Loading...
HomeMy WebLinkAboutJacobi, Toombs, and Lanz (Veteran's Pkwy & River's Shore Lift Station) AMENDMENT NO. 1 TO WORK ORDER NO. 2023-3 RIVER SHORE CONDOS PUMP STATION REPLACEMENT AND VETERANS PARKWAY LIFT STATION AND FORCE MAIN UPGRADES CONSTRUCTION ADMINISTRATION AND INSPECTION This Amendment No. 1 made and entered into this 5t ' day of 52P}embCr, 2024,by and between the City of Jeffersonville,Indiana,acting thru its duly appointed Sewer Board(OWNER),and Jacobi,Toombs and Lanz,LLC (CONSULTANT), WITNESSETH WHEREAS,the OWNER and the CONSULTANT did,on October 5,2023,enter into Work Order No.2023-3 providing necessary Construction Engineering Services required in connection with the full-time Construction Administration & Inspection of the River Shore Condos Pump Station Replacement project and Veterans Parkway Lift Station and Force Main Upgrades project,and, WHEREAS,the Contractor's Original Completion date for the Veterans Parkway Lift Station and Force Main Upgrades project by contract was April 2,2024, subject to unsuitable weather,and, WHEREAS,the Contractor has not yet completed work on the Veterans Parkway Lift Station and Force Main Upgrades project,and, WHEREAS,the Contractor's failure to complete work on the Veterans Parkway Lift Station and Force Main Upgrades project by the contract completion date resulted in additional services by the CONSULTANT,and, WHEREAS,Section C of the Work Order agreement associated with Exceeding Estimated Fees states that the CONSULTANT reserves the right to request an adjustment to the estimated total fees,if necessary,as a result of scope changes or schedule adjustments that are outside the CONSULTANT'S control. NOW THEREFORE,it is agreed by and between the parties hereto to the following additions or changes in the agreement: SECTION C —PAYMENT TERMS The first sentence of this section shall be revised to read as follows: Payment to the CONSULTANT for Construction Administration and Inspection Services shall be on a time and materials basis,based on the JTL hourly billing rates current at the time that work is completed, for a fixed,not to exceed sum of$211,500.00. This is a supplement in the amount of$47,000.00 over and above the original$164,500.00 not to exceed contract amount. This supplemental fee equates to two additional months of inspection services at$23,500 per month,which was the monthly rate that was the basis of the original fixed, not to exceed sum. y:56arcd\JTL\rro..t,\Act.a\5087-Rive 5602 coed..;r5 and Veterans r5 b FM Inapo t on\froposal\l 0$7 In,p«bon Amendme0t No.I.doe EXCEPT as herein modified, charged and supplemented, all items of the original Work Order No. 2023-3 agreement dated October 5,2023 shall continue in full force and effect. IN WITNESS WHEREOF,the parties hereto have made and executed this Amendment No. 1 the day and year first mentioned above. OWNER: CONSULTANT: Jeffersonville Sewer Board Jacobi,Toombs, and Lanz, LLC Jeffersonville, Indiana 1829 E. Spring Street 500 Quartermaster C rt New Albany,IN 47150 Jeffersonville,India 7130 (812) 945-9585 (812) 285-6400 U Mithaet tfattf t By 1 Harris(Aug 20,202410:51 EDT) Mayor like Moore,Presi ent Michael C. Harris,P.E. President L=1) 10 bar6 By_ .-e-_ itnesSJosh Darby(Aug 20,202411:27 EDT) Dale L. Orem,Member Josh Darby,P.E. Construction Services Team Leader By \/. .4-41`-'0- Aram._ William A. Saegesser P.L.S.,Member Y\56areaNiTL'rroieca'Aeti..e\.2 5057-Kn,er 5♦tore Condos r5 and Veterans r5 s FM kspeahon\rroposal\z)O57 InspcctIo Amendment No.1.doc