HomeMy WebLinkAboutPENN ST. SIDEWALK AND DRIVEWAY APROONS BETWEEN 8TH AND 9TH DAN CRISTIANI EXCA VA TING CO., INC. 48
1221 Old Hwy. 31E 1971 - Present
P. O. Box 2427 YEARS OF
EXCELLENCE
Clarksville, IN 47131-2427
PHONE (812)282-9866 Fax (812)282-9908 Dan Cristiana
vating Co.,Inc.
PROPOSAL
To: City of Jeffersonville
ATTN:Andy Crouch
DATE:6/14/19
JOBSITE:Penn St. Sidewalk and Driveway Aprons (Between E. 8th St. and E. 9th St.)
Scope of work to include:
Form and pour approx.436' of 5'wide sidewalk with integral curb.
$9,897.00(or$22.70/ft.)
Form and pour(2)concrete driveway aprons,approx. 12' long each.
$665.00(or$27.70/ft.)
Total: $10,562.00
*Note 1: Price is based on City of Jeffersonville paying for half of cost and IAWC paying for the other
half of cost.Total construction cost is twice the above amount.
Not included in this quote:
Permits,bonds,concrete sealant,and concrete color.
Acceptance to constitute a contract between us. This bid to hold for a period of 30 days from date.
Terms:Net 15 days following date of invoice.
DAN CRISTIANI EXCAVATING CO.,INC. ACCEP
BY Derek Misch BY
DATE L.9Ck
J:\ACTIVE JOBS\5372.IAWC-Penn St.Water Main\Penn St.Sidewalk Proposal-City of Jeff.docx
Equal Opportunity Employer
Page 1 of 1