Loading...
HomeMy WebLinkAboutCITY/COUNTY REIMBURSMENT AGREEMENT CITY/COUNTY UTILITY REIMBURSEMENT AGREEMENT (Work by Utility) Agreement Amount $281,694.75 Des No. 1702787 Agreement Type Standard Project No. 1702787 Work Description Relocate sanitary sewer Road Bethany facilities in conflict with project County Clark THIS AGREEMENT, made and entered into this day of 20 , by and between City of Jeffersonville Wastewater Department 423 Lewman Way Jeffersonville, IN 47130 (hereinafter referred to as the "Utility"), and Clark County Indiana acting by and through its appropriate elected official, (hereinafter referred to as the "Local Public Agency"). WITNESSETH: WHEREAS, the Local Public Agency desires to improve and/or maintain the condition of the above referenced road and has determined that the construction designated by the above project number (hereinafter referred to as the "project") is necessary for the improvement and/or maintenance of the roadway; WHEREAS, the State of Indiana, through the Indiana Department of Transportation, (hereinafter referred to as "State") has agreed to recommend approval of this project to the Federal Highway Administration for construction with funds apportioned to the State under Title 23, United States Code and Acts amendatory thereof and supplementary thereto; WHEREAS, the State will advertise for bids for construction of the project, award the contract, supervise the construction of the project and act as liaison agent for the Local Public Agency with the Federal Highway Administration; WHEREAS, the project will require certain adjustments, removals, alterations and/or relocations of the existing facilities of the Utility will have to be made as shown on the plan marked Exhibit "A", attached hereto and incorporated by reference; Page 1 of 9 WHEREAS, it is necessary for the parties hereto to comply with the applicable terms and provisions of the Federal-Aid Policy Guide (hereinafter called the Policy Guide), dated December 9, 1991, and 23 CFR 645 Subpart A, incorporated by reference, in order to receive reimbursement for the costs of the adjustments, removals, alterations and/or relocations of the existing facilities of the Utility; WHEREAS, it is in the best interests of the Utility and the Local Public Agency, for the Utility to make the necessary adjustments, removals, alterations and/or relocations of its existing facilities as shown on Exhibit "A" with the Utility's regular construction and maintenance forces, or by a contractor paid under a contract let by the Utility. NOW, THEREFORE, IN CONSIDERATION OF THE PREMISES AND THE MUTUAL AGREEMENTS AND COVENANT HEREIN CONTAINED (THE ADEQUACY OF WHICH CONSIDERATIONS AS TO EACH OF THE PARTIES TO THIS AGREEMENT IS HEREBY MUTUALLY ACKNOWLEDGED), AND OTHER GOOD AND VALUABLE CONSIDERATIONS, THE RECEIPT OF WHICH IS HEREBY ACKNOWLEDGED AND INTENDING TO BE LEGALLY BOUND, THE PARTIES HEREBY COVENANT AND AGREE AS FOLLOWS: SECTION I - DESCRIPTION OF WORK AND ITEMIZED COST ESTIMATE The Utility shall make the necessary adjustments, removals, alterations and/or relocations to its existing facilities in the following manner: [Circle (1) and/or (2)] (1) With its regular construction or maintenance crew and personnel at its standard schedule of wages and working hours. (2) By an approved contractor as set forth in 23 CFR 645.109, 645.111 and/or 645.115. The preliminary itemized cost estimate for this project is set forth in attached Exhibit "B", incorporated by reference, and prepared in accordance with 23 CFR 645.113. Exhibit "B" shall include an itemized estimate of all anticipated costs, including but not limited to, materials, labor, equipment costs, preliminary and construction engineering costs, administrative costs, eligible property costs, and or contracted services. Each item shall be shown as a 'per unit' cost. Professional services cannot be listed as a percentage of the total cost. SECTION II -WORK COMMENCEMENT The Utility shall not start work on the adjustments, removals, alterations and/or relocations covered by this agreement until written authorization has been given the Page 2 of 9 Utility by the Local Public Agency or until a satisfactory starting date has been established with the Local Public Agency's project coordinator. SECTION III -SUBORDINATION OF RIGHTS The existing facilities (are) (are not) located on public right-of-way. If such facilities are located on property, other than public right-of-way, and the Utility either has an easement thereon or a continuing right to maintain the facilities in that location, the Utility, for and in consideration of this agreement, shall subordinate the Utility's rights to those of the Local Public Agency in the highway right-of-way prior to final payment by executing an individual subordination agreement. SECTION IV - MATERIAL ALTERATIONS DUE TO CHANGED AND UNFORESEEN CIRCUMSTANCES The Utility shall modify its facilities in accordance with the plans, specifications, and estimates shown in Exhibits "A" and "B". No work shall be performed by the Utility beyond the scope contemplated by Exhibits "A" and "B" without prior written authorization by the Local Public Agency. In the event there are changes in the scope of work, extra work, or major change in the planned work covered by the approved agreement, plans, and estimate the Utility shall inform the Local Public Agency as soon as practical upon discovery. The Utility shall also notify the Local Public Agency of any material alterations due to unforeseen circumstances as soon as practical upon discovery. Such notification shall consist of a letter, telephone call, or other electronic communication confirmed by letter to the address of the Local Public Agency listed on Page 1 of this agreement Notification shall include sufficient information to indicate the nature of the changed or unforeseen circumstances, the location of the changed or unforeseen circumstances, and the impact of the changed or unforeseen circumstances upon the Utility's relocation efforts, cost of the relocation, the time necessary to complete the relocation, and the extent of relocation. SECTION V -STANDARD PAYMENT METHOD 1 PROGRESS BILLING The Utility may, once the Utility has accumulated $1,000.00 of expenses, submit one request for payment per calendar month for work covered by this agreement. The utility shall attach an itemization of costs incurred with each request for payment. This itemization of costs shall appear in the same form and manner as the preliminary estimate as shown on Exhibit"B" The Local Public Agency will reimburse the utility for any item of worth or expense involved if performed at the written direction of the Local Public Agency. The Utility will be reimbursed for its actual costs of the work described in Exhibit "A" upon presentation of itemized bills to the Local Public Agency from the Utility. Page 3 of 9 Progress payments made by the Local Public Agency to the Utility shall not exceed ninety-seven percent (97%) of the estimated cost of the completed work. Reimbursement for progress billings shall be paid within sixty (60) days of receipt. Partial payment shall not abrogate the Local Public Agency's or the State's right to dispute in good faith the Utility's claim for compensation. Such good faith disputes shall be resolved upon presentation of the Utility's final request for payment and the resolution of any audit performed in accordance with Section IX of this agreement. SECTION VI— LUMP SUM PAYMENT METHOD The Utility may elect to petition the Local Public Agency for payment of its expenses by Lump Sum. Such petition shall include Exhibits "A" and "B" along with a detailed explanation requesting payment by lump sum and showing how all individuals will be best served by this payment method. The Local Public Agency may make payment to the utility by lump sum if the total cost for the adjustments, removals, alterations, and/or relocations do not exceed $25,000.00. Lump sum payments in excess of $25,000 will be made only if in the best interests of the public in accordance with 23 CFR 645.113(f) and approved by the Federal Highway Administration. If a lump sum payment is approved, the Utility shall submit one request for payment no later than ninety (90) days after the work is completed. No amount in excess of the agreed amount in Exhibit "B" shall be reimbursed. SECTION VII - FINAL BILL The Utility shall present its final itemized bill accompanied by an itemized cumulative invoice within ninety (90)-days-of-completion-of-its-work. All documents required to substantiate any claims for payment shall be submitted with this final itemized bill. Such supporting documentation shall include, but shall not be limited to, copies of material invoices, time sheets, vendor and/or contractor invoices and other such documents as may be deemed by the State to support such invoice. Upon receipt of a final bill, the Utility shall be reimbursed for such items of project work, expense and retainage within ninety (90) days after the resolution and issuance of any audit performed in accordance with Section IX. SECTION VIII - RECORDS The Utility accounts and the accounts and records of any contractor or subcontractor involved in carrying out the proposed work shall be kept in such manner that they may be readily audited and actual costs determined, and such accounts shall be available for audit by auditors of the State, the Federal Highway Administration, and/or the Local Public Agency for a period of not less than three (3) years from the date final payment has been received by the Utility In accordance with 23 CFR 645.117. Page 4 of 9 Upon completion of the Utility's work, the Indiana Department of Transportation's Division of Accounting and Control may audit the Utility's records to determine the cost of relocation. Such audit shall be in accordance with generally accepted auditing standards and the appropriate cost principles as set forth in 48 CFR Part 31. If the audit resolution shows that the Utility has been overpaid, the Local Public Agency shall bill the Utility for such overpayment and provide supporting documentation. The Utility shall pay the Local Public Agency within thirty-five (35) days after receipt of such bill and the Local Public Agency shall remit the Federal share to the State. SECTION IX - DISCRIMINATION Pursuant to IC 22-9-1-10, the Utility, its Contractor and subcontractors, if any, shall not discriminate against any employee or applicant for employment, to be employed in the performance of this contract, with respect to hire, tenure, terms, conditions or privileges of employment or any matter directly or indirectly related to employment, because of race, color, religion, sex, disability, national origin or ancestry. Breach of this covenant may be regarded as a material breach of contract. The Utility shall comply with the Regulations relative to Nondiscrimination in federally-assisted programs of the Department of Transportation Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, incorporated by reference. SECTION X - GENERAL LIABILITY PROVISIONS The Utility for itself, its employees, agents and representatives, shall indemnify, protect and save harmless the Indiana Department of Transportation, the State of Indiana, and the Local Public Agency from and against any and all legal liabilities and other expenses, claims, costs, losses, suits or judgments for damages, or injuries to or death of persons or damage to or destruction of property (hereafter "Claim"), arising out of intentional tortious acts or whether due in whole or in part to the negligent acts or omissions of the Utility, its employees or agents or contractors, in relation to or in connection with any work performed or to be performed pursuant to this agreement, provided however, that where said Department of Transportation and/or the Local Public Agency his been found liable by a court, tribunal or governing body entitled to make such a determination for intentional tortious acts and/or negligence with respect to the occurrence or occurrences giving rise to the Claim, the Utility shall have no duty to indemnify, protect, or save harmless either the Department of Transportation, the State, or the Local Public Agency. SECTION XI - INCORPORATION OF THE UTILITY POLICY GUIDE The Policy Guide forms an essential part of this agreement, and the terms or provisions of this agreement in no way abrogate or supersede the terms or provisions set forth in said Policy Guide. Page 5 of 9 SECTION XII - PENALTIES/INTEREST/ATTORNEY'S FEES The Local Public Agency will in good faith perform its required obligations hereunder and does not agree to pay any penalties, liquidated damages, interest, and/or attorney's fees, except as required by Indiana law, in part, IC 5-17-5-1 at seq. SECTION XIII - GOVERNING LAWS This contract shall be construed in accordance with and governed by the laws of the State of Indiana and suit, if any, must be brought in the State of Indiana. SECTION XIV - BINDING UPON SUCCESSORS OR ASSIGNS This agreement shall be binding upon the parties and their successors and assigns. SECTION XV- NON-COLLUSION AFFIDAVIT The Utility shall execute a Non-Collusion Affidavit, notarized with a seal, which is attached hereto and incorporated by reference. If the Utility is a governmental entity, the execution of a Non-Collusion affidavit shall not be required. SECTION XVI - MAINTAINING A DRUG-FREE WORKPLACE (A) The Utility and its subcontractors, if any, covenant and agree to make a good faith effort to provide and maintain during the term of this agreement a drug-free workplace, and that written notice will be given to the contracting Local Public Agency and the Indiana Department of Administration within ten (10) days after receiving actual notice that an employee of the Utility has been convicted of a criminal drug violation occurring in the Utility's workplace. (B) In addition to the provisions of paragraph (A) above, if the total contract amount set forth in this agreement is in excess of $25,000.00, the Utility and its subcontractors, If any, hereby further agree that this agreement is expressly subject to the terms, conditions and representations contained in the Drug-Free Workplace certification executed by the Utility in conjunction with this agreement and which is appended as an attachment hereto. (C) It is further expressly agreed that the failure of the Utility and its subcontractors, if any, to in good faith comply with the terms of paragraph (A) above, or falsifying or otherwise violating the terms of the certification referenced in paragraph (B) above, shall constitute a material breach of this agreement, and shall entitle the State and the Local Public Agency to impose sanctions against the Utility and its subcontractors, if any, including, but not limited to, suspension of contract payments, termination of this agreement and/or debarment of the Utility and its subcontractors, if any, from doing business with the State and the Local Public Agency for up to three (3) years. Page 6 of 9 SECTION XVII— BUY AMERICA CERTIFICATION The Utility agrees that all steel and cast iron materials and products to be used under this agreement will be produced and manufactured in the United States of America pursuant to the requirements of Indiana Code 5-16-8-1, et al. and 23 CFR 635.410. The remainder of this page is intentionally left blank. Page 7 of 9 IN WITNESS HEREOF the parties hereto separately and severally have caused this instrument to be executed in their respective names by and through their duly authorized officers. THE UTLITY: ATTEST: el-/Vo ✓� Onv�l - lvJe ►� � f(UtilitNa! -) (Secretary of Utility-Signature) 4 a✓'�ti / (Signature if Officer) (Secretary's Name, Printed or Typed) s moo (- (Officer's Name, Printed or Typed) (Officer's Poi....9n) J ACKNOWLEDGEMENT dState of ((1 p ? County of C,1 .6. ( tom---- SS: Before me, the undersigned Notary Public in and for said Coun and State, personally appeared ( I2— /4o o(Q a ri d� r (Names and offices of signers of Utility) e11 o Jef rson v t!Le -- e6-4e l ✓' (Name of Utility) and acknowledged the execution of the foregoing contract on this day of t� 20 . Witness my hand and seal the said I-st day. 4, / My Commission Expires bir , 11.11 A, - ,� 4. 11 ( �.ture) Irl JnT75 6 i' (Seal) (Printed or Typed) (Notary Public) JOHNNA S.ANDERSON SEAL Notary Public-State of Indiana Clark County Page 8 of 9 My Commission Expires May 27,2021 Commission#644704 FOR: 6Z,g-X- (/JA (Name of Local Public Agency) BY: 1 ATTEST: a i II A/ /A�- -- I A k.. _ l I /Mir' affif'I ' Z2CJ �s 7it 0" (T '•ed o rinted Name) �y (Typed or Printed Name) � y��S ,LC,C.-e Ag1/47,4_. 6W/e Ce SPS (Typed or ' 'it-- iiiAL L►� Ii ,� , 0 6v0 (Typed o Printed Name) ACKNOWLEDGEMENT State of Indiana, County of bark, SS: Before me, the undersigned Notary Public in and for the County and State, personally appeared JOCK a efrnotyl , &rinrc Etatr.s &fat &oVU' and acknowledged the execution of the foregoing contract on this o?" day of 1A 20 ri. '' My Commission Expires April )31 tri Mitt. -(Abet ( (Signature) AI 10Y1 12 c--ri (seal) (Printed or Typed) (Notary Public) This document prepared by: Page 9 of 9 Exhibit "A" [Type Header text or Logo] Date: August 2,2019 Subject: Utility Relocation Work Plan for: City of Jeffersonville Wastewater Department j Facility Type: Wastewater Collection and Treatment Section 1: General Information A. INDOT/LPA Project Information 1. DES NO.: 1702787 2. Route Number: Bethany Road in Clark County 3. Location: From 1.31 mi N of SR 62 to Old SR 403 4. Work Type: Road Reconstruction 5. Letting Date: January 2020 6. Date Work Plan Needed May 15,2019 7. Target Date for Utility to be out of conflict with INDOT Project January 1,2020 Intermediate Phase Relocation start date:July 1,2019 Intermediate Phase Enter Target Date B. Utility Designated Contact—Information 1. Designated Contact Name: Len Ashack 2. Office telephone: 812/285-6451 3. Mobile telephone: 502/639-0775 4. Email address: lashdck(04ityofjeff.net 5. Agency name Jeffersonville Wastewater Department 6. Address: 423 Lewman Way 7. City,State,Zip Code: Jeffersonville,IN 47130 8. Construction Emergency Contact: Name: Brad Huffmon Number: 502/551-3036 C. By signing here,the Utility has determined to the best of their ability that they do not have facilities within the project area: Signature of Utility Representative Print Name Date Note: A signature by the utility representative at item"(C)"fulfills the requirement to complete the rest of this form and affirms their contact information above is correct 11Page Revised 03 /0 .1 / 2. 017 1/7 Exhibit "A" [Type Header text or Logo] D. INDOT/LPA Utility Coordinator Contact Information 1. Utility Coordinator Name: Deborah Porter 2. Office Telephone: 317-808-3131 3. Mobile Telephone: 317-771-2311 4. Email Address: Deborah.porter@clarkdietz.com 5. Agency Name: Clark Dietz,Inc. 6. Address: 8900 Keystone Crossing,Suite 475 7. City,State,Zip Code Indianapolis,IN 46240 Section 2: A narrative description of the facility relocation that will be required.[IAC 13-3-3(c)] A. Describe what types of existing active and inactive facilities are present. There is a 12-in sanitary sewer that is located on the north side of Bethany Road that receives the sanitary sewer flow from three(3)subdivisions located northwest od Bethany Road. The subdivisions are Heritage Place,Ashley Springs and Juniper Ridge. B. Describe the location of existing active and inactive facilities. The location of the sanitary sewer can be seen on the attached map. C. Describe what will be done with existing active and inactive facilities. The existing sanitary sewer once it is relocated to the southwest of the new road can be abandoned in place and safe loaded with flowable fill,or completely removed if it interferes with the new bridge. D. Describe the details of the proposed new facilities. A new 12-PVC sewer will be constructed to the west/southwest of Bethany Road as shown on the attached map. E. Describe the proposed location of the new facilities. The relocated sanitary sewer will be moved to the west side of the new bridge in the right-of-way.See attached map. F. By signing here,the Utility has determined to the best of their ability that they have facilities within the project area and the facilities are not in conflict with the project based upon the plans received on <Enter Date Received Plans> Signature of Utility Representative Print Name Date Note: A signature by the utility representative at item"(F)"fulfills the requirement to complete the rest of this form Wage Revised 03 / 01 / 201 / 2/7 Exhibit "A" [Type Header text or Logo] and affirms their contact information above is correct. Section 3:A statement whether the facility relocation is or is not dependent on the acquisition of additional property interests with a description of that work. [IAC 13-3-3(c)(2)(B)] Facility relocation is NOT dependent on separate acquisition of additional property. Section 4: A statement whether the utility is or is not willing to allow the INDOT contractor to do the required work as part of the highway contract.[IAC 13-3-3(c)(3)] The utility is not willing to allow the INDOT contractor. The utility will have a separate contractor relocate the sewer. Section 5: From the date the work plan is approved by both parties;please provide the Utility's pre-construction scheduling information.[IAC 13-3-3(c) (4),IAC 13-3-3(c)(5)] A. The expected lead time in calendar days to obtain required permits: 42 calendar days B. The expected lead time in calendar days to obtain materials: 14 calendar days C. The expected lead time in calendar days to schedule work crews: 14 calendar days If the contractor is being selected by competitive bid what is the date of D. September 5,2019 selection? E. The expected lead time in calendar days to obtain new property interests: 0 The earliest date when the utility could begin to implement the pre- F. September 10,2019 construction activities of the work plan: G. The total number of calendar days for pre-construction activities. 7 days (accounting for concurrent activities) 31Page Revised 03 /0 '1 / 017 3/7 Exhibit "A" [Type Header text or Logo] Section 6: The Utility Construction Scheduling Information.[IAC 13-3-3(c)(4), IAC 13-3-3(c)(5)] A. A statement whether the facility relocation is or is not dependent on work to be done by another utility with a description of that work. [IAC 13-3-3(c)(2)(A)(i)] The sewer relocation is NOT dependent on another utility's work 1. Utility A,with a description of the required work. 2. Utility B,with a description of the required work. 3. Utility C,with a description of the required work. B. A statement whether the facility relocation is or is not dependent on work to be done by the department or the department's contractor with a description of that work.[IAC 13-3-3(c)(2)(A)(ii)] The sewer relocation is NOT dependent on the work done by the department. 1. Work item A 2. Work item B 3. Work item C C. How many calendar days after the events identified in Sec 6 A and B are completed can the utility begin construction: Immediately D. The number of calendar days to complete the relocation work:60 Days Revised 03 /01 / 2017 4/7 [Type Header text or Logo) Exhibit "A" Section 7:A drawing of sufficient detail with station,offset,elevations,and scale to show the proposed location of the facility relocation,which takes precedence over the narrative description of the work,needs to be on INDOT Construction drawings. [IAC 13-3-3(c)(6)]. Plans must be attached to this Work Plan Document. See Attached map Section 8: For each work plan the utility shall include a cost estimate for the facility relocation. For reimbursable work the estimate will identify betterment and salvage which is not reimbursable. [IAC 13-3-3(d)] See the Attached Engineers Estimate. Section 9: For work the utility is entitled to be compensated by the Department,the work plan shall include documentation of property interests and compensable land rights.[IAC 13-3-3(d)] The appropriate proof of sanitary sewer easements have been submitted Section 10:The implementation of this approved work plan is dependent upon the issuance of: (a notice to proceed will be provided when items in Section 6 are accomplished) Items Completed Yes _Not Applicable An executed reimbursement agreement with INDOT/LPA: t:i ❑ Arelocation permit from INDOT/LPA: xD (Note: Double-click on box in Yes or NA to mark it with an "X") VIrel 4 e/ /2-49/9 Signature of Ut lity Representative Date Ian ILAt C Utility Representative Name Printed INDOT/LPA use only below this point- ------ INDOT/LPA use only below this point Wage Revised 03 / 01/ 2017 5/7 (Type Header text or Logo] Exhibit "A" The following sections are to be used by INDOT personnel to review the utility relocation work plan. Section 11:The Department shall review the work plan to ensure that it: [IAC 13-3-3(e)) Description Yes No Initials (1.a) is compatible with department permit requirements ® ❑ DKEP (1.b) is compatible with the project plans ( ❑ DKEP (1.c) is compatible with the construction schedule ® 0 DKEP (1.d) is compatible with other utility relocation work plans f] DKEP (2.a) has reasonable relocation scheme 0 DKEP (2.b) has a reasonable cost for compensable work [ Q DKEP (Note: Double-click on box under Yes or No to mark it with an "X") Comments on any sections(l.a—2.b)that were marked No: CiA6Atr_E. Pd1t) 8-20-2019 Utility Coordinator Signature Date Deborah K.E. Porter Utility Coordinator Name Printed Section 12;Approved Work Plan. [IAC 13-3-3(f)] I have reviewed the work plan and found it acceptable. Project Manager Signature(LPA Project—ERC Signature) Date Project Manager Name Printed (LPA Project—ERC Name Printed) Wage Revised 03 / 01/ 2017 6/7 rExhibit „A„ s4, f* �4 y } 1. io / / •*e 2 ,°' r / a E f a T /: ! ✓ Z ✓ f t /�.+.r.�,�,_�_ 7 / m W E J Z� O 8_8. / • °frog / 3_ //I/ r IA • i TI C X X >c ril Z Z m 5' 5 cn cn y (n CD CD CD Cr C C f CD 0• N N N N 3 CD K S' g. a d D 0 m o 3 0 m a 7/7 Exhibit "B" Dixon Engineering Services 408 Erin Dr. Jeffersonville IN 47130 812-288-2161 Email: brian.dixon@emcstl.com BETHANY ROAD SEWER RELOCATION CONSTRUCTION COST ESTIMATE Prepared by: Brian Dixon Date: June 13,2019 Item Description Quantity Unit Cost Total A Mobilization/Demobilization 1LS S-1-2;000:00--4I +fir' $1-27980-06 13,2.c°,fin 8 Clearing/Grubing 1 LS 597590.80 " 1014 -X00.00- I°,45°"oC C Erosion Control 1 LS-$1-5;909-00.' t` iGee'- V67900790-t 1(..vS°°-"c) D Common Excavation 1700 CY $6.50 4' t•IS ir44,050:90 i17-,t S•00 E Rock Excavation 500 CY -i100O0-4110-w --$50;000:00--46S,coo.00 F 12" PVC SDR-35 1200 LF $28.50-t31:3G $34,200:00 1'31,to 20-c'() G Crushed Stone Backfill 3025 TON $8.50 I.SG $25,712.50 $28, -8S.1 H Common Earth Backfill 700 CY $2.25 J'2.14Y? $1,575.00 4.I,136..oO I Manholes with Watertight Lids 5 EA .4 000-O0-4'4,400. -$20,000:00- 1>22,coO00 J Creek Crossing 1 EA -$30-,-00&09-433,pop. -$30700:90--i331ccb-t'C' K Testing Sewer and Manholes 1 LS -$9;-€00.00-$1014 . -$9;500.09- $Io,450-°O L Restoration 2000 SY -$.7750- *0.2S -$15;988-80- $ Ito,GDa.o n M Abandon Existing Sewer 1 LS -$8,000-00- $i3,',ace. -$87000:90- 8,S ,00 C e_*15-Mucit otil S u b TO I PdL i 24.;,(.(14-.. r5 O Engineering Design 1 $12,000.00 $12,000.00 P Permit Preparation 1 $2,000.00 $2,000.00 Q Construction Observation 1 $2,000.00 $2,000.00 E;tl ',2-577537 50-- ---G t+agenoy 10% $25,754.00 Total $203,291.50 t 23i 1(,)9 4,1cS