Loading...
HomeMy WebLinkAboutGateway 1000 COMMERCIAL/INDUSTRIAL DEVELOPMENT STORMWATER LONG-TERM OPERATION AND MAINTENANCE AGREEMENT 202401427 MISC $25.00 01/22/2024 09:36:52A 20 PGS File No: Gateway2023 Parcel ID: 10-42-04-000-005.000-039 Steve Gill Clark County Recorder IN As accepted through SWQMP No: PW22-0509 Recorded as Presented Project Name: Gateway 1000 II II II ill III I I I I ill II II II ll Primary function or description of activities to be executed at the site: The proposed land use is an industrial facility. This AGREEMENT, made and entered into this day of October, of the year 2023, by and between COI Gateway 1000, LLC, an Indiana limited liability company, its successors and assigns (hereinafter called the "OWNER") and the City of Jeffersonville, Indiana. WITNESS, that WHEREAS, Ordinance No. 2021-OR-14, was adopted April, 21, 2021, by the City of Jeffersonville establishing requirements for storm water quality Best Management Practices(BMPs) and a Storm Water Quality Management Permit (SWQMP) to manage the quality of storm water discharged from areas of urban development and redevelopment. WHEREAS, under said Ordinance, the City of Jeffersonville has the authority to inspect private systems within the City of Jeffersonville and to order such corrective actions to said private storm water management systems are necessary to maintain properly the storm water management systems within the City of Jeffersonville, in accordance with all applicable ordinances. WHEREAS, under said Ordinance it is provided that storm water quality BMPs not owned municipally must be maintained by the property owner according to the terms of Long-Term Operation and Maintenance Agreement that must be implemented before a SWQMP is approved. WHEREAS, the City of Jeffersonville has adopted and approved technical guidelines relating to storm water quality best management practices in the City of Jeffersonville. WHEREAS, the owner is the legal title-holder of certain real property, more particularly described as 700 International Drive,Jeffersonville, IN 47130 as recorded by deed in the land records of the Clark County, Indiana Recorder, instrument number 202210919 (hereinafter called the "Property"). WHEREAS, the OWNER is proceeding to build on, develop or redevelop the Property. WHEREAS, the Stormwater Pollution Prevention Plan (SWPPP) and Stormwater Operation and Maintenance Manual, sealed by Ross L. Nixon PE, a licensed Professional Engineer, dated August 2, 2023, on file with the City of Jeffersonville, which is expressly made part hereof, as approved or to be approved by the City of Jeffersonville, provided for storm water quality management within the confines of the Property. WHEREAS, the City of Jeffersonville and the OWNER agree that the health, safety, and general welfare of the residents of the City of Jeffersonville require that onsite storm water quality best management practices be constructed, operated and maintained on the Property. WHEREAS, the City of Jeffersonville requires that the onsite storm water facilities be constructed and maintained in accordance with the Stormwater Pollution Prevention Plan (SWPPP) and Stormwater Operation and Maintenance Manual and be maintained by the OWNER. WHEREAS, the approved SWPPP and Stormwater Operation and Maintenance Manual adequately illustrate the location type and extent of storm water quality BMPs, minimum inspection procedures and schedule, minimum operation procedures and schedule, and anticipated minimum maintenance activities including when and how to remove accumulated/collected/filtered/amassed/grown excess vegetation, sediment, debris, trash, pollutant and/or forms of pollution from the storm water quality best management practices. NOW THEREFORE, In consideration of the foregoing premises, the mutual covenants contained herein, and the following terms and condition, the parties hereto agree as follows: 1. The onsite storm water facilities ("Facilities") required pursuant to the SWPPP and Storm Water Operation and Maintenance Manual shall be constructed by the OWNER in accordance with the SWPPP and Stormwater Operation and Maintenance Manual. 2. The OWNER, and its successor and assignees shall operate and maintain the Facilities as directed by the Stormwater Operation and Maintenance Manual, and in good working order acceptable to the City of Jeffersonville for perpetuity. 3. The OWNER, and its successor and assignees, agrees that inspections will be performed by a Qualified Professional (as defined in the Stormwater Operation and Maintenance Manual). 4. The OWNER, and its successor and assignees agree that inspections will be documented and include the following information: a. A description of the current operational or functional status of the storm water quality BMPs. For structures that accumulate sediment, trash, debris other pollutant or form of pollution, an indication of used and remaining capacity (fraction, percentage, depth or volume) shall be given to identify when the BMP must be cleaned out. b. Identification of any necessary repairs, sediment/debris removal or replacement of all or portions of the storm water system(s). c. The results of any field or laboratory analyses performed. d. Other relevant or unusual observations related to the system(s). e. Action plan to prevent premature storm water system failure as consistent with the Long- Term Operation and Maintenance Agreement(s) provisions. 4878-5761-9592,v. 3 f. Action plan to prevent the premature system failure that exceeds the Long-Term Operation and Maintenance Agreement(s) provisions, but are necessary to prevent storm water pollution from leaving the site. 5. The OWNER hereby grants permission to the City of Jeffersonville, its authorized agents and employees to enter the Property to inspect the Facilities and the storm water quality best management practices whenever it deems necessary. Whenever possible, the City of Jeffersonville shall notify the OWNER prior to entering the Property. 6. In the event the OWNER fails to maintain the Facilities in accordance with the and Stormwater Operation and Maintenance Manual, in good working order acceptable to the City of Jeffersonville then, after giving the Owner notice and a reasonable opportunity to cure the alleged failure, the City of Jeffersonville may enter the Property and take whatever reasonable steps it deems necessary to repair or maintain said such Facility. This provision shall not be construed to allow the City of Jeffersonville to erect any structure of a permanent nature on the land of the OWNER without first obtaining written approval of the OWNER. It is expressly understood and agreed that the City of Jeffersonville is under no obligation to maintain or repair said facilities, and in no event shall this Agreement be construed to impose any such obligation on the City of Jeffersonville. 7. In the event the City of Jeffersonville, pursuant to this Agreement, performs work of any nature, or expends any funds in performance of said work for labor, use of equipment, supplies, materials, and the like, the OWNER shall reimburse the City of Jeffersonville upon demand, within ninety (90) days of receipt thereof for all actual, reasonable costs incurred by the City of Jeffersonville hereunder. In the event,the OWNER wrongfully fails to reimburse the City of Jeffersonville within ninety(90)days of receipt; the City of Jeffersonville may apply a lien upon the Property. In the event that the OWNER does not reimburse the City of Jeffersonville within one year from the application of a lien upon the Property then the City of Jeffersonville may take other legal measures to recover all actual, reasonable costs, including associated legal costs, incurred by the City of Jeffersonville. 8. It is the intent of this Agreement to guarantee the proper maintenance the Facilities by the OWNER; provided, however, that this Agreement shall not be deemed to create or affect any additional liability of any party for damage alleged to result from or be caused by the Facilities. 9. The OWNER shall indemnify and hold the City of Jeffersonville and its agents and employees harmless for any and all damages, accident, casualties, occurrences, or claims which arise or are asserted against the City of Jeffersonville , and are related to OWNER's failure to maintain the Facilities in accordance with this Agreement; provided, however, in no event will the foregoing indemnification obligation extend to claims or matters arising out of the City or another party's negligence or willful misconduct. 10. In the event a claim related to the OWNER's failure to maintain the Facilities in accordance with this Agreement is asserted against the City of Jeffersonville, its agents,or employees, OWNER shall defend at its own expense any suit based on such claim. If any judgment or claims against the City ofJeffersonville, its agents, or employees shall be allowed, and OWNER is determined to be at fault, and in all cases except to the extent of the City or another party's negligence or willful misconduct, the OWNER shall pay all actual and reasonable costs and expenses in connection therewith. 4878-5761-9592,v. 3 11. This Agreement as attached with the Stormwater Operation and Maintenance Manual shall be recorded among the land records of the City of Jeffersonville and shall be recorded among the real property title documents for said Property with the Clark County, Indiana Clerk, and shall constitute a covenant running with the land, and shall be binding on the OWNER, and its assigns, heirs, and any other successors in interest. OWNER(including any subsequent owner of the Property)shall be liable for claims arising hereunder only during their period of ownership of the Property, and, upon the completion of a transfer of the Property, be relieved of all liability hereunder, except that which arose during the transferor's period of ownership and which remains unsatisfied on the date of transfer. [Signature pages follow.] 4878-5761-9592,v 3 WITNESS the following signatures and seals: City of Jeffer onville, Ind. 'na By: Y.I Steve Gill, Drainage Board Chair I, \ ;n c\ ( 0 c b i.n , a Notary Public in and for the City of Jeffersonville and State of aforesaid, whose commission expires on the )- 1 day of A1itv fs-f of the year 2030 ,do certify that S-te v 6 0 whose names are signed to the foregoing Agreement bearing date of the / day of /1 t'v hcc , of the year ; , have acknowledged the same before me in my said City ofJeffersonville and State aforesaid. GIVEN under my hand this 1`% day of }ttn ,t S{ , of the year 2 Ova . ,,,,,"�p�%, SABRINA CORBIN (2LL---7 .`1�.••••,•C.1 Notary Public,State of Indiana _:'• c+=_ Clark County ;SEAL - f t Commission Number NP0743347 %, :0iP14 ‘� My Commission Expires otary Public °',//,iii�k��`� August 29,2030 • Reviewed and ap rove 0 By: Mike Moore, Sewer Board President I, ��/"/LS7cf (n,,V(9 / , a Notar Public in and for the City of Jeffersonville and State of aforesaid, whose commission expires on the day of /77e2c./_, of the year - , do certify that r /� p-},Pe whose names are signed to the foregoing Agreement bearing date of the /9z' day of _ c,„,, e A ?e c/ , of the year-19Lv2l , have acknowledged the same before me in my said City ofJeffersonville an State aforesaid. GIVEN under my hand this day of L.� .12ty , of the year 0;,244 . P CHRI8TY M O'NEIL Notary Public I Seal ' Notary Public-State of Indiana Clark County My Commission Expires May 9,2026 j LIC#NP0713339 Owner of Property COI Gateway 1000, LLC, an Indiana limited liability company By x �.. David M. arrison, Manager I, C„.1,. ► { a- fTA'K stir, , a Notary Public in the State of Missouri, County of Jackson, whose commission expires on the „210 day of �IL of the year Zh , do certify that David M. Harrison signed the foregoing Agreement bearing date of the day of NOV i- 1 e— , of the yearZ,0Z, have acknowledged the same before me in my said presence in the foresaid County and State . GIVEN under my hand this -3 day of NtV4,1443 £ ' , of the year ?0 a 3 CYNTHIA AITKEN Notary Public, Notary Seal State of Missouri Notary Public Jackson County Commission 015178092 My Commission Expires 04-26-2027 "I affirm under the penalties for perjury, that I have taken reasonable care to redact each Social Security number in this document, unless required by law." Signature *--c:4"7e1( Manual To be attached. ■• ■ 0 Si�Epi_ary •■ STRUCTUREPOINT ■ Stormwater Operation and Maintenance Manual For Gateway 1000 International Drive and Paul Garrett Avenue Jeffersonville, Indiana `‘‘‘‘ iiiuilI1 ,, p . L.NIXp'//i 3- � No. ° * PE10910604 STATE OF c ,§7: %��'r' /HDIANP � ? ssioK01- / . Prepared For: COI Gateway 1000, LLC 950 Goodale Blvd Suite 100 Columbus, OH 43212 Prepared By: American Structurepoint, Inc. 9025 River Road, Suite 200 Indianapolis, Indiana 46240 (317) 547-5580 Submitted/Prepared by: Ross Nixon,PE Alex Crowley, EI I AFFIRM UNDER PENALTY OF PERJURY THAT I HAVE TAKEN Submitted: April 1,2022 REASONABLE CARE TO REDACT Revised:August 2"d, 2023 EACH SOCIAL SECURITY NUMBER FROM THIS DOCUMENT UNLESS OTHERWISE REQUIRED BY LAW -Ross Nixon www.structurepoint.com O AMERICAN STRUCTUREPOINT, INC. TABLE OF CONTENTS OWNER ACKNOWLEDGMENT AGREEMENT ("AGREEMENT") SECTION I Owner Information SECTION II Site Information SECTION III Storm Structure Maintenance SECTION IV Conveyance Method (Storm Sewer) SECTION V Dry Detention Basin SECTION VI Inspection and Maintenance Schedule SECTION VII Utility Plan and Details O AMERICAN STRUCTUREPOINT, INC. SECTION I OWNER INFORMATION OWNER INFORMATION: COI Gateway 1000, LLC 950 Goodale Blvd Suite 100 Columbus, OH 43212 Representative: Brad Kendall Business Phone: (614) 745-0610 E-mail: brad.kendall@vantrustre.com OWNER RESPONSIBILITY: The Owner is responsible for all maintenance, including cost, associated with inspecting and maintaining the infrastructure included within this manual. O AMERICAN STRUCTUREPOINT, INC. Operation & Maintenance Manual For Gateway 1000 International Drive and Paul Garrett Avenue Jeffersonville, Indiana BMP OWNER NAME COI Gateway 1000, LLC 950 Goodale Blvd Suite 100 Columbus, OH 43212 Representative: Brad Kendall Business Phone: (614)745-0610 E-mail: brad.kendall@vantrustre.com GENERAL INFORMATION The purpose of water quality Best Management Practices is to filter the first flush of rainwater before it enters the downstream lakes and streams. Through the use of these Best Management Practices,the sediment and pollutant load in stormwater runoff is reduced, and in many cases the quantity of stormwater water runoff generated is also reduced. The use of Best Management Practices also helps to reduce hydrocarbons,trash and debris from entering waterways. OWNER RESPONSIBILITY The BMP Owner shall be responsible for all maintenance and costs associated with the proposed BMPs. In addition, it is the owner's responsibility to perform and/or pay for inspections and maintenance as recommended below. RIGHT OF ENTRY City of Jeffersonville representatives have the right to enter the property to inspect and, if required, maintain the BMPs at any time. ANNUAL INSPECTION REPORTS Annual inspection reports shall be submitted to City of Jeffersonville for each BMP. The first report is due one year after construction is completed,with subsequent reports due each year within the same month of the initial report. If there are any deficiencies found during the inspection,these should be addressed. If the inspection report is not received within the month it is due, if there are deficiencies which were not included in the report, or if any deficiencies included in the report are not addressed in a timely manner, the BMP owner faces enforcement action from City of Jeffersonville. O AMERICAN STRUCTUREPOINT, INC. SECTION II SITE INFORMATION The site contains 3 Best Management Practice (BMP)for the purpose of sediment removal. These BMP's are three dry detention ponds. The detention ponds are located on the east,west, and south side of the building. The ponds are hydraulically connected, with both the east and west ponds draining into the south pond, which outlets all the water from the site into the public storm sewer along Paul Garrett Avenue. See the attached site exhibits for BMP and storm sewer locations. City of Jeffersonville will require annual inspection reports of the water quality BMPs. O AMERICAN STRUCTUREPOINT, INC. SECTION III STORM STRUCTURE MAINTENANCE Storm structures are set at storm sewer pipe connections. Unless you have OSHA approved training and equipment, never enter a manhole. Inspection All inlet castings should be inspected monthly and after each rainfall event. More frequent inspections should be performed in areas where there is higher potential for trash or litter (e.g. retail establishments)and during the fall when leaves are present on the ground. Check the frame and lid for cracks and wear, such as rocking lids or lids moved by traffic. Storm structures and the surrounding areas should be inspected annually for pollutants such as leaks from dumpsters, minor spills, and oil dumping. Take action to have the pollutant source removed. Cleaning Clean structures when there is a blockage of a water flow path or when sediment depth reaches 6". Cleaning should be performed in a way that ensures removed sediment and water is not discharged back into the storm sewer. Safety Work inside underground structures requires special OSHA-required confined space equipment and procedures.The most practical option may be to contract with a sewer cleaning contractor. Materials Handling Disposal of waste from maintenance of drainage facilities shall be conducted in accordance with federal, state, and local regulations. Removed sediment must be disposed in the garbage as solid waste. Water should be disposed of in a sanitary sewer after oils are removed using oil absorbent materials or other mechanical means. Used oil absorbents should be recycled or disposed according to the manufacturer's instructions. Repairs Repair all security and access features so they are fully functional. This includes locking lids, covers, and ladder rungs. Replace broken parts or lids that rock or are moved by traffic. O AMERICAN STRUCTUREPOINT, INC SECTION IV CONVEYANCE MAINTENANCE (STORM SEWER) Storm sewer pipes convey stormwater. Pipes are built from many materials and are sometimes perforated to allow stormwater to infiltrate into the ground. Storm pipes are cleaned to remove sediment or blockages when problems are identified. Storm pipes must be clear of obstructions and breaks to prevent localized flooding. Inspection Pipes are difficult to inspect requiring special equipment and training.Usually, if a problem occurs the owner needs to call a sewer or plumbing contractor to inspect, repair or clean pipelines. Cleaning Clean pipes when sediment depth is greater than 1/4 of pipe diameter, with a maximum sediment depth of 6". When cleaning a pipe, minimize sediment and debris discharges from pipes to the storm sewer. Install downstream debris traps (where applicable) before cleaning and then remove material. Generally,use mechanical methods to remove root obstructions from inside storm sewer pipes. Do not put root-dissolving chemicals in storm sewer pipes. If there is a problem, remove the vegetation over the line. Safety Work inside underground structures requires special OSHA-required confined space equipment and procedures. The most practical option may be to contract with a sewer--cleaning contractor. Materials Handling Sediment and debris from pipes should be disposed in the garbage as solid waste. Pick out any rocks first. Repairs Repair or replace pipes when a dent or break closes more than 20 percent of the pipe diameter. Repair or replace pipes damaged by deterioration. O AMERICAN STRUCTUREPOINT, INC. SECTION V DRY DETENTION BASIN The site contains dry-detention basins on the east, west, and south portion of the site. Detention facilities are designed to hold and slowly release stormwater by use of a pond and a specially designed control structure. Inspection The dry detention pond should be inspected monthly,at a minimum, and more frequently if flooding or areas of erosion are identified.The inspection should include the pond outlet structure, emergency spillway, and concrete swales. Pond embankment should be inspected for evidence of erosion, cracking, bulging,or sliding.Any areas identified that could cause leaking or seeps should be corrected immediately. The emergency spillway should be inspected for obstructions, evidence of erosion, and rip rap failures. The receiving channel or storm sewer pipe immediately downstream of the detention pond should be inspected for sediment and/or erosion. All pipe end sections or headwalls entering or exiting the pond should be inspected for obstructions. Cleaning The entire detention pond (including berms and embankments)should be kept free of woody growth. The dry detention pond area(including berms and embankments) should be mowed frequently to maintain a grass height of five inches. Any animal burrows identified within the basin should be repaired immediately. Healthy vegetation should be present with at least 85 percent ground cover. If proper ground cover is not established, sod, seed, and/or erosion control blanket should be installed for proper establishment. Any sediment,trash or debris accumulated in the concrete swales should be removed immediately. Any trash or debris accumulated within the pond or near the outlet structure should also be removed immediately. Any floatable debris accumulated in this structure should be removed by means of netting or other safe removal method. Materials Handling Disposal of waste from maintenance of detention facilities shall be conducted in accordance with federal, state, and local regulations. Removed sediment must be disposed in the garbage as solid waste. Repairs Repair and seed bare areas. Repair eroded slopes when rills form, where the cause of damage is present, or there is the potential for future erosion. If berms or dams show signs of settlement or sinkholes, serious problems may be occurring. Spillway areas should be completely covered by established vegetation. O AMERICAN STRUCTUREPOINT, INC. SECTION VI INSPECTION AND MAINTENANCE SCHEDULE Structure/Unit Inspection Maintenance Storm Structure Monthly& after rain events Accumulate 6"of sediment Maintenance Conveyance Maintenance When problems occur Accumulate 6"of sediment (Storm Sewer) Dry Detention Basin Monthly Accumulate 2"of sediment O AMERICAN STRUCTUREPOINT, INC. SECTION VII UTILITY PLAN AND DETAILS 4 t \ / -- ,...,/ ...... w•1 %\ram• `�••.'`\\ y� rso� ; - -r' rrle am♦♦♦ ♦ �, y. - ---------- ill - ♦j► � �1 _'_tNAT; ._-- o■ - ' �- ♦/11 ♦ '" 4 .�„ ■ STAUC7UflEPO1NT ----.--tot%.•-vitte-•- 4.4.....,- ,6:"•' ...... ', , ',.. ..... s,' •,s, ,' / /// --•-•'—r-nrueit.t-1,11,--t*Nr..4k, 4"-.- ' •,' ,,;!,,,.., - ,, .-.., , \__A 1, = "'... k, NI, %.`,./,,' // use► ♦♦-- ice - • II 3•111/k14► v , , .♦ .• :4 fi -F'\ \'ice A_. - _ ^ - I Fed; , ►�.! ►$4a q I►♦ .� k J 1 - ,' - \- - / GATEWAY 7000 .1\.v A , —_.\_'_:7- . \' a EXISTING LEGEND l _ 420 Paul Gartetl Ave. ......... —,./''-- -.-/, \ , I ° 9 - —f�\ -T } �\� —\ \�-\ -.� -` ��\'\' }- '1 _ "\-� - ' /' / ® Jeffe.-sonvilelndiana \t I -\ '. ' PROPoseo Rtntaws -F'" - A•-"t' \- - {--A 1,—\ ° 1 °� „� o 1 -� -+ Ti� _'\''{'-�.T r --1._-\_—\—� \' •v %♦♦♦♦, ♦♦♦�♦ ��►� 1 4,4yi SITE LEGEND Pt... I -\ —\ �• — ♦,♦♦♦gyp♦O♦♦♦i' :.F;r; ° h .\- \` • 1---A• —1,--\-- T •x ° ° o .+'4h, '5 ®...��♦♦,Z►♦♦�♦��4' T }�\01. I I w drw-. u.., y i"° .0 ;y_ O `t•r �.'4 . .♦:♦.♦♦♦♦♦�.♦� • � .%I / i. •6.. —OERTIFIE06Y • \1 �' . ...,„, C.,,...`es: ♦�...�♦��,'�..:4♦♦�♦•'1{ ; 1��y -�--_-- Rtliph'MM I ----- '' h'�'+ ♦ ,-- � ISSUANCE RIDES 1 '.A••:• ` ♦♦� �� : -.- 7.1- _` _j I •/ OATS: - V:r..:': r .' ♦��►��,, ,��aA ;,�;\ '. J. - `__ '__ • �� i SITE DATA TABLE oulcro:.z W\ p, - :h�.���.:,�♦ ♦♦♦�.♦�, �•:,,5'II t o�i��Sy' ' .-'==---��--�--�� -\\�.-.-.--.-. B., i / Silt MS* - .moat/ PROJECT PIU6E: \ ►� ',' �'_♦�♦♦,' �� �- s� \ �`_-- ---- umgo�s uc �xa w¢s CONSTRUCTION EEf u . - ♦��,� -11-,Q •{„ / ff■■sa _Ey---- .L,. . !�.--.__ b.....,- I/'I ((.{\\ .[°n..o o[.uwlc• "®665-iIBS� REVISION 60NEOUlF �� tV .! \,, �•�•'♦v�' r' i•iYT / J' 'olY�o • _ {��/-( r--`— 1 Ha sHasa s v..as NOUE• rySwRwT�ON OATS !Y\ . 133.2033 ♦♦�" i""`_-i j"- N w , s1ilb ..q a wroeu.,..002,�rx..w�ns��..oR.,,a MIS w ».�.." oe'a m E / / % � .` CV.nc[ ■..f.e,Nu2Ee, D.011s, 41 %i I;l ➢QN OVEF;AL.L SI1fE PLAN 1 a as C200 • • "4. , "'7:, --„-:- 1 ..,.Ti.. / ....___.._ ..,......„..........„.........„ VanT 1.11 SI ..,,„. „., . I ,00..' ......"."--.-.....sZ.*. '''...... • ....• .., ' ....e .\ .1•13.,#33 ''.... ....:Z.--' ' '/' , F II/ , , PRCPOSED ---------------- /' /'I /' .•.............. .....,. , --------------- ------...,...,... tgae'' ------- ------- --- __ ...... ..,... a. / „ ...........'"............"' •'.,--,_ .1 .-.77.7=*::: ; i061 .::7- ''''':::17 ; ' ' "777::... ... i ' / / / ........... ....••••• %%Ali - ,...... .. STRUCTUREPOINT 1------ .. ..... ...- • Vt...-.-.-- 00,0 fAi ...- ..... . , --._ ,, ,// 40 N /r ( .../.'..... .. ....'' '''''iiiS0011% i II "A"" -.oh*: '''..‘' ‘\\ mama" -77,7i.F:.1.2:;7,7.7- • ., "" - ---001011,1,‘------- •,., IR tigyarl = --;„) •,... ,... / ---- illt, .4.. . .-t ..---i --..--• : \S., ,Y/ • / 11 ViVk--------.. :,',' '.... 111111011111 VIC' * ...... \ 'S / . .' 01.1111% ': re '''' S. ....,01..11241011 .....:':filikill0A1.5-'''''-7-- ' 2:1111111111111 1.".10/061 P ‘ •• .. . S. ••• ‘ ,,.,.. , . 11' .....,." . L- .,__-r,_,_ _-_,...------------.., _.....-..,‘„iit,„,--- . .. . ,-,- , -\-- , • _...\- - It --_ --...,..--- --, ,,,,,,, _jp„ , co=arri "_- .,,J,,,•••'..."S-1--z----- ,Awittlie-,---- ' 4 ----- --------------- .."------..*000.1111--- I"- 0------ ':'..1 . ,.., ...1.....-\--- , \.........\-."--, • A.---3r. , '1,..,...-V" , r. .... ...... --... -.:. ...:. ..,/,/,#' _.......,',10.11111,' (... ' -\---- ' . „,iperl . c-- --- • .1/4----, , _A: , s 011P7-10/1.• o .-! ' _-{ -‘,.. ' ___\---1-- , 'A...---}-- , \:_.-\-".--"i.--- ' \---1-- ' A...-k--\: --.7-..,_ - -,,, p.' v y _ )' GATEWAY 1000 ' \ ••• 1,°•••***111/0/0°lilt c: c'. -\---\---A- -.\-‘ -'*--k, \ :\----\--- ' _.\--A----I, 3 -2\"--. .-- •,_.'k-- -k-- . _A.• _-\- ° \- 'i',, --: „/:,/";/ , . . 1111 woo° • ‘', • - --- , _'A---\--- •, ',_-\--•,- • .\---- -- s 2A__--,1--: •,_\--r, •, :;r---\-,--, '1,-X) '''' ‘.,, ' /X ''' 420 Paul Garrett Ave S .00 o , --\--4 • ,'' -k-- , 4. _A-----1 ,. \--\--- , • .4--- , • ----k • 1 - - ' , , ,...---\-- , • __.-,---- , A__ - n, ,, ___,-- . , -..4- , ,.......\...--\ , ,___\----y-- ,,__,A...- ----1, , it ‘,_ .- ,,-,„.7 s % • ' -k". • ' -=V-A-- ' ' - • ' --A----\: ' \----V 's ' -)r.-1- ' —k--- --- ' . --- ' ' -k---" \• ', / -\----A:- ' ---k-- ' • \--\-A- ' -A--A,- • -\--\ -, ' -t-----\-- • _:\---\- , \-\---\-- • . j• : 41 L., / / - -\-- • _--- , - , • J,---- - ' ----.--s • // ''^—• - °------ -*-`----r--- Jeffersonville,Indiana . \ ' re 0, , _Jr.-, , .........,__\•,.•, ,,___ k_-- , , A„..-‘- PROPOSED BUILDING ....A.----7 . A„---\----;‘,.‘,..e• \_...\------1', • __A...--\--' % ... 11 •',9, \\ - - 1 -\-- -..- • .:\---k- •, -" -\--I- A.---\---,, • _ 1,022,055 S.F. ‘. ',_---‘--7, ' \-----V • A.---\- s, • ...-- .. : I 8 , / EXISTING LEGEND 1 \ .... S,\ ,A___.3,----kr ,,,-,l'A.-1T---, \_-\---, , ,..1,---'c. , v--- , \___3I--- ,, • ___k----\;• , \--\:- • . -% ..:-..,-----a,•- ihr i • "°"" s °•--- . :•...-4,•:7- i ,„. - N , ,\._,-.A--- A.-\-\---\_\---t--, _ __A----\-14._\-A7---,,.v---\:--k, ,3,---\--\- • __-• :-- "e"--ititi...710-1 - -- :,°.•.' »•:„-r.'',:,,7:7:47.,... I S• ,--r" -,- ' --V- ' _.-\,-, . ..1-- . ' ..----\- . L__.\---,, . ...:,...--7- ..., '''' -:•-•/ III . ,„. 034, . t• ' "-3,---A- • _L -A- A-- \ , _1,--\- , \ }- , . .0.0011111111=4011\ . .. 5.• 0-'4:-.-'. ' -\---,- , \T.-4-- , 'L._...-- , ‘, _...\ .----`;.---, ' ..\--- ',..., , tar"E s .,,T,.,„ \ \ --- T.,.' ‘ \--A-- ' .--\---", • ..\.---T . ' ---T- ‘, ' It----\-- • '.,- 2.....- i Ili --- , .. , 11111r- ••;-Tri .:,\. -A---, 3c...-.k..--A _A____k--\ ,k___ k__A-- __\., .._,,_-\-,---, 1•01----•._ wokillikrioro, 0 ,:,,,i,_,.....„--,;_g;,,I,',;:::;,,,, vity :,. /1, ,,, ,,- t• KIDE10504 •Z, Ii i ' % :"\----\-.-.- . _,-‘ ---\-- '... ' _--\---, • '.\-- .- ', .0 _.,.. *NI--Tr...... 0,110 --“.t.rfi-V.:\'`.\''''‘.'11 'i:1-.-. i , / ' .'41/4.4"XS ‘ 1.11 o , 1-0 4.A k0''0-V'",,-,-.1,-..1.!.,,•-w a1,'':,.....-110-41,-.,1$i1-';'2,1.-0---,--\--'-" •-'..-,-,1-,'-.. s%.......c-ZE.I..'.a eT-CL,r-,-1`"•,•-••;•,:-•0..:•,-',?—-,::.1,-±,.,--w.'-1:"r.'',‘"3-'',7'3:.7.:1.\.-:..,'-''.;-,-,;'4;; .:-t.`',3-:':`,,.'".t.1-:1-:.:-.:-:-::-..-'..-i..t:.........•.'.'.'.'.'I :. UTUTY LEGE N D IN/162 2C.SEIURATNIPC.IEE iDINi SDi9EY „ 01 S aX ,--- , k•L .. 1,...0.--,,ok . _.--- ------ -..... ....-• ---- ,,,i 0. 0', L' ----- a. .-.-::.=--------- .....-::-.-:--.-5.-- i.••••;if .. PROJECT PHASE. CONSTRUCTION SET N ,..gli Vilk,,,_._------m/e001.4 - - . Ilk .....,....a47.-4r.--.-,44,iii,„„ rir-.)-;,;.,„,,.. ..,;,'._0-::•,,,,.---, -1-iiip ‘ :7 ..._...... ... ..,. ii ,.. ...... 13 . — 0 WM WO•IT ....11 na!Mown w,now. REVISION SCHEDULE NO. DESCRIPTION DATE ....... Ne...... L............. 1,13,3311 , __ • ...- 0, - -,-...1 n•_ -----,r!rt","?"'!'-----""-____`:-.4.P.5.7.. • ',..\ 1 .:-...L...----,_-___:-_---4, '' I t -•'•''''''' ---._.—..,.4 i ifs i g■ra re k _ _ _ , --—---. — .100313,GA1"Mal ' PrAtITM:13=dir='"*CC0619INAC% i ---- - - ',. ,,,01,"......113M'W.,,,. .,,W.grartirginJ•11. 1711.1=7=IIMMirill...J.......OK.., _ ,,,.,,,..,,. -..-----.......:,,,,.. r ...,,-,,,,, FV11.4114?..1 -'in.,,o,,,..„.;,'.."' ,' / ,... .'O. s awn UTILITY CONTACTS Project Number 2021.1162 coven CORM MK Me /•ii5!i5-' /Z', ". ,'' ..-0.i...... .,,,,,,.,,,, ,.,t..t,,P,.,.a,. WC.../.... ((NM.M.M)II...4e.714... W•i 9.n"em.."..1e •w11"e,.'m.",',o.CAUTIONw o10 Toe1 .,, OVERALL UTILITY TIL ITY/ PLAN I' 2 . w. • .. I 4 Nn C400 0 AMERICAN STRUCTUREPOINT, INC. Owner Acknowledgement Agreement ("Agreement") For good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the undersigned owner ("Owner") hereby submits this Operation and Maintenance Manual ("Manual") to City of Jeffersonville, Indiana ("City") as written acknowledgement of Owner's warranty and agreement to institute, maintain, and follow the water quality Best Management Practices ("BMPs") listed below, and to follow and abide by the inspection schedule and maintenance activities listed in this Manual. The Owner also hereby agrees to provide, at Owner's cost, all additional maintenance, repair and/or replacement services reasonably necessary to maintain the function and longevity of the BMPs from and including the date this Agreement is executed by Owner to and including the date on which a new Agreement is filed with the City by another party who assumes all of the obligations and responsibilities of Owner as set forth herein. BMPs: Dry Detention Ponds Owner Signature Date Printed Name Company STATE OF ) SS: COUNTY OF ) BEFORE ME, the undersigned a Notary Public in and for said County and State, personally appeared , Owner, subscribed and sworn before this day of County of Residence Commission Expiration Date Signature Printed Name