Loading...
HomeMy WebLinkAboutMAC Construction Change Order No.1 for Jeff CCMG 2024-1 Street Paving Project (BBPW approved 10/23/24) CHANGE ORDER- EXTRA WORK AGREEMENT NO. 1 JOB NO. 24017 Project Name Jeffersonville CCMG 2024-1 Street Paving Project Contractor MAC Construction&Excavating, Inc. You are hereby authorized to proceed with the following described extra work associated with milling and paving of Falcon Rd. &Meadowland Dr.: As per attached documentation: 1. Mobilization/Demobilization = $ 8,637.00 2. Maintenance of Traffic = $ 5,000.00 3. Asphalt Milling/Cleaning _ = $ 2,016.00 4. HMA Surface,Type B (Assume 165 LB/SY)(1.5 Inch) = $ 11,725.00 TOTAL = $ 27,378.00 The method of payment for this change or extra work shall be: An additional amount of Twenty seven thousand three hundred seventy eight dollars and no cents= $27,378.00 Consulting Engineer: Jacobi, Toombs and Lanz, Inc. f� 10-21-2024 • ngineer's signature Date Owner's Approval: Jeffersonv'le .. • of Odic Works and Safety 10 •a�-a Signature of Owner( Date Contractor's Approval: MAC Construction&Excavating, Inc. 'vc Project Manager 10/17/24 Authorized Representative Title Date Y:\SharedUTL\Projects\Active\24017-Jeffersonville CCMG 2024-1 Paving Project\Documents\24017 Change Order 1-Paving Falcon Rd and Meadowland Dr.xls BID PROPOSAL =MAC CONSTRUCTION MAC CONSTRUCTION & EXCAVATING, INC. 1908 UNRUH COURT NEW ALBANY,IN 47150 Contact: Ted Newton Phone: 239-877-8809 Email: tedn@macconstruction.com Quote To: Kevin Morlan Job Name: Jeffersonville CCMG 2024-1 Paving Street Commissioner C.O.#1 -Falcon Rd/Meadowland Dr. Job# 124229 Phone: 812-285-6455 Email: kmorlan@cityofjeff.net Engineer: Jacobi Toombs and Lanz ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT 10 MOBILIZATION/DEMOBILIZATION 1.00 LS 8,637.00 8,637.00 20 MAINTENANCE OF TRAFFIC 1.00 LS 5,000.00 5,000.00 30 ASPHALT MILLING/CLEANING 2,100.00 SYD 0.96 2,016.00 40 HMA SURFACE,TYPE B(ASSUME 165 LB/SY) 175.00 TON 67.00 11,725.00 (1.5 INCH) GRAND TOTAL $27,378.00 NOTES: 1. All fuel and asphalt prices are subject to a price adjustment using the formulas of calculation per the Kentucky 2008 Standard Specifications for Road and Bridge Construction. 2. MAC excludes permits,bonds,testing,rock excavation,handling or disposal of contaminated materials,relocation of existing utilities,and any applicable fees. 3. Bid is based on normal work hours. 4. MAC excludes undercut and refill. Page 1 of 1