Loading...
HomeMy WebLinkAboutLIBS LABS PAVING CO., INC. May 29, 2018 Project Name Attn: Andy Crouch City of Jeffersonville Keystone Blvd Overpass @ 500 Quartermaster Ct, Suite 200 CSX Jeffersonville, IN 47130 5035 Keystone Blvd Jeffersonville, IN 47130 We are happy to present to you the following proposal for work to be performed. If you have any questions, please do not hesitate to contact us. Thank you! Repair approach to each side of overpass approx. 34' x 5' and 34' x 7'. 1. Mill/edge key as necessary 2. Broom and tack 3. Wedge/level as necessary 4. Apply 1.5"-2"surface asphalt Total Price for this item: $1,900.00 Resurface entrance apron as outline in red on map. Approx. 5,200 sq ft. 1. Edge key transitions 2. Broom and tack 3. Wedge and level as necessary 4. Apply 1.5" surface asphalt Total Price for this item: $5,250.00 Proposal: Keystone Blvd Overpass /� CSX �B� //r� P4VING CO.. INC_ Image '''.- Keystone Bird Apron _ ' t° 1 .;.O M1. d tom,, r.JL IIL ‘,..:4.-.:., - -... 441,j_. II ..„... .„ y « .3 AIS ■ • �t DJa `• .. } , -. • .. ..b .....**' .1rrom«_ • a ,. M1i ., Notes: Page 2 (Lu Bs� Price Breakdown: Keystone Blvd Overpass @ CSX VING INC. Please find the following breakdown of all services we have provided in this proposal. This proposal originated on May, 25, 2018. Job Number: 18901 Item Description Cost 1 Repair approach to each side of overpass approx. 34'x 5' and 34' x 7'. $1,900.00 2 Resurface entrance apron as outline in red on map. Approx. 5,200 sq ft. $5,250.00 Total $7,150.00 Authorization to Proceed & Contract You are hereby authorized to proceed with the work as identified in this contract. By signing and returning this contract, you are authorized to proceed with the work as stated. We understand that if any additional work is required different than stated in the this proposal/contract it must be in a new contract or added to this contract. Please see all attachments for special conditions that may pertain to aspects of this project. Page 3 LABS Proposal: Keystone Blvd Overpass @ CSX PAVING INC. Payment Terms We agree to pay the total sum or balance in full 10 days after the completion of work. I am authorized to approve and sign this project as described in this proposal as well as identified below with our payment terms and options. Date: ZG l 9 /1 • , And,y- rouch Jeff Libs/President City of Jeffersonville jeff(a�libspaving.com 500 Quartermaster Ct, Suite 200 C: 502-558-2760 Jeffersonville, IN, 47130 Libs Paving Company, Inc. acrouchcityofjeff.net 6931 Atkins Road C: 502-553-8822 Floyd Knobs, Indiana, 47119 0: 812-285-6415 P: 812-944-8942 F: 812-949-2806 //2/41/. http://www.libspaving.com Page 4 KEYSTONE BOULEVARD _111r u a - I > • 41' f i-..rete 4J - Approach apron at Utica Sellersburg Road-$5,250 La 4 ;11.t.A.V41‘741": Z7.17 .1r k �.�' a. a .W , rP, �- T t yi '. ' Imo" - • 4 { 'y" S t�' jgrs 'sem,,.,, Pa "v: .r' - TF v�Yl� +� .. Southbound approach to bridge 4 r r ri$P .•:ice7. Northbound approach to bridge Bridge approaches-$1,900 Total Total Contract - $7,150