HomeMy WebLinkAboutLibs Paving CO., LLC City of Jeffersonville
Government Contract Coversheet
Please note: All information MUST be completely filled out and submitted to Clerk's Office
within 48 hrs of execution.
Date Submitted to Clerk: 7/12/2023
Department: Motor Vehicle (Street)
Vendor Name: Libs Paving Co., Inc.
Sign Date: 7/12/2023
Ending Date: 12/23/2023
Amount of Original Contract: not to exceed $116,280.00
Is this an amendment or change order
to original contract? No
Amended Contract Amount:
Purpose: Repair, level, and pave City Compound at 2001/2003
Renfroe Way, including new area.
For Clerk's Office to fill out
Date uploaded to Gateway:
( LIBS
PAVING CO., INC.
6931 Atkins Road, Floyds Knobs, Indiana
Office:812-944-8942
8/9/2022 QT-9222
Project Info:
Andy Crouch City of Jeffersonville
(502)553-8822 Jeffersonville Road Dept Parking lot
City of Jeffersonville 500 Quartermaster Court Ste 151 15 Renfroe Way Jeffersonville, IN
Jefersonville IN 47130 United States
Rep: Kyle Pfeiffer
We are happy to present to you the following proposal for work to be performed.
If you have any questions,please do not hesitate to contact us.Thank youl
Resurface and new construction paving (additional concrete pad and patching)
1. The area under consideration for new asphalt surface comprises approx.66,150 square feet.
2. In order to make sure that new surface meets existing surfaces flush, we will mill existing pavement
where it meets concrete aprons, walkways, entrances, etc.to create the smoothest transition possible.
3. All surfaces to be paved will be cleaned of loose materials.
4. Parking Blocks:This proposal includes the setting aside and replacing parking blocks/chalks.We will do
everything possible not to damage any parking block, however if they are currently damaged moving
them will cause possible future damage, of which will be an additional charge.
5. In order to make sure that the new surface meets existing surfaces flush, we will raise existing utility lids
as needed to create the smoothest transition possible.
6. Apply tack coat.
7. PrePave Leveling: Our firm will level low and depressed areas by installing asphalt as needed to level
the surface.This is a very important process that will enable minimization of standing water.
8. Our firm will machine install 1.5 inches of compacted surface asphalt with vibratory steel drum roller.
9. Depth of Asphalt Note -All work we specify is the final depth, not the depth prior to compaction.This
important to note.
10. Our firm will layout and stripe per existing layout.
11. We will form and pour concrete pad approx. 17x12.
12. We will perform patching based on limits marked in field by engineer and city to a depth of 4" Remove
and Replace.
13. Barricading All areas will be barricaded during and after all work as needed.
Total Price for this Service:$116,280.00
LIB*Proposal: City of Jeffersonville
-u-?8. T i !R Y yn .. . 4 k ,, _ �3 -. ys[ _ 14 •r-_, i't _q , t5.
s. w^ 5; 4`.^n V 3-_, -..r a £ t„s,g a r 1 'AG rbf' , ,.; ,ma ;; '+.,,:.
°a• .,y'• '', 4 Y .° Fes "
e ,7 '[73t o x 5 Sty_t# x Ty w
fro+ zs !� �4 .4, ,a ,= s ! -; k 4 - �. « ,r.
' •' ' � � AY.K t fL"F f � � fix_ J�
�� •y, ;,,. � ��� �' u',
� .,aY�• .� ..I -•• � ..�f c- ^�.`•" 'sox.`
� 3 At �'^: k� ''fit :`�
i�' t j( .. `gip
�' is
-
`r !S3.�St ti•,?'"R'. «-':'4',.'W.'40
7` Si'
3`a�rtvas {} y tx 4 S Y- °t §
s r .,!:-.,:.,--;,_!"-:..if.
} ,,S ,�.,:A1 ?= 3 1, ., y+r` ^ a a :y j _ - awn--,.
X-3tic${t?
_,_. `'*.'''' ,v ',4 '-5_. 'E -rA:.. �a ark'.
LI B
Price Breakdown: City of Jeffersonville """'O °"
Contract Payment Terms and Conditions
1. Warranty: We guarantee all work against defects in materials and workmanship for a period of(1) year from date of
installation.We do not guarantee against puddling where existing slope is less than 2%.We do not guarantee against
reflective cracking and dry weather cracking.
2. Exclusions: Survey layout, traffic loops, permits, fees, testing, underground locates of utilities on private property,
adjustment or relocation of existing utilities,scale or predetermined wage.
3. 'Price based on current price of liquid asphalt. if price of liquid asphalt changes,we reserve the right to change
our price accordingly.
4. The following terms and conditions are between Libs Paving Company, Inc.
(aka the contractor)and the person,company,or agent who executes the proposal(aka the customer).
5. The customer agrees to pay the contractor within the specified time period designated in the proposal.Any amounts past
due, after 30 days from the invoice date, are subject to a 1.5% per month late charge. By signing this contract, the
customer acknowledges this charge may be incurred.If full payment, including late charge, have not been received within
60 days, the account will be turned over to a collection agency.At this point, the customer agrees to pay for all collection
fees(attorney costs,court costs,any other collection cost incurred by the contractor).
6. The contractor will provide price protection,for this proposal,for 30 days from the date on the proposal.
7. The contractor will typically arrive to the project site no later than 7:00 am, unless otherwise discussed with customer.It is
the responsibility of the customer to notify tenants, postal service,garbage service, landscapers,etc.of the proposed work
dates and times,The contractor recommends that a towing service be on-site, or on stand-by, to relocate any vehicles in
the work area at start time.Should the contractor be delayed more than 1 hour, additional fees may be incurred for down
time.The customer is required to contact all service providers in the event that the work is re-scheduled.
8. Sprinklers should be off 24 hours prior and 24 hours after service.Avoid lawn cutting during this same period of time.
9. While performing the contracted work, if the contractor encounters"soft"sub base material, the contractor will notify the
customer of the issue encountered and provide an estimated cost of repairs. If the customer declines the corrective work
and directs the contractor to proceed with original scope of work, the contractor shall not be held responsible for the
structural integrity of that area and the warranty will be voided.
10. If unsuitable or hazardous materials are encountered and deemed by contractor undeliverable to contracted waste facility,
the materials will be transported to the proper waste facility.The customer agrees to pay for any additional dump fee and
trucking costs.
11. When paving handicap parking areas and ramps, the contractor will pave per existing elevations and conditions, unless
otherwise specified in the proposal.
12. The contractor will not be responsible for any standing water in areas with fixed structures, or where the existing slope is
less than 2%.
13. Libs Paving will only replace existing speed bumps,or install new speed bumps if specified in the proposal.
14. The contractor will not be responsible for any damages to new asphalt, concrete,or sealcoating which may be caused by
footprints,graffiti,tire tracks,or loads in excess of design capacity.
15. The contractor will not be responsible for any delays in construction due to weather, natural disasters, delays in
transportation,fuel or raw material shortage,plant failures,or any other circumstance that is out of our control.
16. Work specified in the proposal requires the use of heavy trucks and equipment.The contractor will not be held responsible
for repair or replacement of existing structures or utilities damaged by heavy equipment necessary to complete the job.
17. When driving on your newly paved or sealed surface, the contractor encourages the customer to keep their vehicle(s)in
motion when turning their wheels."Scuffing"and"turn marks"are not considered warranty work.These marks will blend in
time with the rest of the surface.
18. When re-painting existing parking bumpers or concrete curbing, we recommend hydro/sand blasting prior to re-painting.
This is the only way to ensure proper bonding and to prevent"flaking".
19. The contractor will re-stripe parking lots per existing layout unless specified in the proposal.
20. Where applicable-"Alligator"or"spider web"areas or areas of failed asphalt will not receive crack filler.
LIBS
Price Breakdown: City of Jeffersonville '"""'°
Please find the following breakdown of all services we have provided in this proposal.This proposal originated on
8/9/2022.Quote Number:QT-9222
Item Description
1 Resurface and new construction paving (additional concrete pad and $116,280.00
patching)
Total: $116,280.00
Authorization to Proceed & Contract
1.By Signing I agree to all contract terms&conditions and scope of work outlined in this proposal.
2. I understand that if any additional work is required different than stated in this proposal/contract there will be
additional charges.
7/VP V a614P3
{
'..N.411
cr
v 1\-) _
fJ >cz .
Andy Crouch Kyle Pfeiffer
City of Jeffersonville kyle@libspaving.com
City of Jeffersonville 500 Quartermaster Court Ste C:(502)807-7795
151 Jefersonville IN 47130 United States Libs Paving Company, Inc.
acrouch@cityofjeff.net 6931 Atkins Road
C: (502) 553-8822 Floyds Knobs, IN 47119
P:812-944-8942
F:812-949-2806
http://www.libspaving.com