 52 00 Agreement A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 4.02 Contract Times: Days A. The Work will be substantially complete within 90 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 120 days after the date when the Contract Times commence to run. 4.03 Liquidated Damages A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within the Contract Times, as duly modified. The parties also recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty): 1. Substantial Completion: Contractor shall pay Owner $1,000 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion, until the Work is substantially complete. 2. Completion of Remaining Work: After Substantial Completion,if Contractor shall neglect,refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner$1,000 for each day that expires after such time until the Work is completed and ready for final payment. 3. Liquidated damages for failing to timely attain Milestones, Substantial Completion, and final completion are not additive, and will not be imposed concurrently. B. If Owner recovers liquidated damages for a delay in completion by Contractor, then such liquidated damages are Owner's sole and exclusive remedy for such delay, and Owner is precluded from recovering any other damages,whether actual,direct,excess, or consequential, for such delay, except for special damages (if any) specified in this Agreement. 4.04 Special Damages 00 52 00-2 0 Jeffersonville Sewer Board Youngstown Sewer Replacement DIVISION 00—PROCUREMENT & CONTRACTING Section 00 52 00 Agreement A. Contractor shall reimburse Owner(1) for any fines or penalties imposed on Owner as a direct result of the Contractor's failure to attain Substantial Completion according to the Contract Times, and (2) for the actual costs reasonably incurred by Owner for engineering, construction observation, inspection, and administrative services needed after the time specified in Paragraph 4.02 for Substantial Completion(as duly adjusted pursuant to the Contract), until the Work is substantially complete. B. After Contractor achieves Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times, Contractor shall reimburse Owner for the actual costs reasonably incurred by Owner for engineering, construction observation, inspection, and administrative services needed after the time specified in Paragraph 4.02 for Work to be completed and ready for final payment(as duly adjusted pursuant to the Contract),until the Work is completed and ready for final payment. C. The special damages imposed in this paragraph are supplemental to any liquidated damages for delayed completion established in this Agreement. ARTICLE 5—CONTRACT PRICE 5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents, the amounts that follow, subject to adjustment under the Contract: A. For all Work other than Unit Price Work, a lump sum of$66,000.00. Item Description Unit Estimated Bid Unit Price Bid Amount No. Quantity Mobilization and 1 LS 1 $15,000.00 $15,000.00 Demobilization 2 Erosion Control LS l $1,500.00 $1,500.00 3 Dewatering(If Necessary) LS 1 $2,500.00 $2,500.00 4 Contractor's Construction LS 1 $6,500.00 $6,500.00 Engineering& Stakeout 5 Maintenance of Traffic LS 1 $2,500.00 $2,500.00 6 Yard/Grass Restoration LS 1 $5,500.00 $5,500.00 7 Pavement Restoration LS 1 $32,500.00 $32,500.00 Total of All Lump Sum Price Bid Items $66,000.00 All specific cash allowances are included in the above price in accordance with Paragraph 13.02 of the General Conditions. B. For all Unit Price Work,an amount equal to the sum of the extended prices(established for each separately identified item of Unit Price Work by multiplying the unit price times the actual quantity of that item). 00 52 00-3 Jeffersonville Sewer Board Youngstown Sewer Replacement DIVISION 00—PROCUREMENT & CONTRACTING Section 00 52 00 Agreement Item Estimated No. Description Unit Quantity Bid Unit Price Bid Amount 8 8" PVC Sanitary Sewer LFT 930 $85.00 $79,050.00 9 Sanitary Sewer Manhole EA 5 $8,500.00 $42,500.00 10 6"PVC Property Service LFT 1,270 $60.00 $76,200.00 Connection 11 Line Ex. 8"VCP Sanitary LFT 136 $115.00 $15,640.00 Sewer 12 Safeload Existing 8"VCP LFT 775 $20.00 $15,500.00 Sanitary Sewer 13 Unidentified Conflict EA 1 $ 20,000 $ 20,000 Contingency Total of All Unit Price Bid Items $248,890.00 1. The extended prices for Unit Price Work set forth as of the Effective Date of the Contract are based on estimated quantities. As provided in Paragraph 13.03 of the General Conditions, estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by Engineer. C. Total of Lump Sum Amount and Unit Price Work (subject to final Unit Price adjustment) $314,890.00. ARTICLE 6—PAYMENT PROCEDURES 6.01 Submittal and Processing of Payments A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions. 6.02 Progress Payments; Retainage A. Owner shall make progress payments on the basis of Contractor's Applications for Payment on or about the third Thursday of each month during performance of the Work as provided in Paragraph 6.02.A.1 below, provided that such Applications for Payment have been submitted in a timely manner and otherwise meet the requirements of the Contract. All such payments will be measured by the Schedule of Values established as provided in the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no Schedule of Values, as provided elsewhere in the Contract. 1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Owner may withhold, including but not limited to liquidated damages, in accordance with the Contract. 00 52 00-4 Jeffersonville Sewer Board Youngstown Sewer Replacement DIVISION 00 — PROCUREMENT & CONTRACTING Section 00 52 00 Agreement a. 90%of the value of the Work completed(with the balance being retainage). 1) If 50 percent or more of the Work has been completed, as determined by Engineer, and if the character and progress of the Work have been satisfactory to Owner and Engineer, then as long as the character and progress of the Work remain satisfactory to Owner and Engineer, there will be no additional retainage; and b. 90%of cost of materials and equipment not incorporated in the Work (with the balance being retainage). B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 90% of the Work completed, less such amounts set off by Owner to the General Conditions. 6.03 Final Payment A. Upon final completion and acceptance of the Work, Owner shall pay the remainder of the Contract Price in accordance with the General Conditions. 6.04 Consent of Surety A. Owner will not make final payment, or return or release retainage at Substantial Completion or any other time, unless Contractor submits written consent of the surety to such payment, return, or release. ARTICLE 7—CONTRACT DOCUMENTS 7.01 Contents A. The Contract Documents consist of all of the following: 1. This Agreement(pages 00 52 00-1 to 00 52 00-8, inclusive). 2. Performance bond (pages 00 61 13-1 to 00 61 13-4, inclusive). 3. Payment bond (pages 00 61 14-1 to 00 61 14-4, inclusive). 4. General Conditions (pages 00 72 00-1 to 00 72 00-83, inclusive). 5. Supplementary Conditions (pages 00 73 00-1 to 00 73 00-24, inclusive). 6. Specifications as listed in the table of contents of the Project Manual. 7. Drawings consisting of 6 sheets with each sheet bearing the following general title "Youngstown Sewer Replacement." 8. Addenda (numbers 1 to 2, inclusive). 9. Exhibits to this Agreement(enumerated as follows): a. Contractor's Bid (pages 004113-1 to 004113-6, inclusive). 00 52 00-5 Jeffersonville Sewer Board Youngstown Sewer Replacement DIVISION 00—PROCUREMENT & CONTRACTING Section 00 52 00 Agreement 10. The following which may be delivered or issued on or after the Effective Date of the Contract and are not attached hereto: a. Notice to Proceed. b. Work Change Directives. c. Change Orders. d. Field Orders. e. Warranty Bond, if any. B. The Contract Documents listed in Paragraph 7.01.A are attached to this Agreement (except as expressly noted otherwise above). C. There are no Contract Documents other than those listed above in this Article 7. D. The Contract Documents may only be amended, modified, or supplemented as provided in the Contract. ARTICLE 8—REPRESENTATIONS,CERTIFICATIONS,AND STIPULATIONS 8.01 Contractor's Representations A. In order to induce Owner to enter into this Contract, Contractor makes the following representations: 1. Contractor has examined and carefully studied the Contract Documents,including Addenda. 2. Contractor has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost,progress, and performance of the Work. 3. Contractor is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work. 4. Contractor has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings. 49V 00 52 00-6 Jeffersonville Sewer Board Youngstown Sewer Replacement DIVISION 00—PROCUREMENT & CONTRACTING Section 00 52 00 Agreement 5. Contractor has considered the information known to Contractor itself;information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Contract Documents; and the Technical Data identified in the Supplementary Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a)the cost, progress, and performance of the Work; (b)the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor; and(c) Contractor's safety precautions and programs. 6. Based on the information and observations referred to in the preceding paragraph, Contractor agrees that no further examinations,investigations,explorations,tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract. 7. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. 8. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor. 9. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 10. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. 8.02 Contractor's Certifications A. Contractor certifies that it has not engaged in corrupt,fraudulent,collusive,or coercive practices in competing for or in executing the Contract. For the purposes of this Paragraph 8.02: 1. "corrupt practice"means the offering, giving,receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process or in the Contract execution; 2. "fraudulent practice"means an intentional misrepresentation of facts made (a)to influence the bidding process or the execution of the Contract to the detriment of Owner, (b)to establish Bid or Contract prices at artificial non-competitive levels, or(c)to deprive Owner of the benefits of free and open competition; 3. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-competitive levels; and 00 52 00-7 4, V Jeffersonville Sewer Board Youngstown Sewer Replacement DIVISION 00—PROCUREMENT & CONTRACTING Section 00 52 00 Agreement 4. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 8.03 Standard General Conditions A. Owner stipulates that if the General Conditions that are made a part of this Contract are EJCDC® C-700, Standard General Conditions for the Construction Contract (2018), published by the Engineers Joint Contract Documents Committee, and if Owner is the party that has furnished said General Conditions,then Owner has plainly shown all modifications to the standard wording of such published document to the Contractor, through a process such as highlighting or "track changes" (redline/strikeout), or in the Supplementary Conditions. 00 52 00-8 Jeffersonville Sewer Board Youngstown Sewer Replacement DIVISION 00 —PROCUREMENT & CONTRACTING Section 00 52 00 Agreement IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement. This Agreement will be effective on Fcbry a. )q a,0a u (which is the Effective Date of the Contract). Owner: Contractor: 1e.Ti/sonv:l it rci SLB Pipe Solutions LLC (typed or pri e na of or n i ition) (typed or inted name_a f�rganization) _ By: (inc.,ividual's signature) (individual's signature) Date: /19/a062te Date: 2/11/26 (date signed) (date signed) Name: Name: Eric E Spreen (typed or printed) (typed or printed) Title: Title: President (typed or printed) (typed or printed) (If contractor is a corporation,a partnership,or a joint venture, attach evidence of authority to sign.) Attest: Attest: V. f'1t0 ! (individual's signature) (individual's signaturj) Title: Title: Office Manager (typed or printed) (typed or printed) Address for giving notices: Address for giving notices: Soo Gtvor+v-mo-4c Coy,* 2900 Mitchell Road $cfetso,,,,,!k . ,7N y7/3o PO BOX 1021 Bedford, IN 47421 Designated Representative: Designated Representative: Name: Len Asha.,..k. Name: Eric Spreen (typed or printed) (typed or printed) Title: Djn.c.i-ems (A.A.S.ku,,+a"-- Title: President (typed or printed) (typed or printed) Address: Address: WS Lcwmw, ?Ja.y 2900 Mitchell Road lif ,4v:ilt i r,�, g7/30 PO BOX 1021 Bedford, IN 47421 Phone: 611d)a285—t4S I Phone: 812-583-3566 Email: /ashes e c:41 nF\-1-crr.ne-f- Email: eric@slbpipesolutions.com (where applicable) State: Indiana 00 52 00-9