HomeMy WebLinkAboutCHANGE ORDER FIELDHOUSE ._ . 0,0AT '``:' 1Document G701 ' — 2017 Change Order ~ PROJECT:(Name and address) ,^ CONTRACT INFORMATION: CHANGE ORDER INFORMATION: John II,Schnaner-Nachand Fieldhouse Contract For:General Construction Change Order Number:002 Renovation 691 E.Court Avenue,Jeffersonville,IN Date:November 21,2017 Dale:April 23,2018 47130 OWNER:(Name and address) ARCHITECT:(Name and address) CONTRACTOR:(,Vane mol address) Jeffersonville Parks Authority TEG Architects LLC AML,Inc. on behalf of the City ofJetTetsonville 903 Spring Street 2916 CampionRoad Jeffersonville,IN 47130 l loyds Knobs, IN 47119 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and,if applicable,attach or reference specific exhibits.Also include agreed upon adjustments attributable to executed Construction Change Directives.) 1. Per PR No,3,Add for Ten(10)new downspouts and scuppers to replace deteriorated existing. ADD$16,526.12 2. Per PR No.5,Add for additonal tuckpointing per the attached Man.Company quote explaining the additonal square footages and pricing. ADD$19,789.00 3. Per PR No.6,Add One(I)new baby changing station in lieu of re-installing existing baby changing station. ADI) 5376.58 The original Contract Sum was $ 456,400.00 The net change by previously authorized Change Orders $ 36,587.25 The Contract Sum prior to this Change Order was $ 492 987,25 The Contract Sum will be increased by this Change Order in the amount of $ 36,691.70 The new Contract Sum including this Change Ordet will be $ 529,678.95 The Contract Time will be increased by Zero(0)clays. The new date of Substantial Completion will be NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. TL'(.i Architects LI C AML,Inc. Jeffersonville Parks Aurthority ARCHITECT(F r1 um ') CO •• (Firm,u 71 � _.QWNER(Piton n`r�`rTic �1/% / SIG +ATURE SIG's SIGNATURE Nathan Love,Project Manager Scot L.Welch,President Bill Burns,President PRINTEDINTENAME AND TITLE PRIN ED , • E AND TITLE PRINT D AME D TITLE DATL' /1 8 1'Z' -• 7(2) I V DATE DATE AIA Document 67011°-2017.Copyright 01979,198/,2000,2001 and 2017 by The Amadcen Instituto of Architects.All rights reserved.WARDING!This AIA` Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction ur distribution of this AIA' Document,or any portion of It,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 13.3722 on 04/23/2018 under Order No.6985402079 which expires on 07/10/2018.and is not for resale. User Notes: (309ADA30)