Loading...
HomeMy WebLinkAboutJTL (Design Sewer Replacement on Park Place) City of Jeffersonville Government Contract Coversheet Please note: All information MUST be completely filled out and submitted to Clerk's Office within 48 hrs of execution. 6/9/2025 Date Submitted to Clerk: Wastewater Department: JTL / Prime Vendor Name: 6/5/2025 Sign Date: Ending Date: 8/31/2025 $47,500 Amount of Original Contract: Is this an amendment or change order to original contract? Amended Contract Amount: Purpose: Design Sewer Replacement on Park Place from Division Street to Graham St. I For Clerk's Office to fill out Date uploaded to Gateway: ill 4 0 ATTACHMENT B: WORK ORDER FORM f WORK ORDER NO. 2025-4 PARK PLACE SEWER REPLACEMENT SURVEYING, DESIGN, AND BIDDING y Date: D In accordance with the General Services Agreement between the City of Jeffersonville, Indiana, acting o thru its duly appointed Sewer Board (OWNER), and Jacobi, Toombs and Lanz, LLC (CONSULTANT), dated 04/01/2010, this WORK ORDER is the written authorization to the CONSULTANT to provide the work described herein, in accordance with the attached schedule, and fees Work: The Work shall be as described in Section A of this Work Order. CONSULTANT shall furnish all labor, materials, supplies, equipment, supervision and services necessary for and incident to the performance of the Work. CONSULTANT represents that it has thoroughly reviewed the Work and the General Services Agreement and that it accepts the Work and the conditions under which the Work is to be performed. Schedule: The Schedule shall be set forth in Section B of this Work Order. CONSULTANT represents that the Schedule is reasonable and achievable. Payment Terms: Payments to the CONSULTANT shall be as described in Section C of this Work Order. + Terms and Conditions. The terms and conditions of the General Services Agreement referenced above CI shall apply to this Work Order. This Work Order also incorporates, in Section D, all the terms and conditions required to be included in it by the General Services Agreement. OWNER: CONSULTANT: r. Jeffersonville Sewer Board Jacobi,Toombs, and Lanz, LLC J Jeffersonville, Indian 1829 E. Spring Street ii 500 Quartermast C urt New Albany, IN 47150 Jeffersonville, In n 47 30 (812) 945-9585 (812) 285-6400 ByBy Iirharl Num(1,9y 797,75 le♦i(Or Mayor Mike oore, President Michael C. Harris, P.E., President .1�D�6� a By _ _ Witness,,.he.,,.,,..;.: ale L. Orem, Member Josh Darby, P.E., Director - Construction Services 4 By I ,o1/4.'+7L -"ew ✓� r 4 William A. Saegesser ., P.L.S., Member Or By Printed Name .: Authorized Representative P:\Projects\JTL\Archive\New Albany\87o8S-Jeffersonville General Sewers\87o8S-solo\202$-4 Park Place Sewer Replacement Survey-Design-Bidding.doc y 4 WORK ORDER NO. 2025-4 SECTION A - DESCRIPTION OF THE WORK ro Jacobi, Toombs and Lanz, LLC (JTL) shall provide Professional Engineering services for the project e described as follows: y ry • Topographic Survey JTL will perform topographic surveying within the project corridor, described as follows, to identify existing terrain and utilities as marked in the field. JTL will also research and resolve existing right-of-way lines. The deliverable will be in AutoCAD format to be used for Engineering Design. The project corridor is along Park Place from the west side of the intersection with Graham Street to a point approximately 50' east of the east side of the intersection with Division Street. The total project corridor is estimated to be approximately 550' in length and 60' in width. • Design —Construction Plans JTL will design and provide construction plans for the replacement of the 36" diameter sewer line along Park Place as described in the project corridor description above, meeting City and Wastewater Construction Standards. Per information provided, a 535' length of 36" VCP and RCP sewer will be replaced along Park Place from Graham Street to Division Street. This pipe is approximately 16' deep. The pipe will be replaced in the same trench and at the same size. • Geotechnical Investigation JTL will retain the services of a Licensed Professional Geotechnical Engineer to investigate and provide a report on the findings of their subsurface investigation. Three (3) borings will be provided at depths of twenty (20)feet. • Specifications and Bidding JTL will prepare technical specifications and a bid request package to accompany the construction plans. The construction cost is estimated to be more than $150,000, so the public bidding process will be required. JTL will assist the Owner with solicitation of bids, answering Contractor's questions during bidding, bid opening and recommendation to the Owner for award. The following Scope of Services are Not Included in this Work Order Agreement: • Appraising and Buying Services All work is expected to be conducted within existing City right-of-way, therefore no appraising or buying services are included. • Easement Plats and Descriptions All work is expected to be conducted within existing City right-of-way, therefore preparation of easement plats and descriptions is not expected to be required and is not included. • Permitting Since the sewers are being proposed to be replaced in kind in the same trench, a Sewer Construction permit is not required. • Construction Administration/Inspection Construction Administration and Inspection Services are not included in the scope of this agreement and can be added, if requested, by separate contract at a later date. I P:\Projects\JTL\Archive\New Albany\87o8S-Jeffersonville General Sewers\8708S-201o\2025-4 Park Place Sewer Replacement Survey-Design-Ridding.doc 2 iii 4 SECTION B- SCHEDULE JTL will begin work upon receipt of signed work order agreement. The project will be complete and ready for bid within 90 days of the signed work order. a SECTION C — PAYMENT TERMS Payment to the CONSULTANT shall be on a lump sum basis for a sum of$47,500. A breakdown of the tasks/fees are as follows: • Topographic Survey - $12,500 • Design—Construction Plans - $18,500 • Geotechnical Investigation - $10,500 • Specifications and Bidding - $6,000 Total - $47,500 The CONSULTANT may submit monthly invoices for payment for work completed to date. Exceeding Estimated Fees: The estimated total fees shown herein are based on the description of work described in this agreement. The CONSULTANT reserves the right to request an adjustment to the estimated total fees, if necessary, as a result of scope changes or schedule adjustments that are outside the CONSULTANT'S control. Q m 4 P:\Projects\JTL\Archive\New Albany\87o8S-Jeffersonville General Sewers\87o8S-2mo\2025-4 Park Place Sewer Replacement Survey-Design-B idding.doc 3 1