HomeMy WebLinkAboutAgreement - 10th St. Pump Station AGREEMENT BETWEEN OWNER AND CONTRACTOR
AGREEMENT
THIS AGREEMENT, made this /: of fafv"a ri 201 4, by and between the Jeffersonville
Sanitary Sewer Board, hereinafter called "OWNER" and Pace Contracting, LLC. doing business as a •
corporation hereinafter called "CONTRACTOR ",
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned:
1. The CONTRACTOR. will commence and complete the Installation of the TideFlex
72 -in Checkmate Check Valve at the Tenth Street Pump Station CSO
Outfall.
2. The CONTRACTOR will furnish all of the material, supplies, tools, equipment, labor and
other services necessary for the construction and completion of the PROJECT described
in the Quote dated . December 17, 2013.
3. The CONTRACTOR will commence the work required by the Quote within 10 calendar
days after the date of this Agreement will reach substantial completion and within 30
calendar days unless the period for completion is extended otherwise by the OWNER.
4. The CONTRACTOR agrees to perform all of the WORK. described December
17, 2013 Quote submitted to the Wastewater Department.for the sum of 517,000.
6. The OWNER will pay to the CONTRACTOR in full after that work is satisfactorily
completed, and same is certified in writing to the OWNER.
7. The CONTRACTOR must pay its subcontractor for satisfactory performance no more
than 30 days from the prime contractor's receipt of payment from the OWNER.
8. This Agreement shall be binding upon all parties hereto and their respective heirs,
executors, administrators, successors, and assigns.
9. This Agreement may be terminated by either the OWNER. or the CONTRACTOR,
with or without cause, upon a thirty (30) day written notice to the other party. If
the Agreement is so terminated, the - Contractor shall be entitled to its contractual
compensation for all work performed up to the termination date.
7
. .
In WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by
their duly authorized officials, this Agreement in (triplicate) each of which shall be deemed
original on the date first above written.
OWNER:
Jeffersonvill SI Board
BY:
Name: id ( 4 1 i II i t h 1'
Title: playo c P f e_s
, Date: 1 ...... / /
ATTES . ..,. -
i
• _
BY:
Name: i
• •
Title: , eski"
CONTRACTOR
PACE Contraing, LLq. '
BY
Name: - Thir I„i
Title: /Min / d i21m .. ,6 eir.
Date: m ... :3
ATTEST: , -
, / ,
,,, I/ /
BY: .4/
/,,f.44.-
Name: /MI il/eeijrki
A I ,;
Title: (t.ii 5 S'
2
•
pace contracting IIc
200 willinger lane
jeffersonville, in 47130
812 - 283 -5784 p
812 - 283 -5795 f
tomwood@pacecontractingIIc.com
December 18, 2013
Len Ashack
Jeffersonville Wastewater Department
1420 Pennsylvania Avenue
Jeffersonville, IN 47130
Project: Tenth Street Pump Station
Junction Box 72 inch Duckbill Check Valve
Installation Quote
We offer this quote to install the owner - furnished 72 inch Duckbill Check Valve being
provided by BL Anderson, in the existing Tenth Street Pump Station Junction Box, per
the following scope of work and price:
1) Remove and replace the two precast concrete lids on the junction box
2) The lifting Tugs that attach to the embedded eyes are to be provided by
Jeffersonville. We supplied them on our previous project.
3) Haul the 72 inch check valve over to Tenth Street from the pipe yard
4) Hoist, Install and grout the check valve inside the 84 inch pipe
5) Provide any stainless steel anchors required
6) Asphalt repair as required
7) Final Grade and seed as required
8) Deal with flow in the junction box
Lump Sum Price: $17,000.00
Sincerely,
Tom Wood
Tenthstreet - duckbillquote