Loading...
HomeMy WebLinkAboutWOEHRLE L-OCHMUELLE R GROUP 61 Quartermaster Court,Jeffersonville, Indiana 47130•812.725.7900 An Agreement for the Provision of Limited Professional Services DATE: April 5, 2017 LOCHMUELLERPROJECT No: 217-0505-OWW CLIENT: City of Jeffersonville 500 Quartermaster Court,Suite 250 Jeffersonville, Indiana 47130 PROJECT NAME/LOCATION: Woehrle Road Drainage Study SCOPE/INTENT AND EXTENT OF SERVICES: LOCHMUELLER shall conduct a Hydrology and Hydraulics (H&H)study in the area of Woehrle Road to Waverly Road FEE ARRANGEMENT: LOCHMUELLER shall receive compensation for the performance of the services set forth under this Agreement on an hourly and expense rate basis per the rates set forth in Attachment "B",attached to this Agreement and made an integral part hereof. The total compensation shall not exceed$15,000.00,unless an amendment to this Agreement is executed in writing by both parties. SCHEDULE: LOCHMUELLER shall commence providing the service set forth in Scope/Intent of this Agreement upon receipt of a written Notice-to-Proceed and shall complete the services on or before May 2, 2017. THIS AGREEMENT IS SUBJECT TO THE TERMS AND CONDITIONS ON THE REVERSE SIDE HEREO . PL SE REVIEW THEM CAREFULLY. OFFERED BY: LOCHMUELLER G UP INC. ACCEPTED BY: I OFJ FFERSONVILLE Al M AEL R.HINTON i SIGNATURE P ESIDENT�CEO /`7r. � /�GG✓� /`2 r PRINT NAME AND TITLE DATE - DATE W:\ACCNTING\CONTRACT\1FFFFRSONV.LLE\]1)0505 WOE HRLE RD DRAINAGE STV DY\AGR TD CITY 000511.00a rLZ�cm�mUELLER GROUP 3502 Woodview Trace,Suite 150, Indianapolis,Indiana 46268•317.222.3880 2017 HOURLY RATE SCHEDULE WATER RESOURCE SERVICES Classification Hourly Rate Individual Rates Chief of Water Resources $225 Senior Project Manager $200 Senior Project Engineer $195 Project Engineer IV $178 Project Engineer III $135 Project Engineer II $115 Project Engineer 1 $100 Construction Engineer III $143 Construction Engineer II $113 Construction Inspector 11 $90 Construction Inspector 1 $75 Environmental Scientist III $120 Regulatory Specialist $105 Manager Water Resources Designers/Technicians $102 Engineering Technician III $75 Engineering Technician II $70 Engineering Technician 1 $67 Administrative Technician 1 $60 DIRECT EXPENSES will be charged to the client in addition to the above quoted rates. Mileage will be charged at a rate of $0.50 per mile. Direct expenses include but are not limited to: testing, express mail costs, lodging and meals, provided that they are reasonable and necessary for the accomplishment of the work. Lodging and meals will be billed at the cost incurred by Lochmueller Group, Inc. These rates may be changed on an annual basis at the discretion of Lochmueller Group, Inc. W:\ADMINDOC\HOURLY RATES\2017\2017 HOURLY RATE INDY WATER RESOURCE.DOC Indy WaterResource 011117