HomeMy WebLinkAboutWOEHRLE L-OCHMUELLE
R
GROUP
61 Quartermaster Court,Jeffersonville, Indiana 47130•812.725.7900
An Agreement for the Provision of Limited Professional Services
DATE: April 5, 2017 LOCHMUELLERPROJECT No: 217-0505-OWW
CLIENT: City of Jeffersonville
500 Quartermaster Court,Suite 250
Jeffersonville, Indiana 47130
PROJECT NAME/LOCATION:
Woehrle Road Drainage Study
SCOPE/INTENT AND EXTENT OF SERVICES:
LOCHMUELLER shall conduct a Hydrology and Hydraulics (H&H)study in the area of Woehrle Road to Waverly Road
FEE ARRANGEMENT:
LOCHMUELLER shall receive compensation for the performance of the services set forth under this Agreement on an
hourly and expense rate basis per the rates set forth in Attachment "B",attached to this Agreement and made an
integral part hereof. The total compensation shall not exceed$15,000.00,unless an amendment to this Agreement is
executed in writing by both parties.
SCHEDULE:
LOCHMUELLER shall commence providing the service set forth in Scope/Intent of this Agreement upon receipt of a
written Notice-to-Proceed and shall complete the services on or before May 2, 2017.
THIS AGREEMENT IS SUBJECT TO THE TERMS AND CONDITIONS ON THE REVERSE SIDE HEREO . PL SE REVIEW THEM CAREFULLY.
OFFERED BY: LOCHMUELLER G UP INC.
ACCEPTED BY: I OFJ FFERSONVILLE
Al
M AEL R.HINTON i SIGNATURE
P ESIDENT�CEO
/`7r. � /�GG✓� /`2 r
PRINT NAME AND TITLE
DATE -
DATE
W:\ACCNTING\CONTRACT\1FFFFRSONV.LLE\]1)0505 WOE HRLE RD DRAINAGE STV DY\AGR TD CITY 000511.00a
rLZ�cm�mUELLER
GROUP
3502 Woodview Trace,Suite 150, Indianapolis,Indiana 46268•317.222.3880
2017 HOURLY RATE SCHEDULE
WATER RESOURCE SERVICES
Classification Hourly Rate
Individual Rates
Chief of Water Resources $225
Senior Project Manager $200
Senior Project Engineer $195
Project Engineer IV $178
Project Engineer III $135
Project Engineer II $115
Project Engineer 1 $100
Construction Engineer III $143
Construction Engineer II $113
Construction Inspector 11 $90
Construction Inspector 1 $75
Environmental Scientist III $120
Regulatory Specialist $105
Manager Water Resources Designers/Technicians $102
Engineering Technician III $75
Engineering Technician II $70
Engineering Technician 1 $67
Administrative Technician 1 $60
DIRECT EXPENSES will be charged to the client in addition to the above quoted rates. Mileage will
be charged at a rate of $0.50 per mile. Direct expenses include but are not limited to: testing,
express mail costs, lodging and meals, provided that they are reasonable and necessary for the
accomplishment of the work. Lodging and meals will be billed at the cost incurred by Lochmueller
Group, Inc.
These rates may be changed on an annual basis at the discretion of Lochmueller Group, Inc.
W:\ADMINDOC\HOURLY RATES\2017\2017 HOURLY RATE INDY WATER RESOURCE.DOC
Indy WaterResource 011117