Loading...
HomeMy WebLinkAboutJOHN H SCHNATTER NACHAND FIELDHOUSE RENEOVATION _ t 3 y -, , R2 eass��- sem � I ( Proposal to Provide Professional Services for the C Gls Y 0 JOHN H. SCHNATTER NACHAND FIELDMOUSE RENOVATION DEPARTMENT OF REDEVELOPMENT �Rsa� SAVE THE FIELDMOUSE COMMITTEE 4,MENDED SCOPE OF SERVICES 28 AUGUST 120 1 7 DESIGN CHANGES LIVES 28 August 2017 Mr.Bill Burns Chairman-Save the Fieldhouse Committee 2123 Veterans Pkwy Jeffersonville,IN 47130 RE: Proposal Outlining the Amended Scope of Professional Services for Nachand Fieldhouse Renovation Dear Bill, Thank you for participating in discussions with me regarding the revised scope of services for the Nachand Fieldhouse Renovation:. We appreciate the opportunity to provide this amended proposal,which builds or,.the approved proposal dated Jure 6th,2017. This proposal reflects amendments to the scope of services provided,which we believe will best serve you for the updated scope of work desired at the Nachand Fieldhouse. Please find outlined below a brief synopsis of this proposal. If found to be acceptable,please sign where indicated and return a signed copy of the proposal to TEG Architects at your earliest convenience.This document delineates the following elements of the agreement: Section One: Project Scope Section Two. Scope of Services Section Three: Basis for Compensation Section Four: Additional Services We look forward to working with you or. this project and will strive to demonstrate the advantages of our approach to Service, Quality and Creativity. Thank you for allowing TEG Architects to submit this document for your consideration. Sincerely, R.Wayne Estopinal I AIA,ACHA,LEED AP President TEG Architects LLC TEG ARCHITECTS LLC QLNOIY 7 C�N I28, IU SUS? 201 SECTION ONE PROJECTSCOPE im The Renovation of the Nachand Fieldhouse involves multiple disciplines and initiatives. TEG understands that the group titled Save The Fieldhouse (STP) desires to produce designs and documents adequate for the renovation of the existing south facade and existing North men's and women's restrooms of the existing Fieldhouse on Court Avenue in Jeffersonville. 1.02 It is TEG's understanding from STF that this project is not under prevailing wage requirements. -- i Y } r It Da 71,77 71,77' { 1 t r 'N C.'i AM PuCNlJ 'r=;tL aUJS_.%tNOJA1ECqI2FitCU51 :>. t17 SECTION TWO AUGUST 2017 REVISED SCOPE OF SERVICES 2.01 TEG anticipates the following services will be required. .1 Design of window and door replacements for windows on the south fagode only,a total of 26 windows and one door. .2 TEG will request unit prices from bidders for additional window replacements as permitted by the STP budget. •3 Structural calculations and design for lintel replacement of at up to 6 different window conditions which can be used around the entire building. Design of flashing at the new windows is also included. .4 Design renovation of the existing canopy at the South Facade. Canopy renovation will include demolition of canopy enclosure and reuse of the existing steel structure. Renovation will also include new canopy enclosure design and canopy lighting design. .5 Canopy renovation scope includes a typical canopy design to be applied to the south canopy.TEG will request unit prices for renovation of all additional canopies in a similar or equal design as the south canopy,as permitted by the STF budget. .6 Lighting plan to be developed for south canopy, to be tied into existing electrical systems.Additional lighting is to be designed for all other canopies in similar to the south facade canopy,as permitted by the STP budget.TEG will coordinate with CMTA on the design intent of the exterior canopy lighting and lighting of the South Facade. 2.02 In addition to the renovation of the south facade,it is understood that TEG will provide the following services: .1 Coordinating with a Masonry Restoration Contractor for services which STP is contracting for directly with the contractor. The scope of this coordination involves tuckpointing the entire building and renovation of the north parapet and roof repairs in that area. .2 TEG includes in our scope of services the structural engineering and flashing design at new lintels at all windows. 7FG:,itCi-ICi C,T 1 AAh NACHAN`_'"IFJLDAC JS Q:r'N(),YAi OINI 128-NIiGUST 2017 �! SECTION THREE BASIS FOR COMPENSATION 3.o1 TEG proposed to provide the services outlined in this Proposal for the following stipulated fees. Design Development/Coordination $6,000 Construction Documents/Coordination $18,500 Project Bidding/Coordination $4,250 Project Fees $28,750 Construction Administration-Donated Services $3,000 3.02 Earlier this year, TEG previously developed schematic design illustrations for fundraising and interest raising purposes for the project, this was valued at $3,000 for reporting of pro Bono services. 3.03 Reimbursable Expenses are not included in the fee stated in 3.01. Unless extensive printing or reprographics are required,no reimbursable expenses are anticipated.Our firm's policy on reimbursable expenses is to invoice our clients at our direct cost with no mark-up for processing. Examples of reimbursable expenses include but are not limited to the following: Travel Expenses + Airfare(Mileage based on the current Federal Standard per mile) Reprographic Expenses for the production of check sets and bidding sets Reprographic Expenses for the production of presentation drawings and display boards Shipping Expenses associated with distribution of materials associated with the project Advertising expenses All City,State and other Authorities having jurisdiction Fees,etc. 3.04 Invoices will be distributed on a monthly basis. All invoices unpaid after thirty (3o)days beyond the invoice date are subject to interest charges at a rate of 1.5% per month applied to the outstanding balance. 3.05 If for any reason, the project is halted for more than 90 calendar days; TEG Architects LLC is to be compensated for all work and expenses performed prior to the stoppage. 3.o6 If Owner/Client breaches this agreement by failing to pay, after demand, any amounts due Architect then Architect may commence suit for damages, and recover its attorney fees incurred as a part of its damages. 3.07 The Architect does not control the cost of construction; material suppliers, subcontractors,general contractors and construction managers determine the cost of the work.The Architect will use generally accepted square footage costs to prepare all estimates of the Cost of the Work. The Cost of the Work is an estimate and is not a guaranteed price; factors of inflation, regional variations, material availability,etc.impact costs,all out of the control of the design team. r • 3.08 The Architect's estimate of the Cost of the Work is generally within 15%of the actual bid cost of the work. The Architect is not responsible for redesigning approved design efforts unless the construction document bids exceed the estimated Cost of the Work beyond this 15%factor. 3.09 Upon acceptance of this proposal as well as completion of schematic design and statement of estimated cost,TEG will prepare AIA document Blot for full scope of services for execution. SECTION FOUR ADDITIONAL SERVICES 4.01 All services beyond those outlined in this Proposal are considered Additional Services. If Additional Services are required, a separate proposal defining the Scope of Services and Professional Fees will be prepared. 4.02 Revisions to designs or documents after approval at each project development phase or final documents previously approved by the Owner/Owner's Representative. 4.01 Meetings beyond the meetings outlined in the Scope of Services, (including meetings with city,state or other agencies for review of the project.) 4.02 Revisions to drawings upon completion of construction/installation to provide accurate as-built drawings. This proposal is valid for 45 days from date issued. =7rdlcvi�`�°i, 5=:a NAC HAND F.L12"", ! S ._ )17 Thank you for your consideration of our proposal. Evaluating professional services is very difficult,scope of services and fees vary greatly from one proposal to another.If services outlined in.this Proposal are not as you desire or do not reflect the scope that others may propose, please allow TEG Architects LLC to modify to better serve you and the project. Respectfully Submitted, 17 o i R.Wayne Estopinal I AIA,ACHA,LEED AP President TEG Architects LLC Upon acceptance of this proposal,please sign and date one copy and return it to me.We will then write the Owner/Architect agreement based on this proposal acceptance. Accepted By:Mr.Bill Burns Mr.Bill Burns Date Chairman.Save the Fieldhouse Committee Copy: Peggy Whiteman R.Wayne Estopinal Kevin Russell John Sprouls File:TEGA.100.23