Loading...
HomeMy WebLinkAboutStrand Associates (Use Attainability Analysis -Cane Run and the Ohio River) City of Jeffersonville Government Contract Coversheet Please note: All information MUST be completely filled out and submitted to Clerk's Office within 48 hrs of execution. Date Submitted to Clerk: 4/5/2024 Department: Wastewater Vendor Name: Strand Associates Sign Date: 4/4/2024 Ending Date: 12/31/2024 Amount of Original Contract: $100,000 Is this an amendment or change order to original contract? Amended Contract Amount: Purpose: Assist Wastewater Department in the preparation of a Use Attainability Analysis for the change in the designated use of Cane Run and the Ohio River. For Clerk's Office to fill out Date uploaded to Gateway: ,V/'/�U.=0 �. Strand Associates, Inc. 325 West Main Street, Suite 710 Louisville, KY 40202 � (P)502.583.7020 STRAND www.strand.com ASSOCIATES' Excellence in Engineering'""' Task Order No. 24-02 City of Jeffersonville, Indiana(OWNER) and Strand Associates, Inc.®(ENGINEER) Pursuant to Agreement for Technical Services dated January 20, 2022 Project Information • Services Name: Use Attainability Analysis(UAA) Preparation for Cane Run Creek and Ohio River Services Description: ENGINEER will prepare a UAA in accordance with Indiana Department of Environmental Management (IDEM) and United States Environmental Protection Agency (USEPA) guidance. OWNER intends to submit the UAA in accordance with its approved Combined Sewer Overflow (CSO) Long-Term Control Plan (LTCP) to IDEM for approval. If a UAA is required for the Ohio River, additional submittals will be required for the Ohio River Valley Water Sanitation Commission (ORSANCO) and Kentucky Division of Water(KDOW). Scope of Services ENGINEER will provide the following services to OWNER: l. Attend one project kickoff meeting with OWNER. 2. Attend up to three meetings with OWNER and IDEM to discuss the change in use for Cane Run Creek and need for a UAA for the Ohio River. 3. Attend up to one meeting with OWNER and ORSANCO to discuss the need for a UAA on the Ohio River. 4. Attend up to one meeting with OWNER and KDOW to discuss the need for a UAA on the Ohio River. 5. Review existing water quality data including the Stream Reach Characterization Evaluation and Report previously completed by OWNER and publicly available water quality sampling of Cane Run Creek and Ohio River. Provide request for additional water quality data collection needs to OWNER. OWNER shall provide additional water quality data collection and analysis. 6. Provide a narrative discussion regarding existing land use in Cane Run Creek. Discuss attainment of exiting water quality criteria in Cane Run Creek and the potential factors preventing attainment of the currently designated use. 7. Provide a narrative discussion regarding existing land use along the Ohio River. Discuss attainment of exiting water quality criteria in Ohio River and the factors preventing attainment of the currently designated use. 8. Prepare a desktop water quality model of the Ohio River to analyze the time and duration of the Wet Weather Limited Use classification in accordance with IDEM policy. JDII chn TOIN)owmansUgcel,c 'J4etTasonville,City d(INMIS 2022fl0\2024\5444047 2402 doer Arizona I Illinois I Indiana I Iowa I Kentucky I Ohio I Tennessee I Texas I Wisconsin Strand Associates, Inc.`' City of Jeffersonville Task Order No. 24-02 Page 2 March 5,2024 9. Assist OWNER with conducting a public information meeting to present the UAA findings. 10. Prepare a report summarizing the UAA findings for Cane Run Creek and submit the report to IDEM and USEPA. The UAA is anticipated to recommend the Cane Run Creek designated use be changed to a Limited Use Stream subcategory. The UAA may use Factor 2 (natural ephemeral, intermittent, or low flow levels prevent attainment of use), Factor 3 (human caused conditions or sources of pollution prevent the attainment of the use and cannot be remedied or would cause more environmental damage to correct than to leave in place), Factor 4 (dams, diversions, or hydrological modifications preclude attainment of use), and/or Factor 6(controls more stringent would result in substantial and widespread economic and social impact). The report will incorporate past and current Financial Capability Assessment. 11. Prepare a report summarizing the UAA findings for the Ohio River and submit the report to OWNER, IDEM,ORSANCO, KDOW,and USEPA.The UAA is anticipated to recommend the Ohio River in proximity to OWNER's CSOs designated use be changed to CSO Limited Wet Weather Use subcategory during and after combined sewer overflow events. The UAA may use Factor 3 (human caused conditions or sources of pollution prevent the attainment of the use and cannot be remedied or would cause more environmental damage to correct than to leave in place), Factor 4 (dams, diversions, or hydrological modifications preclude attainment of use), and/or Factor 6(controls more stringent would result in substantial and widespread economic and social impact). Report will incorporate past and current Financial Capability Assessment. 12. Respond to comments from OWNER, IDEM,ORSANCO, KDOW,and USEPA. Compensation OWNER shall compensate ENGINEER for Services under this Task Order on an hourly rate basis plus expenses an estimated fee of$100,000. Schedule Services will begin upon execution of this Task Order, which is anticipated the week of March 4, 2024. Services are scheduled for completion on June 30,2025. TASK ORDER AUTHORIZATION AND ACCEPTANCE: ENGINEER: OWNER: STRAND ASSOCIATES, INC.4" CITY OF J .F ERSONV LE Aff 3 s J ph . Bunker )ate Michael pore Date Corporate Secretary Mayor JDII elm\R VA(Nkxiuncnn,Agi.cmauslNeOesanville,City of(INI\ATS 2022\TO\2024\5944047.24-02 duez www.strand.com