Date Submitted to Clerk: 1/22/2024
Department: Wastewater
Vendor Name: Jacobi, Toombs & Lanz, Inc. (JTL)
Sign Date: 1/18/2024
Ending Date: 6/30/2024
Amount of Original Contract: $49,500
Is this an amendment or change order
to original contract?
Amended Contract Amount:
Purpose:
Engineering Design of the Force Main
Replacement from the Power House Lift
Station.
For Clerk's Office to fill out
Date uploaded to Gateway:
ATTACHMENT B: WORK ORDER FORM
WORK ORDER NO. 2024-2
POWERHOUSE FORCE MAIN REPLACEMENT
SURVEYING, DESIGN,/A�AND BIDDING
Date: 1(/ii3/ 47Z41—
In accordance with the General Services Agreement between the City of Jeffersonville, Indiana, acting
thru its duly appointed Sewer Board (OWNER). and Jacobi, Toombs and Lanz, Inc. (CONSULTANT),
dated 04/01/2010, this WORK ORDER is the written authorization to the CONSULTANT to provide the
work described herein, in accordance with the attached schedule, and fees
Work: The Work shall be as described in Section A of this Work Order. CONSULTANT shall furnish all
labor, materials, supplies. equipment, supervision and services necessary for and incident to the
performance of the Work. CONSULTANT represents that it has thoroughly reviewed the Work and the
General Services Agreement and that it accepts the Work and the conditions under which the Work is to
be performed.
Schedule: The Schedule shall be set forth in Section B of this Work Order. CONSULTANT represents
that the Schedule is reasonable and achievable.
Payment Terms: Payments to the CONSULTANT shall be as described in Section C of this Work Order.
Terms and Conditions. The terms and conditions of the General Services Agreement referenced above
shall apply to this Work Order. This Work Order also incorporates, in Section D. all the terms and
conditions required to be included in it by the General Services Agreement.
OWNER: CONSULTANT:
Jeffersonville Sewer Board Jacobi, Toombs, and Lanz, Inc.
Jeffersonville, Indiana 1829 E. Spring Street
500 Quartermaster Court New Albany, IN 47150
Jeffersonville, Indiana 30 (812) 945-9585
(812) 285-6400
I1EEEttt'` G . eta-�i;r
By v 2 y Michael C.Harris(Jan 12,2024 08-37 EST)
Mayor Mike oore, President Michael C. Harris, P.E., President
By Witness.,1 bard,
osh Darby(Jan 12,2D24 08:39 EST)
Dale L. Orem, Member Josh Darby, P.E., Construction Services
Team Leader
By William A.A. Saegesse , ., P.L.S., Member
Y:\Shared\JTL\Projects\Archive\New Albany\87o8S-Jeffersonville General Sewers\87o8S-2o1o\2024-2 Powerhouse Force Main Replacement.doc
1
WORK ORDER NO. 2024-2
SECTION A — DESCRIPTION OF THE WORK
Jacobi, Toombs and Lanz, Inc. (JTL) shall provide Professional Engineering services for the project
described as follows:
• Topographic Survey
JTL will perform topographic surveying within the project corridor. described as follows, to identify
existing terrain and utilities as marked in the field. JTL will also research and resolve existing
right-of-way and property lines. The deliverable will be in AutoCAD format to be used for
Engineering Design. The project corridor is along 12th Street from the Powerhouse Lift Station
(approximately 260' west of French Street) to the Camp Powers Lift Station (just east of Main
Street). The pump station sites will also be surveyed. The project corridor is estimated to be
approximately 2,000' in length and 60' in width.
• Easement Plats and Descriptions
It is a possibility that the alignment of the new force main may extend outside of the existing right-
of-way of 12th Street. Should that be the case, and upon authorization by the OWNER, JTL will
provide preparation of up to six (6) easement plats and legal descriptions required for acquisition.
The deliverable will be in PDF format.
• Geotechnical Investigation
JTL will retain the services of a Licensed Professional Geotechnical Engineer to investigate and
provide a report on the findings of their subsurface investigation. Borings will be provided in
1,000' intervals and intermediate soundings will be provided at 500' intervals.
• Design —Construction Plans
JTL will design and provide construction plans for the replacement of the Powerhouse force main
along 12th Street as described in the project corridor descriptions above, meeting City and
Wastewater Construction Standards. Per information provided. a 1,950' length of 6" diameter
cast iron pipe force main sewer will be replaced along the north side of 12'h Street. This pipe is
assumed to be less than 6' deep. It is our understanding that the existing force main is in very
close proximity to the existing gravity sewer, even crossing through one of the gravity sewer
manholes. Therefore, it is the OWNER's desire to shift the alignment of the force main away from
the gravity sewer. The pipe will be replaced at the same diameter as the existing force main.
• Specifications and Bidding
JTL will prepare technical specifications and a bid request package to accompany the
construction plans. The construction cost is estimated to be more than $150,000, so the public
bidding process will be required. JTL will assist the Owner with solicitation of bids, answering
Contractor's questions during bidding. bid opening and recommendation to the Owner for award.
The following Scope of Services are Not Included in this Work Order Agreement:
• Appraising and Buying Services
Since the need for easements and the type of appraisals are unknown at this point, appraising
services are not included in this work order. A contract for appraising services will be submitted
by the Appraiser at a later date once design is completed and the need and type of appraisal is
known. A separate contract will also be submitted at a later date by the Buyer for Acquisition
Services.
• Permitting
Since the force main is being proposed to be replaced in kind, with minimal shift in alignment, a
Sewer Construction permit is not required.
• Construction Administration/Inspection
Construction Administration and Inspection Services are not included in the scope of this
agreement and can be added, if requested, by separate contract at a later date.
Y:\Shared\J'PL\Projects\Archive\New Albany\87o8S-Jeffersonville General Sewers\87o8S-2oto\2o24-2 Powerhouse Force Main Replacement.doe
2
SECTION B — SCHEDULE
JTL will begin work upon receipt of signed work order agreement. The project will be complete and ready
for bid within 90 days of the signed work order.
SECTION C — PAYMENT TERMS
Payment to the CONSULTANT shall be on a lump sum basis for a sum of $49,500. A breakdown of the
tasks/fees are as follows:
• Topographic Survey - $15,000
• Geotechnical Investigation - $7,000
• Design—Construction Plans - $21,000
• Specifications and Bidding - $6,500
Total - $49,500
If easement plats and descriptions are required, payment to the CONSULTANT shall be on a lump sum
basis for an additional amount of$1,500 per parcel.
The CONSULTANT may submit monthly invoices for payment for work completed to date.
Exceeding Estimated Fees: The estimated total fees shown herein are based on the description of work
described in this agreement. The CONSULTANT reserves the right to request an adjustment to the
estimated total fees. if necessary, as a result of scope changes or schedule adjustments that are outside
the CONSULTANT'S control.
Y:\Shared\JTL\Projects\Archive\New Albany\87o8S-Jeffersonville General Sewers\87o8S-2o to\2024-2 Powerhouse Force Main Replacement.doc
3