HomeMy WebLinkAboutHAMHED Contract for Services Rendered
This is a contract entered into by HamHed, LLC (hereinafter referred to as "the Provider") and
the Jeffersonville Parks Commission(hereinafter referred to as "the Client") on this 18th day of
December, 2017.
The Provider's place of business is 200 Galvan Way,New Albany, Indiana 47150.
The purpose of this contract is for the annual comprehensive maintenance at the Jeffersonville
Big Four Station Park and a portion of Downtown Jeffersonville. The City of Jeffersonville
wishes to maintain the area: East of Mulberry- West of Wall - South of 7th Street-North of the
Ohio River; including but not limited to Mulberry, Pearl, Spring, Wall Street, 7th Street, 6th
Street, Michigan Ave, Kentucky Ave, Federal Ave, Riverside Drive, Market, Chestnut and
Maple streets as well as Warder Park, Fisherman's Wharf, Big Four Station and the Big Four
Ramp. Also included in the purpose of this contract is recyclable collection from; Big Four
Station, River Stage, Warder Park, Fisherman's Wharf. The required maintenance contract will
include the daily,weekly, monthly, annual and event specific task needed to maintain the
aforementioned area. Anticipated work performance period to begin 01/01/2018.
The Client hereby engages the Provider to provide services described herein under "Scope and
Manner of Services." The Provider hereby agrees to provide the Client with such services in
exchange for consideration described herein under "Payment for Services Rendered."
Scope and Manner of Services:
Contractor to provide: All labor, supervision, equipment, materials and supplies to meet the
required scope of work for annual (12-month service). Big Four Station Park is to be serviced 7
days a week. Streets and facilities should be cleaned as seen fit. Contractor shall be responsible
daily opening and closing of Big Four bathroom facilities (when automatic lock and unlock is
unavailable),hours of operation may be adjusted by City Representatives
Services to Be Rendered by Provider include the following:
JANITORIAL SERVICES
Minimum Frequency Task Description (12-month service)
2 X Daily Bathroom cleaning(mid-day and evening)
Daily cleaning: floor sweeping, wet mop, cleaning of toilets and sinks, cleaning of bathroom stall
walls, clean all glass surfaces.
2 X Daily Re-Fill Bathroom dispensers with needed supplies to include soap, all paper products,
sanitizer and urinal deodorizers.
2 X Daily Empty all wastebaskets and containers, removal of trash liners with replacement of
heavy-duty bags to avoid any leakage or tears. Wastebaskets shall be kept clean of any leakage
or refuse.
2 X Daily Clean bathroom entry doors and exterior area near structure.
2 X Daily Clean sanitize drinking fountain, and water bottle refill station.
LANDSCAPING/GROUNDS MAINTENANCE
Daily Within Big Four Station only -Remove any garbage from playground area to include
equipment. Emptying of outside trash and recycle receptacles.
As needed thorough property cleaning of all lawn areas, landscape beds, and ramp.
1 X Weekly Cleaning of Asphalt areas (Parking areas and adjoining City Streets), to be cleaned
with commercial air street vacuum. Street Sweeper must have a water system to minimize area
dust. Mechanical brooms are not permitted due to the large amount of dust produced during
operation.
4 X Additional street sweeping to occur in the Fall season to pick-up an accumulation of leaves
along sidewalks, alley ways and public streets. (To occur between Oct 1St -Dec 1St)
1 X Weekly street sweeping of City Marina area(Fisherman's Wharf)to include cleaning of
pedestrian stair area and River Stage lower parking area.
5 X Annually Within Big Four Station only - Lawn and Landscape chemical fertilization(5
treatments)
2 X Annually Within Big Four Station only- Shrub/Bush and Tree pruning
2 X Annually Within Big Four Station only - Mulch installation in all landscape beds and around
trees, 1St application to occur before Thunder over Louisville and 2nd to occur before Labor Day
Holiday.
6 X Annually Within Big Four Station only - Landscape Bed maintenance, de-weeding.
1 X Weekly Grass Mowing of Big Four Station, Task to include grass trimming of sidewalks,
curbs and landscape areas. All asphalt and concrete areas to be blown off after completion. (32
cuts annually)
1 X Weekly gum removal from sidewalks, tables, seating and playground equipment. (April 15-
Nov 1st).
1 X Weekly pick-up and transport of collected recyclable materials. Materials to be taken to an
approved recyclable facility. City provided recyclable containers to be picked-up weekly by
approved transport vehicle to ensure no loss of materials in transport. Locations to be serviced:
Big 4 Station, River Stage, Fisherman's Wharf, Warder Park.
ADDITIONAL MISCELLANEOUS MAINTENANCE
-As needed pressure washing of concrete areas, pavilion area tables and post, and bathroom areas
to remove any spills or stains.
-As needed removal of cobwebs from Big Four ramp railing.
-As needed pick up trash and cigarette butts in public right of way
-As needed graffiti removal from pavement, signage, trash cans, and other public or city property
-As needed light bulb replacement and minor repairs to faucets, stall doors, in restroom facilities.
-As needed weed removal in public right of way. (sidewalks and curbs)
-As specified Special Event Clean-ups: Included in annual scope of work is (8) post special
event clean-ups, events to be specified by Parks Director
The above are the minimum. The City may require the performance of said task(s) on a
more frequent basis. Contractor may submit proposals for both janitorial services and
landscaping/ground maintenance combined or separate proposals for each.
ADDITIONAL WORK OUTSIDE THE STATEMENT OF WORK
Additional work not covered in specifications on a"requested"basis. These task are only to be
performed with an Approved modification,the contractor shall be compensated for the additional
work at an agreed upon price. Any additional work shall be itemized on the monthly invoice.
Example:Additional Special Event clean-ups
INSURANCE COVERAGE REQUIREMENT
Workers Compensation and Employer's Liability.
The contractor is required to comply with applicable federal and state workers" compensation
and occupational disease statutes. If occupational diseases are not compensable under those
statutes, they shall be covered under the employer's liability section of the insurance policy,
except when contract operations are so commingled with a contractor's commercial operations,
that it would not be practical to require this coverage. Employer's liability coverage of at least
$1,000,000 per incident and $2,000,000 General Aggregate shall be required.
General liability
(1) The contractor shall have bodily injury liability insurance coverage written on the
comprehensive form of policy of at least $1,000,000 per occurrence.
(2) Property Damage Liability Insurance shall be required in the amount of$100,000.00.
Automobile liability-the contractor shall have automobile liability insurance written on the
comprehensive form of policy. The policy shall provide for bodily injury and property damage
liability covering the operation of all automobiles used in connection with performing the
contract. Policies covering automobiles shall provide coverage of at least $200,000 per person
and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.
SUBCONTRACTING REQUIREMENT
If contractor intends on utilizing subcontractors for any portion of the Scope of Work, a
Certificate of Insurance shall be included in proposal from each subcontractor. Additionally,
each subcontractor must adhere to the requirements of the solicitation for the section of work the
subcontractor will be performing. Include in proposal, a copy of the "Subcontracting Teaming
Arrangement" must be submitted. Subcontractors must include a copy of their Accident
Prevention Plan, Quality Control Plan, Past Performance References and Certificate of Insurance
Payment for Services Rendered
Price shall be submitted as an annual cost for all services included in the Scope of Work. Submit
a price for each of the (3) years of the base contract in the below format, specifying if price
includes only janitorial or only grounds maintenance or both. Contractor may submit prices
separately or combined:
Year (1) Annual Payment(5% Discount)
2018: Annual total for services -- $183,780.00 $174,459.00
2019: Annual total for services -- $183.780.00 $174,459.00
2020: Annual total for services -- $183.780.00 $174,459.00
The base term of the contract shall be for a period of three (3) years from the date of contract
execution, anticipated start date of 01/01/2018. There may be two (2) one (1)year options for a
total of five (5) years at the City's option. Option year(s) pricing shall be submitted upon City's
request no later than Oct 15, 2020.
The Client shall pay the Provider for annual services rendered for each calendar year, payment to
be received no later than March 1st of each calendar year
Should the Client fail to pay the Provider the full amount specified in any invoice within
calendar days of the invoice's date, a late fee equal to <$100> shall be added to the amount due
and interest of percent per annum shall accrue from the calendar day following the invoice's date.
Applicable Law
This contract shall be governed by the laws of the County of Clark in the State of Indiana and
any applicable Federal law.
In witness of their agreement to the terms above, the parties or their authorized agents hereby
affix their signatures:
Date: 0,6,//r Date: December 18th, 2017
+i i.1 .u resident W. Eric Hedrick, President
Jeffersonville Parks Board HamHed, LLC Representative
Attest:
By:
Attachment
Itemized Cost for Additional Services
Warder Park expansion of area (52) $210 $10,920
Fisherman's Wharf/ Marina (52) $75 Per $3,900
(8) Special Events $500 $4,000
Additional Mulch Application (1) $9,000 $9,000
Weekly Gum Removal (26) $80 $2,080
(4) Extra Fall Sweeps $580 Per $2,320
Monthly Service (Bathrooms) (4) $3,200 $12,800
General Repairs (80 Hours @ $25) $2,000
Recycle Pick-up (52) $130 $6,760
TOTAL: $53,780
Previous Contract Price: $130,000 (Discounted from $135K)
All Added services from above: $53,780
$183,780
(Price Quoted above of$180,105 reflects Discount of 2%)
If you wanted to add mowing back in - $12,000 Annually (32 Cuts)