Loading...
HomeMy WebLinkAboutLouisville Paving (Charlestown Pike Project) City ofJeffersonville Redevelopment Commission Charlestown-Jeffersonville Pike Reconstruction Phase 2 CHANGE ORDER NO.: 4002 Owner: City Of Jeffersonville Owner's Project No.: 20157 and 20158 Engineer: HWC Engineering Engineer's Project No.: 2024-060-S Contractor:Louisville Paving Contractor's Project No.: Charlestown Pike Phase 2 Project: Phase 2 Contract Name:Charlestown-Jeffersonville Pike Reconstruction- Phase 2 Date Issued: October 24,2024 Effective Date of Change Order: The Contract is modified as follows upon execution of this Change Order: Description: This change order was generated as a result of sanitary manholes being in conflict of the proposed curb and gutter line along the West side of Charlestown Pike.No provisions we given in the plan on how to construct these areas. Revised plan sheets showing the ulilizal•on of curb turnouts were provided by United.These plan sheets, along with quantity changes,are included in this packet. Attachments: 1. Pay Item Changes and Cost Breakdown 2.Cnange Order Explanation 3. Supporting Documentation Change in Contract Price Change in Contract Times Original Contract Price: Original Contract Times: Substantial Completion: September 30,2025 $ 8,135,000.00 Ready for final payment: November 14,2025 [Increase] [Decrease] from previously approved Change [Increase] [Decrease] from previously approved Orders No. 1 to No. Change Orders No.1 to No. June 19.2026 Substantial Completion: $ 1,214.00 Ready for final payment: June 19,2026 Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: June 19,2026 $ 8,136,214.00 Ready for final payment: June 19,2026 [Increase] [Decrease] this Change Order: [Increase] [Decrease] this Change Order: Substantial Completion: NA $ 19,636.08 Ready for final payment: NA Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantiai Completion: June 19, 2026 $ 8,155,850.08 Ready for final payment: June 19.2026 Recommended by Engineer(if required) Acc fed by Contractor By: teVvrt. Vaeyev 1 — Title: Resident Protect Representative -17,2c Date: 1 0/2412024 1 0:08:04 AM eo/ / -i-i e 4,4 Authorized by Owner Approved by Funding Agency(if applicable) • BY 1 D \1..l tfi �r � Title: �► '}-yU CT ..V/ Date: [ GTAv�2-.; 006363 1111111411k 15415 Shelbyville Road Louisville, KY 40245 MEN" A�l,) S• _1 _ I V 1 (502)583-1726 Since 7949 CHANGE IN CONTRACT Date: 10/21/2024 Change Order No. 2 Project Name: Charlestown Pike-Phase 2 Furnish all labor,materials and equipment to perform the following extra work: Description Quantity Unit Unit Price Excavation,Common 64 CYS $ 50.00 $ 3,200,00 Borrow -64 CYS $ 55.00 $ (3,520.00) Curb and Gutter Concrete -49 LFT $ 28.55 $ (1,398.95) Water 1 KGAL $ 2.00 $ 2.00 Sodding, Nursery 355 SYS $ 5.59 $ 1,984.45 Pipe,Type 2,Circular,12 In. 4 LFT $ 65.00 $ 260.00 Video Inspection For Pipe 4 LFT $ 2.50 $ 10.00 Manhole,C4 -S EACH $ 4,200.00 $ (21,000.00) Curb and Gutter,Turnout,Concrete 49 LFT $ 136.75 $ 6,700.75 Field Drilled Hole In Concrete 5 EACH $ 250.00 $ 1,250.00 Plug(Inlet or Manhole) 2 EACH $ 150.00 $ 300.00 Manhole,C2 7 EACH $ 4,549.69 $ 31,847.83 TOTAL $ 19,636.08 The contract time will be increased/decreased by days. TOTAL COR AMOUNT $ 19,636.08 Accepted by: Accepted by: LOUISVILLE PAVING CO.,INC. 1-9l e r S h-&-e-- Signature Signature Printed Name: Printed Name: Tyler Sherer Date: 10/21/2024 Date: '1X'ideottr t; . por role L..4. ... , . ,.„.mieo.,...„.. 42i:.; - tsto,r141-- ..„.. ;:.:,..i.04,,:,,,,._.64.14),