Loading...
HomeMy WebLinkAboutEllingsworth Commons Section 5, Rock Hill Trail 202404894 MISC $25.00 02/27/2024 03:40:00P 6 PGS Steve Gill C� Clark County Recorder IN Recorded as Presented II II II II II I I I Ill I Hill II II RESIDENTIAL DEVELOPMENT STORM WATER LONG-TERM OPERATION AND MAINTENANCE AGREEMENT File No: LTMA.Ellingsworth Commons 10.11.23 Parcel ID: _10-42-01-400-212.000-039 As accepted through SWQMP No: PW23-0030 10.19.23 Project Name: Ellingsworth Commons Section 5, Rock Hill Trail Primary function or description of activities to be executed at the site: 86 lot residential subdivision on 30.7 acres Stormwater Pollution Prevention Plan - Post Construction Component (Section C) C1 - Description of pollutants and their sources associated with the proposed land use Post construction pollutants are expected to be pollutants consistent with that of a residential area ( i.e., motor oil, gasoline spills, engine coolant, and other hydrocarbons, lawn chemicals, detergent, and trash/litter). C2 - Description of proposed post-construction stormwater measures Pollution control of hydrocarbons and trash shall be provided with the use of a detention basin and established vegetation at the project site. Pre-development peak 2-year, 10-year, and 100-year discharge rates were reduced through the use of a detention basin. Pre-development and post- development peak discharge rates are: Pre-development Post-development 2-yr= 35 cfs 2-yr= 35 cfs 10-yr= 57 cfs 10-yr= 57 cfs 100-yr= 78.5 cfs 100-yr= 78.5 cfs C3 — Plan details for each stormwater measures The proposed post-construction stormwater measures include a retention basin (see sheet C-401) and permanent vegetation. All stormwater discharge from the proposed subdivision will be collected into this retention basin. Some proposed rear yard areas will also release post construction stormwater which shall be controlled with established permanent vegetation. C4 - Sequence describing stormwater measure implementation A retention basin and established permanent vegetation will be used to control pollutants. C5 - Maintenance guidelines for proposed post-construction stormwater measures After completion of construction, the property owner will be responsible to maintain the established permanent vegetation around perimeter of the site and within the stormwater basin. Promptly repair any small rills that form. Add fertilizer and lime as needed to maintain healthy vegetation. Mow as needed but not shorter than four inches. Where vegetation has actively trapped sediment or other pollutants, remove and properly dispose of the accumulated sediment/pollutants, regrade the area, and reseed when conditions are favorable for vegetative establishment. Page 1 of 6 C6 - Entity that will be responsible for operation and maintenance of the post- construction stormwater measures Ellingsworth Commons Homeowners Association. This AGREEMENT, made and entered into this 11th day of October, of the year 2023, by and between Ellings Property Development LIc(hereinafter called the "OWNER")and the City of Jeffersonville, Indiana. WITNESS, that WHEREAS, Ordinance No. 2021-OR-14, was adopted April, 21, 2021, by the City of Jeffersonville establishing requirements for storm water quality Best Management Practices(BMPs) and a Storm Water Quality Management Permit (SWQMP) to manage the quality of storm water discharged from areas of urban development and redevelopment. WHEREAS, under said Ordinance, the City of Jeffersonville shall have the authority to inspect private systems within the City of Jeffersonville and to order such corrective actions to said private storm water management systems as are necessary to maintain properly the storm water management systems within the City of Jeffersonville. WHEREAS,under said Ordinance it is provided that storm water quality BMPs not owned municipally must be maintained by the property owner according to the terms of Long-Term Operation and Maintenance Agreement that must be implemented before a SWQMP is approved. WHEREAS, the City of Jeffersonville has adopted and approved technical guidelines relating to storm water quality best management practices in the City of Jeffersonville. WHEREAS,the owner is the legal title-holder of certain real property, more particularly described as Being a part of Survey 14 of the Illinois Grant to Clark county,Jeffersonville Township,IN as recorded by deed in the land records of the County of Clark, in Deed Book at Page (hereinafter called the "Property"). WHEREAS,the OWNER is proceeding to build on, develop or redevelop the Property. WHEREAS, the Stormwater Pollution Prevention Plan (SWPPP), sealed by David Blankenbeker, PE., a licensed Professional Engineer, dated 5/31/23,on file, the City of Jeffersonville, which is expressly made part hereof, as approved or to be approved by the City of Jeffersonville, provided for storm water quality management within the confines of the Property. WHEREAS,the City of Jeffersonville and the OWNER agree that the health, safety, and general welfare of the residents of the City of Jeffersonville require that onsite storm water quality best management practices be constructed, operated and maintained on the Property. WHEREAS, the City of Jeffersonville requires that onsite storm water facilities in accordance with the Stormwater Pollution Prevention Plan (SWPPP) be adequately designed, constructed, installed, operated and maintained by the OWNER. Page 2 of 6 WHEREAS, an approved Stormwater Pollution Prevention Plan—Post Construction Component(Section C) will adequately illustrate the location type and extent of storm water quality BMPs, minimum inspection procedures and schedule, minimum operation procedures and schedule, and anticipated minimum maintenance activities including when and how to remove accumulated/collected/filtered/amassed/grown excess vegetation, sediment, debris, trash, pollutant and/or forms of pollution from the storm water quality best management practices. NOW THEREFORE, In consideration of the foregoing premises, the mutual covenants contained herein, and the following terms and condition,the parties hereto agree as follows: 1. The onsite storm water quality best management practices shall be constructed by the OWNER in accordance with the SWPPP and Long-Term Operation and Maintenance Plan. 2. The OWNER shall operate and maintain the storm water quality BMPS as directed by the Long- Term Operation and Maintenance Plan in good working order acceptable to the City of Jeffersonville for perpetuity. 3. The OWNER agrees that inspections will be performed by a Qualified Professional. 4. The OWNER agrees that inspections will be documented and include the following information: a. A description of the current operational or functional status of the storm water quality BMPs. For structures that accumulate sediment,trash, debris other pollutant or form of pollution, an indication of used and remaining capacity (fraction, percentage, depth or volume) shall be given to identify when the BMP must be cleaned out. b. Identification of any necessary repairs, sediment/debris removal or replacement of all or portions of the storm water system(s). c. The results of any field or laboratory analyses performed. d. Other relevant or unusual observations related to the system(s). e. Action plan to prevent premature storm water system failure as consistent with the Long- Term Operation and Maintenance Agreement(s) provisions. f. Action plan to prevent the premature system failure that exceeds the Long-Term Operation and Maintenance Agreement(s) provisions, but are necessary to prevent storm water pollution from leaving the site. 5. The OWNER hereby grants permission to the City of Jeffersonville, its authorized agents and employees to enter the property to inspect the storm water quality best management practices whenever it deems necessary. Whenever possible, the City of Jeffersonville shall notify the OWNER prior to entering the Property. Page 3 of 6 6. In the event the OWNER fails to maintain storm water quality best management practices in accordance with the SWPPP and Long-Term Operation and Maintenance Plan in good working order acceptable to the City of Jeffersonville,the City of Jeffersonville may enter the property and take whatever steps it deems necessary to repair or maintain said storm water quality best management practices. This provision shall not be construed to allow the City of Jeffersonville to erect any structure of a permanent nature on the land of the OWNER without first obtaining written approval of the OWNER. It is expressly understood and agreed that the City of Jeffersonville in under no obligation to maintain or repair said facilities, and in no event shall this Agreement be construed to impose any such obligation on the City of Jeffersonville. 7. In the event the City of Jeffersonville, pursuant to this Agreement, performs work of any nature, or expends any funds in performance of said work for labor,use of equipment,supplies,materials, and the like, the OWNER shall reimburse the City of Jeffersonville upon demand, within ninety (90) days of receipt thereof for all costs incurred by the City of Jeffersonville hereunder. In the event,the OWNER does not reimburse the City of Jeffersonville within ninety(90)days of receipt; the City of Jeffersonville may apply a lien upon the property for double the expense to the City of Jeffersonville. In the event that the OWNER does not reimburse the City of Jeffersonville within one year from the application of a lien upon the property then the City of Jeffersonville may take other legal measures to recover costs, including associated legal costs, incurred by the City of Jeffersonville. 8. It is the intent of this Agreement to guarantee the proper maintenance of onsite storm water quality best management practices by the OWNER; provided, however,that this Agreement shall not be deemed to create or affect any additional liability of any party for damage alleged to result from or be caused by storm water management practices. 9. The OWNER, its executors, administrators, assigns, and any other successors in interest, shall indemnify and hold the City of Jeffersonville and its agents and employees harmless for any and all damages, accident,casualties,occurrences,or claims which might arise or be asserted against the City of Jeffersonville from the construction, presence,existence,operation or maintenance of the storm water quality best management practices by the OWNER or the City of Jeffersonville. 10. In the event a claim is asserted against the City of Jeffersonville, its agents, or employees for the construction, presence, existence, operation or maintenance of the storm water quality best management practices by the OWNER, the City of Jeffersonville shall notify the OWNER and the OWNER shall defend at its own expense any suit based on such claim. If any judgment or claims against the City of Jeffersonville, its agents, or employees shall be allowed,the OWNER shall pay all costs and expenses in connection therewith. 11. This Agreement as attached by the SWPPP and Long-Term Operation and Maintenance Plan shall be recorded among the land records of the City of Jeffersonville, and shall constitute a covenant running with the land, and shall be binding on the OWNER, its administrators, executors, assigns, heirs, and any other successors in interest. 12. This Agreement as attached by the SWPPP and Long-Term Operation and Maintenance Plan shall be recorded among the real property title documents for said property, and shall constitute a covenant running with the land,and shall be binding on the OWNER,its administrators,executors, /4 assigns, heirs, and any other successors in interest. Page 4 of 6 [Signature pages follow.] WITNESS the following signatures and seals: City of Jeffersonville, Indiana By: Drainage Board,Chair I, ‘We i / , a Notary Public in and for the City of Jeffersonville and State of aforesa. , whose commission expires on the day of �vi2c of the yearZ;,V ,do certify that /7/7) �t/7////r✓ whose names are signed to the foregoing Agreement bearing date of the %3 day of ,G;;_broni- , of the year ' , have acknowledged the same before me in my said City of Jeffersonville and State aforesaid. GIVEN under my hand this / day of `�YUQry , of the year --- 126794. Notary Public CHRISTY M O'NEIL Seal Notary Public-State of Indiana Clark County My Commission Expires May 9,2026 LIC#NP0713339 • Reviewed and appro ed By: Mike Moore, Sewer Board President I, (7Nei/ , a Notary Public in and forte City of Jeffersonville and State of aforesaid'whose commission expires on the /- day of e / . ,-% of the yearn? ,do certify that /72iif& /77ooee whose-rfames are signed to the foregoing Agreement bearing date of the day of /-e6/7- /7-1 , of the yearAiv2yt, have acknowledged the same before me in my said City of Jeffersonville andtate aforesaid. 27/ GIVEN under my hand this day of br" /'L/ ,of the year �n `71. Notary Public CHRIBTY M O'NEIL Seal Notary Public-State of Indiana Page 5 of 6 Clark County My CommissionIC#NP0713339y 9'2026 L Owner of Prope BY x Owner,as D s ri n Page of the Document ATTEST: 00y7,0, THERESA M TALLEY .`'1P• •.GA/'%Notary Public, State of Indiana SEAL "= Clark County ••, * Commission Number NP0621835 �'��/ryQ;;:0-,.- My Commission Expires /� „1„,1��`‘ October 21,2026 !�4- / / I, � , a Notary Public in and for the City of Jeffersonville and State of aforesaid, whose com fission expiresx the , 3 day of 1 rn t i'y of the year .44 .1 ,do certify that �f�o' 'ei/'y /y'767 whose names are signed to the foregoing Agreement bearing date of the .2.3 day of cria u 1 , of the year,Z9.21, have acknowledged the same before me in my said City of Jeffersonville/and State aforesaid. GIVEN un r my hand this -2-3 day of �(40 , of the year g-4P--1-11. l Lap.#---71P\--C124? Notary Public This instrument prepared by: P ck_r C e V� Tl ldeDrainage Board Attorney Signature "I affirm under the penalties for perjury,that I have taken reasonable care to redact each Social Security number in this document, unless required by law." Signature C4L-44 ft:\72*- Person's e presenting for recording Page 6 of 6