Loading...
HomeMy WebLinkAboutRehab 6 Clarifiers and 2 Thickeners at Downtown Plant City of Jeffersonville Government Contract Coversheet Please note: All information MUST be completely filled out and submitted to Clerk's Office within 48 hrs of execution. Date Submitted to Clerk: March 10,2025 Department: Wastewater Vendor Name:, MAC Construction& Excavating Sign Date: 3/6/2025 Ending Date: 9/30/2026 Amount of Original Contract: $7,424,000 Is this an amendment or change order to original contract? Amended Contract Amount: Purpose: Rehabilitate 6 secondary clarifers and 2 gravity thickeners at the Jeffersonville Downtown Wastewater Treatment Plant For Clerk's Office to fill out Date uploaded to Gateway: 3/v/aS� AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (STIPULATED PRICE) MAC Construction& This Agreement is by and between City of Jeffersonville("Owner")and Excavating, Inc. ("Contractor"). Terms used in this Agreement have the meanings stated in the General Conditions and the Supplementary Conditions. Owner and Contractor hereby agree as follows: ARTICLE 1—WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents.The Work is generally described as follows: The project rehabilitates Clarifiers#1 through#6 and Thickeners #1 and #2 at the Jeffersonville Downtown WWTP. The scope includes the replacement of all internal steel mechanisms in Clarifiers #1 through #4 with Stainless Steel 316 components, retaining existing walkways, clarifier drives, and fiberglass-reinforced plastic components. Clarifiers #5 and #6 will undergo sandblasting and repainting of all internal steel mechanisms. Sludge Thickeners#1 and#2 will have all internal mechanisms replaced with SS 316,along with the replacement of walkways and thickener drives. Additional work includes replacing wall and floor pressure relief valves,concrete crack filling,sacrificial grout replacement,installing electric actuators for the weir gates,and associated site work,site piping,electrical,and instrumentation. ARTICLE 2—THE PROJECT 2.01 The Project,of which the Work under the Contract Documents is a part,is generally described as follows: Downtown WWTP Clarifiers and Thickeners Rehabilitation Project ARTICLE 3—ENGINEER 3.01 The Owner has retained Lochmueller Group, Inc. ("Engineer")to act as Owner's representative, assume all duties and responsibilities of Engineer, and have the rights and authority assigned to Engineer in the Contract. 3.02 The part of the Project that pertains to the Work has been designed by Engineer. ARTICLE 4—CONTRACT TIMES 4.01 Time is of the Essence A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 4.02 Contract Times:Days A. The Work will be substantially complete within Mg days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 540 days after the date when the Contract Times commence to run. 4.05 Liquidated Damages A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and EJCDC®C-520,Agreement between Owner and Contractor for Construction Contract(Stipulated Price). Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies, and American Society of Civil Engineers.All tights reserved. Page 1 of 6 Milestones not achieved within the Contract Times, as duly modified. The parties also recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay(but not as a penalty): 1. Substantial Completion:Contractor shall pay Owner$1,000 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion,until the Work is substantially complete. 2. Completion of Remaining Work:After Substantial Completion,if Contractor shall neglect, refuse,or fail to complete the remaining Work within the Contract Times(as duly adjusted pursuant to the Contract)for completion and readiness for final payment,Contractor shall pay Owner Q for each day that expires after such time until the Work is completed and ready for final payment. 3. Liquidated damages for failing to timely attain Milestones, Substantial Completion, and final completion are not additive,and will not be imposed concurrently. B. If Owner recovers liquidated damages for a delay in completion by Contractor, then such liquidated damages arc Owner's sole and exclusive remedy for such delay, and Owner is precluded from recovering any other damages,whether actual,direct,excess,or consequential, for such delay,except for special damages(if any)specified in this Agreement. ARTICLE 5—CONTRACT PRICE 5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents,the amounts that follow,subject to adjustment under the Contract: A. For all Work,at the prices stated in Contractor's Bid,attached hereto as an exhibit. ARTICLE 6—PAYMENT PROCEDURES 6.01 Submittal and Processing of Payments A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions.Applications for Payment will be processed by Engineer as provided in the General Conditions. 6.02 Progress Payments;Retainage A. Owner shall make progress payments on the basis of Contractor's Applications for Payment on or about the day of each month during performance of the Work as provided in Paragraph 6.02.A.1 below, provided that such Applications for Payment have been submitted in a timely manner and otherwise meet the requirements of the Contract.All such payments will be measured by the Schedule of Values established as provided in the General Conditions(and in the case of Unit Price Work based on the number of units completed)or,in the event there is no Schedule of Values,as provided elsewhere in the Contract. 1. Prior to Substantial Completion,progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Owner may withhold,including but not limited to liquidated damages,in accordance with the Contract. a. 95 percent of the value of the Work completed(with the balance being retainage). EJCDC®C-520,Agreement between Owner and Contractor for Construction Contract(Stipulated Price). Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies, and American Society of Civil Engineers.All rights reserved. Page 2 of 6 B. Upon Substantial Completion,Owner shall pay an amount sufficient to increase total payments to Contractor to 100 percent of the Work completed, less such amounts set off by Owner pursuant to Paragraph 15.01.E of the General Conditions,and less 200percent of Engineer's estimate of the value of Work to be completed or corrected as shown on the punch list of items to be completed or corrected prior to final payment. 6.03 Final Payment A. Upon final completion and acceptance of the Work, Owner shall pay the remainder of the Contract Price in accordance with Paragraph 15.06 of the General Conditions. 6.04 Consent of Surety A. Owner will not make final payment,or return or release retainage at Substantial Completion or any other time,unless Contractor submits written consent of the surety to such payment,return, or release. 6.05 Interest A. All amounts not paid when due will bear interest at the rate of 0 percent per annum. ARTICLE 7—CONTRACT DOCUMENTS 7.01 Contents A. The Contract Documents consist of all of the following: 1. This Agreement. 2. Bonds: a. Performance bond(together with power of attorney). b. Payment bond(together with power of attorney). 3. General Conditions. 4. Supplementary Conditions. 5. Specifications as listed in the table of contents of the project manual(copy of list attached). 7. Drawings. 8. Addenda. 9. The following which may be delivered or issued on or after the Effective Date of the Contract and are not attached hereto: a. Notice to Proceed. b. Work Change Directives. c. Change Orders. d. Field Orders. e. Warranty Bond,if any. B. The Contract Documents listed in Paragraph 7.01.A are attached to this Agreement(except as expressly noted otherwise above). C. There are no Contract Documents other than those listed above in this Article 7. EJCDC®C-520,Agreement between Owner and Contractor for Construction Contract(Stipulated Price). Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies. and American Society of Civil Engineers.All rights reserved. Page 3 of 6 D. The Contract Documents may only be amended,modified,or supplemented as provided in the Contract. ARTICLE 8—REPRESENTATIONS,CERTIFICATIONS,AND STIPULATIONS 8.01 Contractor's Representations A. In order to induce Owner to enter into this Contract, Contractor makes the following representations: 1. Contractor has examined and carefully studied the Contract Documents, including Addenda. 2. Contractor has visited the Site, conducted a thorough visual examination of the Site and adjacent areas,and become familiar with the general, local, and Site conditions that may affect cost,progress,and performance of the Work. 3. Contractor is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work. 4. Contractor has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings. 5. Contractor has carefully studied the reports and drawings relating to Hazardous Environmental Conditions,if any,at or adjacent to the Site that have been identified in the Supplementary Conditions,with respect to Technical Data in such reports and drawings. 6. Contractor has considered the information known to Contractor itself; information commonly known to contractors doing business in the locality of the Site;information and observations obtained from visits to the Site;the Contract Documents;and the Technical Data identified in the Supplementary Conditions or by definition,with respect to the effect of such information, observations, and Technical Data on (a)the cost, progress, and performance of the Work;(b)the means,methods,techniques,sequences,and procedures of construction to be employed by Contractor;and(c)Contractor's safety precautions and programs. 7. Based on the information and observations referred to in the preceding paragraph, Contractor agrees that no further examinations,investigations,explorations,tests,studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times,and in accordance with the other terms and conditions of the Contract. 8. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. 9. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor. 10. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. EJCDC®C-520,Agreement between Owner and Contractor for Construction Contract(Stipulated Price). Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies, and American Society of Civil Engineers.All rights reserved. l'age 4 of 6 11. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. 8.02 Contractor's Certifications A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract.For the purposes of this Paragraph 8.02: 1. "corrupt practice"means the offering,giving,receiving,or soliciting of anything of value likely to influence the action of a public official in the bidding process or in the Contract execution; 2. "fraudulent practice"means an intentional misrepresentation of facts made(a)to influence the bidding process or the execution of the Contract to the detriment of Owner, (b) to establish Bid or Contract prices at artificial non-competitive levels,or(c)to deprive Owner of the benefits of free and open competition; 3. "collusive practice"means a scheme or arrangement between two or more Bidders,with or without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial,non-competitive levels;and 4. "coercive practice"means harming or threatening to harm, directly or indirectly,persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 8.03 Standard General Conditions A. Owner stipulates that if the General Conditions that are made a part of this Contract are EJCDC®C-700,Standard General Conditions for the Construction Contract(2018),published by the Engineers Joint Contract Documents Committee, and if Owner is the party that has furnished said General Conditions, then Owner has plainly shown all modifications to the standard wording of such published document to the Contractor, through a process such as highlighting or"track changes"(redline/strikeout),or in the Supplementary Conditions. EJCDC®C-520,Agreement between Owner and Contractor for Construction Contract(Stipulated Price). Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies, and American Society of Civil Engineers.All rights reserved. Page 5 of 6 IN WITNESS WHEREOF,Owner and Contractor have signed this Agreement. This Agreement will be effective on etc Or, LQ , (which is the Effective Date of the Contract). Owner: II Contractot: ta.:.._ Sa MAC Constructio & Excavating, 0oailllj�ii��i, ( ed or. inter. Fforganizatio (typed r m f org 'atiore By: .) sy: .• (i idual's signature) (individual's sig ; ORt�� Date: 3 —lQ— Date: March 4, 2025 's�: SEAL h_ (date signed) (date signed) . ..�. . • Name: ` V(typA. orpri. 0 b CL. Name: Travis O. Unruh ruhrprintet� �i��t J!�NA\�����`��``` Title: KNA.G. c- Title: President (typed or inted) (typed or printed) (If/Type of Entity)is a corporation,a partnership,or a joint ntur,st ach evidence o hority to sign.) Attest: Attest: (individual's signatu (individual's signature) Title: r CA 0 Title: Darlene S. Cochran -C.O.O. (typed or printed) (typed or printed) Address for giving notices: Address for giving notices: 1908 Unruh Court New Albany. IN 47150 Designated Representative: Designated Representative: Name: Name: Sam Kaluzny (typed or printed) (typed or printed) Title: Title: Sr. Project Manager (typed or printed) (typed or printed) Address: Address: 1908 Unruh Court New Albany. IN 47150 Phone: Phone: 812-941-7895 Email: Email: samk@macconstruction.com (If!Type of Entity)is a corporation,attach evidence of authority to sign.If[Type of Entity)is a public body, License No.: N/A attach evidence of authority to sign and resolution or (where applicable) other documents authorizing execution of this Agreement.) State: EJCDC®C-520,Agreement between Owner and Contractor for Construction Contract(Stipulated Price). Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies, and American Society of Civil Engineers.All rights reserved. Page 6 of 6 Addendum#3 BID FORM The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions,and the Supplementary Conditions. ARTICLE 1—OWNER AND BIDDER 1.01 This Bid is submitted to:Jeffersonville Sewer Board of the City of Jeffersonville-Jeffersonville City Hall,500 Quartermaster Court,Jeffersonville,Indiana,47130 1.02 The undersigned Bidder proposes and agrees,if this Bid is accepted,to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents. ARTICLE 2—ATTACHMENTS TO THIS BID 2.01 The following documents are submitted with and made a condition of this Bid: A. Required Bid security; B. Evidence of authority to do business in the state of the Project;or a written covenant to obtain such authority within the time for acceptance of Bids; C. Contractor's license number as evidence of Bidder's State Contractor's License or a covenant by Bidder to obtain said license within the time for acceptance of Bids; D. Required Bidder Qualification Statement with supporting data; E. Indiana Iran Investment Certification F. E-Verify Certification G. Indiana State Form No.96; H. Non-Collusion Affidavit; I. Financial Statement for Bidders;and J. Indiana Department of Administration Contractor Pre-Qualification Certification EJCDC®C-410,Bid Form for Construction Contract. Copyright°2018 National Society of Professional Engineers,American Connell of Engineering Companies, and American Society of Civil Engineers.All rights reserved. Page 1of7 Addendum#3 ARTICLE 3—BASIS OF BID—LUMP SUM BID AND UNIT PRICES 3.01 Lump Sum Bids A. Bidder will complete the Work in accordance with the Contract Documents for the following lump sum (stipulated)price(s),together with any Unit Prices indicated in Paragraph 3.02: 1. Lump Sum Price(Single Lump Sum): A. Lump Sum Bid Price $ (Includes Scope of Work at For WesTech SS304 Clarifiers#1 Through#4; WesTech SS304 Thickeners#1 WACO SS316 Weir Gates&Rotork ��n Q 1A�� Actuators at MLSS Splitter Box#1 and MLSS Splitter Box#2);Coating Clarifiers p(, -1 #5 and#6 using Gulf Coast Material,Wall&Floor PRVs,Concrete Crack Filling, Sacrificial Grout Replacement,Installing Electric Actuators for Weir Gates,and Associated Site Work,Site Piping,Electrical&Instrumentation) B. Concrete Tank Base Repair (Undistributed,shall be utilized at the discretion of the Engineer to repair CONCRETE BASE requiring saw cutting and removal and • sit $ tP s /� replacement of the CONCRETE 5,000 per sft $ 3 000 BASE up to full depth of the CONCRETE BASE) C. Concrete Tank Surface Repairs _ Greater than 30mil Thick(Ift)shall be utilized at the discretion of the 700 lft $ C 5 _per lft $ 3 gc-. 500 Engineer to repair CONCRETE BASE requiring a caulking gun and Sikaflex Pro 3) D. Scaling Repairs(Undistributed,to include all labor,materials,and 5,000 sft $ per sft $ a���0 equipment to repair CONCRETE 0 BASE SCALING) E. Cash Allowance (System Integration and SCADA Programming by Delta Services) $288,580.00 Total LUMP SUM BID PRICE(A Plus B Plus C Plus D Plus L): ‘-7C) (X EJCfC®C-410,Bid Form for Construction Contract Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies, and American Society of Civil Engineers.All rights reserved. Page 2 of 7 Addendum#3 3.02 Mandatory Alternate#1—Clarifiers(#1 through#4)and Thickeners(#1 and#2) A. All specified"Mandatory Alternate#1"Lump Sum price items are included in the prices set forth below, and have been computed in accordance with Paragraph 13.02 of the General Conditions: Item Description Add/Deduct lA All SS316 WesTech Internal Steel Mechanism for Clarifiers(#1, $ A dd .TOo #2,#3,#4)and Thickeners(#1,#2)in lieu of WesTech SS304 f�(�O� Material t0 1B All SS304 OVIVO Internal Steel Mechanism for Clarifiers(#1,#2, $ AOLd. Too #3,#4)and Thickeners(#1,#2)in lieu of WesTech SS304 Material IC All SS316 OVIVO Internal Steel Mechanism for Clarifiers(#1,#2, $ #3,#4)and Thickeners(#1,#2) in lieu of WesTech SS304 Material LAt'bu 41+ 393,e2z- . 7 3.03 Mandatory Alternate #2 —Clarifiers (#5 and #6), Walkways and Drive Platforms (Clarifiers #1 through#6) A. All specified"Mandatory Alternate#2"Lump Sum price items are included in the prices set forth below, and have been computed in accordance with Paragraph 13.02 of the General Conditions: Item Description Add/Deduct 2A Solvent Cleaning,Sand Blast and Paint using Carboline in lieu of TT) Gulf Coast 14 60'000 3.04 TOTAL LUMP SUM BID PRICE: The Project will be awarded based on the Total Combination of A.Lump Sum Base Bid Price plus B.Lump Sum Cash Allowance.Mandatory Alternates 1 and 2 will be considered by the City after the awarding of the bid through a change order. ARTICLE 4--TIME OF COMPLETION 4.01 Bidder agrees that the Work will be substantially complete within 480 calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions,and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 540 calendar days after the date when the Contract Times commence to run. 4.02 Bidder accepts the provisions of the Agreement as to liquidated damages. EJCDC®C-410,Bid Form for Construction Contract. Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies, and American Society of Civil Engineers.All rights reserved. Page 3 of 7 Addendum#3 ARTICLE 5—BIDDER'S ACKNOWLEDGEMENTS:ACCEPTANCE PERIOD, INSTRUCTIONS,AND RECEIPT OF ADDENDA 5.01 Bid Acceptance Period A. This Bid will remain subject to acceptance for 90 days after the Bid opening,or for such longer period of time that Bidder may agree to in writing upon request of Owner. 5.02 Instructions to Bidders A. Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. 5.03 Receipt of Addenda A. Bidder hereby acknowledges receipt of the following Addenda: Addendum Number Addendum Date Addendum#1 January 7,2025 Addendum#2 January 20, 2025 Addendum#2-REVISED January 20, 2025 Addendum#2-REVISED January 24, 2025 Addendum#3 January 31, 2025 Addendum#4 February 4, 2025 Addendum#4-REVISED (Acknowledgement Page Added) February 4, 2025 ARTICLE 6—BIDDER'S REPRESENTATIONS AND CERTIFICATIONS 6.01 Bidder's Representations A. In submitting this Bid,Bidder represents the following: 1. Bidder has examined and carefully studied the Bidding Documents,including Addenda. 2. Bidder has visited the Site, conducted a thorough visual examination of the Site and adjacent areas,and become familiar with the general, local, and Site conditions that may affect cost,progress,and performance of the Work. 3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work. 4. Bidder has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions,with respect to the Technical Data in such reports and drawings. EJCDC®C-410,Bid Form for Construction Contract. Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies, and American Society of Civil Engineers.All rights reserved. Page 4 of 7 LOCHMUSELLER GROUP ADDENDUM NO. 1 January 7,2025 PROJECT: City of Jeffersonville Downtown Wastewater Treatment Plant Clarifiers&Thickeners Rehabilitation OWNER: City of Jeffersonville, INDIANA ENGINEER: Lochmueller Group Project No. 124-2010 Acknowledgement of Receipt of Addendum No. 1 Send this page immediately to: Justin Ramirez, PE (No Cover Sheet Required) Lochmueller Group Email.: Jramirez@lochgroup.com Phone No.: 502-526-6335 From: MAC Construction & Excavating, Inc. (Insert Company Name) j b t Signature January 7,2025 Date Note: You must also acknowledge receipt of all addenda on the Bid Proposal Form 331 Quartermaster Court Jeffersonville,IN 47130 PHONE;812.479.6200 LOCHMUELLER GROUP ADDENDUM NO.2 January 20,2025 PROJECT: City of Jeffersonville Downtown Wastewater Treatment Plant Clarifiers&Thickeners Rehabilitation OWNER: City of Jeffersonville,INDIANA ENGINEER: Lochmueller Group Project No. 124-2010 Acknowledgement of Receipt of Addendum No. 2 Send this page immediately to: Anuchart Sucharitakul, PE (No Cover Sheet Required) Lochmueller Group Email: Asucharitakul@lochgroup.com Phone No.: 812-759-4101 From: MAC Construction & Excavating, Inc. (Insert Company Name) Signature January 20, 2025 Date Note: You must also acknowledge receipt of all addenda on the Bid Proposal Form 331 Quartermaster Court Jeffersonville,Indiana 47130 PHONE:812.479.6200 LOC M ELLER GIROUP ADDENDUM NO.2 January 20,2025 PROJECT: City of Jeffersonville Downtown Wastewater Treatment Plant Clarifiers&Thickeners Rehabilitation OWNER: City of Jeffersonville,INDIANA ENGINEER: Lochmueller Group Project No. 124-2010 Acknowledgement of Receipt of Addendum No. 2 Send this page immediately to: Anuchart Sucharitakul, PE (No Cover Sheet Required) Lochmueller Group Email.: Asucharitakul@lochgroup.com Phone No.: 812-759-4101 From: CIcf\s f f out t- m ` 5C.WIDJ; (Insert Company Name) Signature to Note: You must also acknowledge receipt of all addenda on the Bid Proposal Form 331 Quartermaster Court Jeffersonville,Indiana 47130 PHONE:812.479.6200 ( ' UEER GROUP ADDENDUM NO. 2 January 24,2025 PROJECT: City of Jeffersonville Downtown Wastewater Treatment Plant Clarifiers&Thickeners Rehabilitation OWNER: City of Jeffersonville,INDIANA ENGINEER: Lochmueller Group Project No. 124-2010 Acknowledgement of Receipt of Addendum No. 2 Send this page immediately to: Anuchart Sucharitakul, PE (No Cover Sheet Required) Lochmueller Group Email.: Asucharitakul@lochgroup.com Phone No.: 812-759-4101 From: MIA CC-+1.4(UC.E t ,,,`1 * C,XCb.Yp�tr (Insert Company Name) J-el1tklA Signature I I ay 1 a5 [date Note: You must also acknowledge receipt of all addenda on the Bid Proposal Form 331 Quartermaster Court Jeffersonville,Indiana 47130 PHONE:812.479.6200 LOCHMUELLER GROUP ADDENDUM NO.3 January 31, 2025 PROJECT: City of Jeffersonville Downtown Wastewater Treatment Plant Clarifiers&Thickeners Rehabilitation OWNER: City of Jeffersonville,INDIANA ENGINEER: Lochmueller Group Project No. 124-2010 Acknowledgement of Receipt of Addendum No. 3 Send this page immediately to: Anuchart Sucharitakul, PE (No Cover Sheet Required) Lochmueller Group Email.: Asucharitakul@lochgroup.com Phone No.: 812-759-4101 From: H N C C r Utah + ex C G.voJ i� (Insert Company Name) Signature d,tu`a5 Date Note: You must also acknowledge receipt of all addenda on the Bid Proposal Form 331 Quartermaster Court Jeffersonville,Indiana 47130 PHONE:812.479.6200 LOCHMUELLER GROUP ADDENDUM NO. 4 February 4, 2025 PROJECT: City of Jeffersonville Downtown Wastewater Treatment Plant Clarifiers&Thickeners Rehabilitation OWNER: City of Jeffersonville,INDIANA ENGINEER: Lochmueller Group Project No. 124-2010 Acknowledgement of Receipt of Addendum No. 4 Send this page immediately to: Anuchart Sucharitakul, PE (No Cover Sheet Required) Lochmueller Group Email.: Asucharitakul@lochgroup.com Phone No.: 812-759-4101 From: ti--I c aCY- v"` -x-Ct t(•-,,Th (Insert Company Name) Signatur • e 5 to Note: You must also acknowledge receipt of all addenda on the Bid Proposal Form 331 Quartermaster Court Jeffersonville,Indiana 47130 PHONE:812479.6200 Addendum#3 5. Bidder has carefully studied the reports and drawings relating to Hazardous Environmental Conditions,if any,at or adjacent to the Site that have been identified in the Supplementary Conditions,with respect to Technical Data in such reports and drawings. 6. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Technical Data identified in the Supplementary Conditions or by definition,with respect to the effect of such information, observations, and Technical Data on (a)the cost, progress, and performance of the Work;(b)the means,methods,techniques,sequences,and procedures of construction to be employed by Bidder, if selected as Contractor; and (c) Bidder's (Contractor's)safety precautions and programs. 7. Based on the information and observations referred to in the preceding paragraph,Bidder agrees that no further examinations,investigations,explorations,tests, studies,or data are necessary for the performance of the Work at the Contract Price,within the Contract Times, and in accordance with the other terms and conditions of the Contract. 8. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents. 9. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents,and of discrepancies between Site conditions and the Contract Documents,and the written resolution thereof by Engineer is acceptable to Contractor. 10. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 11. The submission of this Bid constitutes an incontrovertible representation by Bidder that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents. 6.02 Bidder's Certifications A. The Bidder certifies the following: 1. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group,association,organization,or corporation. 2. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 3. Bidder has not solicited or induced any individual or entity to refrain from bidding. 4. Bidder has not engaged in corrupt,fraudulent,collusive,or coercive practices in competing for the Contract.For the purposes of this Paragraph 8.02.A: a. Corrupt practice means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process. b. Fraudulent practice means an intentional misrepresentation of facts made (a)to influence the bidding process to the detriment of Owner,(b)to establish bid prices at artificial non-competitive levels, or(c)to deprive Owner of the benefits of free and open competition. EJCDC®C-410,Bid Form for Construction Contract. Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies, and American Society of Civil Engineers.All rights reserved. Page 5 of 7 Addendum#3 c. Collusive practice means a scheme or arrangement between two or more Bidders,with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial,non-competitive levels. d. Coercive practice means harming or threatening to harm,directly or indirectly,persons or their property to influence their participation in the bidding process or affect the execution of the Contract. EJCDC®C-410,Bid Form for Construction Contract. Copyright*2018 National Society of Professional Engineers,American Council of Engineering Companies, and American Society of Civil Engineers.All rights reserved. Page 6of7 Addendum#3 BIDDER hereby submits this Bid as set forth above: Bidder: ` `‘0\ON t t�777�i��f MAC Construction& Excavating, Inc. 4� • �'96�fs (typed or pri me of o B (S: OFLPORgT rv' s signatu V L • Name: Travis O.Unruh V President (typed or printed) " Title: lj� 1y"",`````��Q (typed or printe Ilff((IIN1�d d Date: February 6,2025 (typed or printet0 If Bidder is' j''rat!' a pauksenehips or a jri onnpwi,attach evidence of authority to sign.-See Attachment I- Authority to Sign Attest: (individual•s signature) Name: Darlene S.Cochran (typed or printed Title: C.O.O. (typed or printed) Date: February 6,2025 (typed or printed) Address for giving notices: 1908 Unruh Court New Abany,IN 47150 Bidder's Contact: Name: James Crosier (typed or printed) Title: Estimator (typed or printed) Phone: 812-941-5339 Email: JCrosier@macconstruction.com Address: 1908 Unruh Court New Albany,IN 47150 Bidder's Contractor License No.:(if applicable) FEIN#35-1487672 EJCDC®C-410,Bid Form for Construction Contract. Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies, and American Society of Civil Engineers.All rights reserved. Page 7 of 7