Loading...
HomeMy WebLinkAboutGOTTBRATH PARKWAY CHANGE ORDER 2 CHANGE ORDER-EXTRA WORK AGREEMENT NO. 2 JOB NO. 16031I2 Project Name Gottbrath Parkway Phase II Contractor Excel Excavating,Inc. You are hereby authorized to proceed with the following<l .scribed change or extra work: Air attached documentation: 1 Add Quantity to Pay Item No. 13 Shot Rock: 7,:,00 TON @$8 23/TON = $ 62,700.00 2 Add Quantity to Pay Item No. 11 Corrpacted A e ate Nc 53,Base:2,400 TON @$15.50/TON = $ 37,200.00 3 Add Pay Item for No. 57 Aggregate: 111 TON @$17.97/TON = $ 1,994.67 4 Install Construction Entrance for Shot Rock Import _ _ $ 5,000.00 5 Add Pay Item for Excavation,Haul off and Disposal of Unsuitable Materials: 3,800 CY @$26.65/CY = $ 101,270.00 TOTAL = $ 208,164.67 The method of payment for this change or extra work shall be: An additional amount of Two hundred eight thousand one hundred sixty four dollars and sixty seven cents =$208,164.67 Consulting Engineer: aco i :..mbs and Lanz,Inc. ill ._% 7/3� Engineer's S.,: a e ate Owner's Approval: City offefferson .g' '7/3//1 Signature of Owner(s) " Da Contra is A royal: Excel Excavating,Inc. v,:e. •Z cited Repr'r tative Title Datte Page 1 of 1