HomeMy WebLinkAboutGOTTBRATH PARKWAY CHANGE ORDER 2 CHANGE ORDER-EXTRA WORK AGREEMENT NO. 2 JOB NO. 16031I2
Project Name Gottbrath Parkway Phase II
Contractor Excel Excavating,Inc.
You are hereby authorized to proceed with the following<l .scribed change or extra work:
Air attached documentation:
1 Add Quantity to Pay Item No. 13 Shot Rock: 7,:,00 TON @$8 23/TON = $ 62,700.00
2 Add Quantity to Pay Item No. 11 Corrpacted A e ate Nc 53,Base:2,400 TON @$15.50/TON = $ 37,200.00
3 Add Pay Item for No. 57 Aggregate: 111 TON @$17.97/TON = $ 1,994.67
4 Install Construction Entrance for Shot Rock Import _ _ $ 5,000.00
5 Add Pay Item for Excavation,Haul off and Disposal of Unsuitable Materials: 3,800 CY @$26.65/CY = $ 101,270.00
TOTAL = $ 208,164.67
The method of payment for this change or extra work shall be:
An additional amount of Two hundred eight thousand one hundred sixty four dollars and sixty seven cents =$208,164.67
Consulting Engineer: aco i :..mbs and Lanz,Inc.
ill ._% 7/3�
Engineer's S.,: a e ate
Owner's Approval: City offefferson .g' '7/3//1
Signature of Owner(s) " Da
Contra is A royal: Excel Excavating,Inc.
v,:e. •Z
cited Repr'r tative Title Datte
Page 1 of 1