HomeMy WebLinkAboutMAC Construction Change Order #2 City of Jeffersonville
Government Contract Coversheet
Please note: All information MUST be completely filled out and submitted to Clerk's Office
within 48 hrs of execution.
Date Submitted to Clerk: I 0z c
Department: - c xie ipi vn.-
Vendor Name: /\jU/ L (41Ylflt1i ! OL
Sign Date: ( 7—/ I 1 1
Ending Date:
Amount of Original Contract: 4 I , �0 O I hO-0
Is this an amendment or change order
to original contract? ,Ye or No
Amended Contract Amount: 1 1 (,Q! l—t-'V 1 1151 1
Purpose: VitAAINit(
oAte/vaexg, a t 6111 7-A-p161'
For Clerk's Office to fill out
Date uploaded to Gateway:
City of Jeffersonville Redevelopment Commission
Utica-Sellersburg Road& Charlestown-Jeffersonville Pike Reconstructions
CHANGE ORDER NO.: #002
Owner: City Of Jeffersonville Owner's Project No.: 20157 and 20158
Engineer: HWc Engineering Engineer's Project No.: 2024-060-S
Contractor:Mac Construction Contractor's Project No.: 124048
Project: Phase 1
Contract Name:Utica-Sellersburg Road and Charlestown Pike Reconstructions
Date Issued: August 22,2024 Effective Date of Change Order:
The Contract is modified as follows upon execution of this Change Order:
Description: This change order was generated as a result of water line changes that were required to install the newly
proposed watermain along Charlestown Pike,South of Utica-Sellersburg Road. Included in this change in
provisions to install pipe casing under the proposed box culverts,line stops and tapping sleeves to perform work
at 1-265,and the reduction of water main from 12"to 8",approved by Ken Alexander(Watson Water).
Attachments: 1 Pay Item Changes and Cost Breakdown
2.Change Order Explanation
3.Supporting Documentation
Change in Contract Price Change in Contract Times
Original Contract Price: Original Contract Times:
Substantial Completion: June 19,2026
$ 16,280,000.00 Ready for final payment: June 19,2026
[Increase][Decrease]from previously approved Change [Increase] [Decrease]from previously approved
Orders No. 1 to No. Change Orders No.1 to No.
$
Substantial Completion;
-19,726.79 June 19,2026
Ready for final payment: June 19,2026
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial Completion: June 19,2026
$ 16,260,273.21 Ready for final payment:
June 19.2026
[increase][Decrease]this Change Order: [Increase] [Decrease]this Change Order:
Substantial Completion: June 19.2026
$ 0.00 Ready for final payment:
June 19.2026
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial Completion: June 19.2026
$ 16,260,273.21 Ready for final payment: June 19,2026
Recommended by Engineer(if required) — Accepted by Contractor
By: ie/vz v 9ae e- 4.1
I
Title: Resident Project Representative ('/�,� ra c1[G/r
Date: 12/06/2024 12:23:58 PM /Z/9/z4 ova
Authorized by Owner Approved by Funding Agency(if applicable)
By:
Title:
Date: / VJ 01)
006363
_:-.:MAC MAC Project: Utica-Sellersburg Road and Charlestown Jeffersonville
- Pike Reconstruction Phase 1
—
: �_'-1 CONSTRUCTION
MAC Request for Change: 124048-004 Revised
MRC Description:Installation of 8"Waterline
LABOR EQUIPMENT
HOURLY RATE HOURS TOTAL DAILY + TOTAL
QTY DESCRIPTION REG O.T. REG O.T. TOTAL LABOR$ QTY TYPE RATE DAYS HOURS EQUIP
. $ $
$ $
$ - $
$ - $
Taxes&Insurance $ _
$
Total Labor 0.00 0.00 0.00 $ - Total Equipment $
SUBCONTRACTORS MATERIAL
CODE DESCRIPTION RATE QTY UNITS VENDOR TOTAL$ CODE DESCRIPTION RATE QTY UNITS Totai$
Taxes N/A - (%of total) N/A $ - Taxes 7.0% - (%of total mat'l) $ -
Total Subcontractor $ - Total Material $ .
OTHER Date: 10/31/24
CODE DESCRIPTION RATE QTY I UNITS VENDOR Total$
Bond Increase/Adder 1% $ - %of Total$$ $ -
$ -
$ - MAC Construction&Excavating,Inc.
Total Other $ _
Labor $ - Equipment $ -
NOTES: OH&P @ 15% $ - OH&P @ 15% $ -
1.The attached quotation Information forms an Integral part of MAC's pricing. MAC reserves the right to additional Total Labor $ - Total Equipment $ -
compensation and/or time should this information as included not be acceptable.
Subs $ - Material/Other $ -
OH&P @ 5% $ - OH&P @ 15% $
Total Subs $ - Total Material $ -
MRC Total$$: $ 173,798
Deduct for 12"Pipe(-7,500LF) $ (1,500,000.00)
12"Pipe to Be installed(1,50210 $ 300,400.00
8"Pipe to be Installed(5,998 If•$173.23) $ 1,039,033.54
Deduct for 12"Valves(-28EA) $ (145,600.00)
Install 12"Valves(5EA) $ 26,000.00
Adder to 8"Valves(23EA) $ 69,000.00
Deduct for Trenchless Being Removed(-76LF) $ (76,000.00)
8"x8"Tapping Sleeve(2EA) $ 22,000.00
Waterline Contingency(1L5) $ 64,074.46
8"Waterstop Overrun in CO141(1EA) $ 11,165.00
10"Waterstop Overrun in COg1(1EA) $ 16,129.00
Total $ (0.00)
Contract Time Adjustment: 0 Days
Rev 0 Page g Printed on:12/9/2024
W MAC MAC Project: Utica-Sellersbmg Road and Charlestown Jeffersonville
_I1 CONSTRUCTION Pike Reconstruction Phase 1
MAC Request for Change:124048-Casing Pipe and Spacers
MRC Description:Installation of 8"Waterline
LABOR EQUIPMENT
HOURLY RATE HOURS TOTAL DAILY + TOTAL
QTY DESCRIPTION REG O.T. REG O.T. TOTAL LABOR$ QTY TYPE RATE DAYS HOURS EQUIP$
Installation of Casino Pipe and Casino Spacers at Box Culverts(5 Ea) Installation of Casing Pipe and Casing Spacers at Box Culverts(5 Ea) $ -
1 Foreman $ 100.00 $ 131.00 75.00 75.00 $ 7,500.00 1 Cat 315 $ 745.68 75.00 $ 6,990.75
2 Operator $ 64.00 $ 84.00 i50.00 150.00 $ 9,600.00 1 Trench Box $ 179.00 75.00 $ 1,678.13
2 Pipe Layer $ 52.00 $ 68.00 150.00 150.00 $ 7,800.00 1 Hoe Ram $ 411.28 75.00 $ 3,855.75
$ - $ - 0.00 $ - 1 Skidsteer $ 357.76 75.00 $ 3,354.00
$ 5 - 0.00 $ - 1 Rock Box $ 120.00 75.00 $ 1,125.00
Taxes&Insurance $ 10,458.00 $ -
Total Labor 375.00 0.00 375.00 $ 35,358.00 Total Equipment $ 17,003.63
SUBCONTRACTORS MATERIAL
CODE ' DESCRIPTION T RATE I QTY UNITS VENDOR TOTAL$ CODE I DESCRIPTION I RATE I QTY UNITS Total$
Installation of Casino Pipe and Casing Spacers at Box Culverts(5 Ea) $ - Installation of Casing Pipe and Casing Spacers of Box Culverts(5 Ea) $ -
Weld Casing Plpe $ 130.00 3.00 HR Epic Welding $ 390.00 Casio 18 Steel)Plpe P ( " $ 65.40 40.00 FT $ 2,616.00
5 - Casing Spacers(12"Pipe) $ 62.50 5.00 EA 5 312.50
$ - End Seals(12"Pipe) $ 100.28 2.00 EA $ 200.56
$ - Casing Plpe(18"C900) $ 62.00 80.00 FT $ 4,960.00
$ - Casing Spacers(8"Pipe) 5 105.90 16.00 EA $ 1,694.40
$ . End Seals(8"Pipe) $ 88.80 8.00 EA $ 710.40
$ . 8"45's $ 151.07 16.00 EA $ 2,417,12
5 - 8"Acc Packs $ 78.93- 32.00 EA 5 2,525,76
$ - Concrete $ 160.00 10.00 CY $ 1,600.00
_
5 - Small Load Fee $ 125.00 5.00 EA $ 625.00
$ $
5 - 12"45's Restocking Fee 5 5,592.72 1.00 EA $ 5,592,72
$ - Consumables 3.0% 35,358.00 (%of total labor) $ 1,060.74
Taxes N/A 390.00 (%of total) N/A 5 - Tones 7.0% 24,315.20 (%of total mat'l) $ 1,702.06
Total Subcontractor
$ 390.00 Total Material $ 26,037.26
OTHER
Date: 10/31/24
CODE DESCRIPTION RATE CITY I UNITS VENDOR Total$
gond Increase/Adder 1% 5 91,599 %of Total$$ 5 915.99
$
$ - MAC Construction&Excavating,Inc.
Total Other $ 915.99
Labor $ 35,358.00 Equipment $ 17,003.63
NOTES: OH&Pee 15% $ 5,303.70 OH&P ID 15% $ 2,550.54
1.The attached quotation Information forms an Integral part of MAC's pricing.MAC reserves the right to additional Total Labor $ 40,661.70 Total Equipment $ 19,554.17
compensation and/or time should this Information as Included not be acceptable.
Subs $ 390.00 Material/Other, $ 26,933.25
OH&P A'5% $ 19.50 OH&P tit 15% $ 4,039.99
Total Subs $ 409.50 Total Material $ 30,973.24
MRC Total$$: $ 91,599I
Per Box Culvert(Per EA) $ 18,320
Rev 0
Page 4 of 6 Printed on:12/9/2024
MAC Project: Utica-Sellersburg Road and Charlestown Jeffersonville
Pike Reconstruction Phase 1
. __:L__:1 CONSTRUCTION
MAC Request for Change:124048-Line Stops
MRC Description:Installation of 8"Waterline
LABOR EQUIPMENT
HOURLY RATE HOURS TOTAL DAILY + TOTAL
QTY DESCRIPTION REG O.T. REG O.T. TOTAL LABOR$ QTY TYPE RATE DAYS HOURS EQUIP$
Water Stops(2 Ea) _ 0.00 $ - Water Stops(2 Ea) $ -
1 Foreman $ 100.00 $ 131.00 14.00 14.00 $ 1,400.00 1 Cat 315 $ 745.68 14.00 $ 1,364.94
2 Operator $ 64.00 S 84.00 28.00 28.00 $ 1,792.00 1 Trench Box $ 179.00 14.00 $ 313.25
2 Pipe Layer $ 52.00 $ 68.00 28.00 28.00 $ 1,456.00 1 Hoe Ram $ 411.28 14.00 $ 719.74
$ - 2 Road Plates(8x20) $ 40.00 28.00 $ 140.00
$ - 1 Skidsteer $ 357.76 14.00 $ 626.08
$ $
$ -
$ -
Taxes&Insurance $ 1,952.16 $ -
Total Labor 70.00 0.00 70.00 $ 6,600.16 Total Equipment $ 3,104.01
SUBCONTRACTORS _ MATERIAL
CODE I DESCRIPTION RATE CITY _ UNITS VENDOR TOTAL$ CODE ' DESCRIPTION RATE QTY UNITS Total$
Water Stops(2 Ea) $ - Water Stops(2 Ea) $ -
8"Line Stop $ 9,300.00 2.00 EA Workmans $ 18,600.00 Concrete $ 160.00 16.00 CY $ 2,560.00
Additional Traffic Control $ 5,000.00 1.00 IS Saf-ti-co $ 5,000.00 Small Load Fee $ 125.00 4.00 EA $ 500.00
Stone Haul and Haul Off $ 120.00 14.00 HR W-Transfer $ 1,680.00 Backfill Stone $ 13.65 40.00 Ton $ 546.00
$ - 8"45's $ 151.07 4.00 EA $ 604.28
$ - 8"Acc Packs $ 78.93 8.00 EA $ 631.44
$ - Consumables 3.0% 6,600.16 (%of total labor) $ 198.00
Taxes N/A 25,280.00 (%of total) N/A $ - Taxes 7.0% 5,039.72 (%of total mat'I) $ 352.78
Total Subcontractor
$ 25,280.00 Total Material $ 5,392.51
OTHER _ Date: 10/31/24
CODE DESCRIPTION RATE QTY I UNITS VENDOR Total$
Bond Increase/Adder 1% $ 44,416 %of Total$$ $ 444,16
$ - MAC Construction&Excavating,Inc.
$
Total Other $ 444.16
Labor $ 6,600.16 Equipment $ 3,104.01
NOTES: OH&P @ 15% $ 990.02 OH&P @ 15% $ 465.60
1.The attached quotation Information forms an integral part of MAC's pricing. MAC reserves the right to additional Total Labor $ 7,590.18 Total Equipment $ 3,569.61
compensation and/or time should this information as included not be acceptable.
Subs $ 25,280.00 Material/Other $ 5,836.67
OH&P @ 5% $ 1,264.00 OH&P @ 15% $ 875.50
Total Subs $ 26,544.00 Total Material $ 6,712.17
MRC Total$$: $ 44,416 I
Per EA $ 22,208
Rev 0 Page 5 of 6 Printed on:12/9/2024