HomeMy WebLinkAboutHolmans Crossing Multi-Family Development 202320924 MISC $25.00
11/15/2023 11:31:00A 6 PGS
Steve Gill
Clark County Recorder IN
Recorded as Presented
COMMERCIAL/INDUSTRIAL DEVELOPMEN i II II II II II III I III III NI
STORMWATER LONG-TERM OPERATION AND MAINTENANCE AGREEMENT
File No:_LTMA.Holmans Crossing.8.28.23 Parcel ID: 10-21-02-100-330.00-009
As accepted through SWQMP No: PW22-0017 9.30.22
Project Name:_Holmans Crossing Multi-Family Development
Primary function or description of activities to be executed at the site:
60 Multi-Family units on 4.703 acres
Stormwater Pollution Prevention Plan - Post Construction Component
(Section C)
C1 - Description of pollutants and their sources associated with the proposed land use
Post construction pollutants are expected to be pollutants consistent with that of a industrial area ( i.e.,
motor
oil. gasoline spills, engine coolant, and other hydrocarbons, lawn chemicals, detergent, and trash/litter).
C2 - Description of proposed post-construction stormwater measures
Pollution control of hydrocarbons and trash shall be provided with the use of a detention basin and
established
vegetation at the project site. Pre-development peak 2-year, 10-year, and 100-year discharge rates were
reduced
through the use of a detention basin. Pre-delvelopment and post-development peak discharge rates are:
Pre-development Post-development
2-yr= 1.74 cfs 2-yr= 1.03 cfs
10-yr= 2.36 cfs 10-yr= 1.21 cfs
100-yr = 3.58 cfs 100-yr= 1.58 cfs
C3 — Plan details for each stormwater measures
The proposed post-construction stormwater measures include a detention basin (see sheet C-301 and C-
501) and
established permanent vegetation.
C4 - Sequence describing stormwater measure implementation
A detention basin and established permanent vegetation will be used to control. pollutants
C5 - Maintenance guidelines for proposed post-construction stormwater measures
After completion of construction, the property owner will be responsible to maintain the established permanent
vegetation around perimeter of the site and within the stormwater basin. Promptly repair any small rills that
form.Add fertilizer and lime as needed to maintain healthy vegetation. Mow as needed but not shorter than
four inches.Where vegetation has actively trapped sediment or other pollutants, remove and properly dispose
of
the accumulated sediment/pollutants, regrade the area, and reseed when conditions are favorable for
vegetative
establishmen.t.
C6 - Entity that will be responsible for operation and maintenance of the post-construction
stormwater measures
Property Owner
This AGREEMENT, made and entered into this_28th day of August,of the year 2023, by and between
Holmans Crossing, LLC(hereinafter called the "OWNER") and the City of Jeffersonville, Indiana.
WITNESS,that
WHEREAS, Ordinance No. 2021-OR-14, was adopted April, 21, 2021, by the City of Jeffersonville
establishing requirements for storm water quality Best Management Practices(BMPs)and a Storm Water
Quality Management Permit (SWQMP) to manage the quality of storm water discharged from areas of
urban development and redevelopment.
WHEREAS, under said Ordinance, the City of Jeffersonville shall have the authority to inspect private
systems within the City of Jeffersonville and to order such corrective actions to said private storm water
management systems as are necessary to maintain properly the storm water management systems within
the City of Jeffersonville.
WHEREAS, under said Ordinance it is provided that storm water quality BMPs not owned municipally must
be maintained by the property owner according to the terms of Long-Term Operation and Maintenance
Agreement that must be implemented before a SWQMP is approved.
WHEREAS, the City of Jeffersonville has adopted and approved technical guidelines relating to storm
water quality best management practices in the City of Jeffersonville.
WHEREAS, the owner is the legal title-holder of certain real property, more particularly described as
A tt4:t of lend located in a Fats o1 Survey hi of the Illinois Ctact, for
rattitulat1P das.ribed as follows:
3egiraing at a point oa t e fort euterl7 lie of Survey #:1 of the MI:wit Grant,
said point berg located three hundred (3)0) feet north 4C' West of a ft a lccated
South 40. Past, 221.52 pelts, (three thousand ei.x hatched fifty:ive and o1 ht hundredths
(3,655.O8) feet) from the Myth corner of add Survey #21; thence South 5+3' est, for
e distance of Eight sundred fifty-sight mod forty-soren hundredths (3SB.4P) feet to a
paint oc the Easterly right of vsy line of the 8altiaore and Chia leilraadi thence ton-
,inuiag along said right of vsy tine, Earth le 33' d?.3n East, (grevioes teed North 18'
45' East) for a distance of one thogaend-six tad to tight hundredths (1,006.25) fast
cV poLit iA chs tariy Liao G€ sate'- stemy l211 t i es tooth 40' t-ast, albht
said Northsisterlf 1,ne, for a diasaace of .five hundred torat1-five (SWS) feet to the
Rlate of beginning, and coataisinc in said tract of land $.17 atzes, sore or leas,
as
recorded by deed in the land records of the City of Jeffersonville, in Deed Book at Page
(hereinafter called the "Property").
WHEREAS,the OWNER is proceeding to build on, develop or redevelop the property.
WHEREAS, the Stormwater Pollution Prevention Plan (SWPPP) and Long-Term Operation and
Maintenance Plan, sealed by Jason m. Copperwaite, PE. Paul Primavera & Associates, a licensed
Professional Engineer, dated 6/24/22, on file, the City of Jeffersonville, which is expressly made part
hereof, as approved or to be approved by the City of Jeffersonville, provided for storm water quality
management within the confines of the property.
WHEREAS,the City of Jeffersonville and the OWNER agree that the health, safety, and general welfare of
the residents of the City of Jeffersonville require that onsite storm water quality best management
practices be constructed, operated and maintained on the property.
WHEREAS, the City of Jeffersonville requires that onsite storm water facilities in accordance with the
Stormwater Pollution Prevention Plan (SWPPP) and Long-Term Operation and Maintenance Plan be
adequately designed, constructed, installed, operated and maintained by the OWNER.
WHEREAS, an approved Stormwater Pollution Prevention Plan and Long-Term Operation and
Maintenance Plan will adequately illustrate the location type and extent of storm water quality BMPs,
minimum inspection procedures and schedule, minimum operation procedures and schedule, and
anticipated minimum maintenance activities including when and how to remove
accumulated/collected/filtered/amassed/grown excess vegetation, sediment, debris, trash, pollutant
and/or forms of pollution from the storm water quality best management practices.
NOW THEREFORE,
In consideration of the foregoing premises, the mutual covenants contained herein, and the following
terms and condition,the parties hereto agree as follows:
1. The onsite storm water quality best management practices shall be constructed by the OWNER in
accordance with the SWPPP and Long-Term Operation and Maintenance Plan.
2. The OWNER shall operate and maintain the storm water quality BMPS as directed by the Long-
Term Operation and Maintenance Plan in good working order acceptable to the City of
Jeffersonvil►e for perpetuity.
3. The OWNER agrees that inspections will be performed by a Qualified Professional.
4. The OWNER agrees that inspections will be documented and include the following information:
A. A description of the current operational or functional status of the storm water quality
BMPs. For structures that accumulate sediment, trash, debris other pollutant or form of
pollution, an indication of used and remaining capacity (fraction, percentage, depth or
volume)shall be given to identify when the BMP must be cleaned out.
b. Identification of any necessary repairs, sediment/debris removal or replacement of all or
portions of the storm water system(s).
c. The results of any field or laboratory analyses performed.
d. Other relevant or unusual observations related to the system(s).
e. Action plan to prevent premature storm water system failure as consistent with the Long-
Term Operation and Maintenance Agreement(s) provisions.
f. Action plan to prevent the premature system failure that exceeds the Long-Term
Operation and Maintenance Agreement(s) provisions,but are necessary to prevent storm
water pollution from leaving the site.
5. The OWNER hereby grants permission to the City of Jeffersonville, its authorized agents and
employees to enter the property to inspect the storm water quality best management practices
whenever it deems necessary. Whenever possible, the City of Jeffersonville shall notify the
OWNER prior to entering the property.
6. In the event the OWNER fails to maintain storm water quality best management practices in
accordance with the SWPPP and Long-Term Operation and Maintenance Plan in good working
order acceptable to the City of Jeffersonville,the City of Jeffersonville may enter the property and
take whatever steps it deems necessary to repair or maintain said storm water quality best
management practices. This provision shall not be construed to allow the City of Jeffersonville to
erect any structure of a permanent nature on the land of the OWNER without first obtaining
written approval of the OWNER. It is expressly understood and agreed that the City of
Jeffersonville in under no obligation to maintain or repair said facilities, and in no event shall this
Agreement be construed to impose any such obligation on the City of Jeffersonville.
7. In the event the City of Jeffersonville, pursuant to this Agreement, performs work of any nature,
or expends any funds in performance of said work for labor,use of equipment,supplies, materials,
and the like, the OWNER shall reimburse the City of Jeffersonville upon demand, within ninety
(90) days of receipt thereof for all costs incurred by the City of Jeffersonville hereunder. In the
event,the OWNER does not reimburse the City of Jeffersonville within ninety(90)days of receipt;
the City of Jeffersonville may apply a lien upon the property for double the expense to the City of
Jeffersonville. In the event that the OWNER does not reimburse the City of Jeffersonville within
one year from the application of a lien upon the property then the City of Jeffersonville may take
other legal measures to recover costs, including associated legal costs, incurred by the City of
Jeffersonville.
8. It is the intent of this Agreement to guarantee the proper maintenance of onsite storm water
quality best management practices by the OWNER; provided, however,that this Agreement shall
not be deemed to create or affect any additional liability of any party for damage alleged to result
from or be caused by storm water management practices.
9. The OWNER, its executors, administrators, assigns, and any other successors in interest, shall
indemnify and hold the City of Jeffersonville and its agents and employees harmless for any and
all damages, accident, casualties, occurrences, or claims which might arise or be asserted against
the City of Jeffersonville from the construction, presence,existence, operation or maintenance of
the storm water quality best management practices by the OWNER or the City of Jeffersonville.
10. In the event a claim is asserted against the City of Jeffersonville, its agents, or employees for the
construction, presence, existence, operation or maintenance of the storm water quality best
management practices by the OWNER, the City of Jeffersonville shall notify the OWNER and the
OWNER shall defend at its own expense any suit based on such claim. If any judgment or claims
against the City of Jeffersonville, its agents, or employees shall be allowed, the OWNER shall pay
all costs and expenses in connection therewith.
11. This Agreement as attached by the SWPPP and Long-Term Operation and Maintenance Plan shall
be recorded among the land records of the City of Jeffersonville, and shall constitute a covenant
running with the land, and shall be binding on the OWNER, its administrators, executors, assigns,
heirs, and any other successors in interest.
12. This Agreement as attached by the SWPPP and Long-Term Operation and Maintenance Plan shall
be recorded among the real property title documents for said property, and shall constitute a
covenant running with the land,and shall be binding on the OWNER, its administrators,executors,
assigns, heirs, and any other successors in interest.
WITNESS the following signatures and seals:
City of Jeffersonville, Indiana
By Steve Gill SABRINA CORBIN
Drainage Board, Chair .�ti►� PGe�' Notary Public, State of Indiana
°s;SEAL;n- Clark County
gar••• t; Commission Number NP0743347
ATTEST: °'��",°; •
My Commission August 29,2030 Expires
M
CN f (NC" C 0r , a Notary Public in and for the City of Jeffersonville and
State of aforesaid, whose commis ion expires on the ,01 day of ��^�l tit of the
year ZuS� ,do certify that _ t9 ;IC G whose names are signed to
the foregoing Agreement bearing date of the C, day of 5 e o r , of the
year).i ,have acknowledged the same before me in my said City of Jeffersonville and State aforesaid.
GIVEN under my hand this 6 day of - 0+e n. , of the year Lo23.
(J2_
Notary Public
Prepared by:
Owner of Property
By x/1f,,e4
Owner, as Described on Page 1 of the Document
ATTEST:
I C-r-i V\.1t C-(.L Sr , a Notary Public in and pr the City of Jeffersonville and
State of aforesaid, whose commission expires on (o lay of U S� of the
year 202 -,do certify that )", V �—'" -CA he ZU I�� hose names are signed to
the foregoing Agreement bearing date of the 3, s: day bhp, 7e... •� , of the
year 2022,, have acknowledged the same before me in my said Ci4Vfl ��I A lie and State aforesaid.
GIVEN under my hand this �1 S day of �U ST=� ''�,(51 Xe C) -0��
J
-.. .0
°� SEAL -
Notary Public 2.-.,, c----ac„,,—
,,, a- �isj. UBL\c'..' Q. `�:,�
P
nQt. Tc�O F I Np\ \\��qo.
ftl+�ittljiti1110
"I affirm under the penalties for perjury, that I have taken reasonable c to redact each Social Security
number in this document, unless required by law."
&4...i_s_jfr)7,________
Signature