Loading...
HomeMy WebLinkAboutproposed reconstruction of 10th st from dutch to Reeds AMENDMENT NO. 4 TO THE AGREEMENT FOR PROFESSIONAL SERVICES DATED JULY 1, 2009 BETWEEN BERNARDIN, LOCHMUELLER AND ASSOCIATES, INC. HEREINAFTER REFERRED TO AS THE "CONSULTANT" AND THE CITY OF JEFFERSONVILLE ACTING BY AND THROUGH ITS PROPER OFFICIALS, HEREINAFTER REFERRED TO AS THE LOCAL PUBLIC AGENCY, FOR PRELIMINARY ENGINEERING DESIGN SERVICES FOR THE PROPOSED RECONSTRUCTION OF 10 STREET FROM DUTCH LANE /PENN STREET TO REEDS LANE. W I T N E S S E T H WHEREAS, LOCAL PUBLIC AGENCY and CONSULTANT did on July 1, 2009 enter into an Agreement to provide preliminary engineering design services for the proposed reconstruction of 10 Street from Dutch Lane /Penn Street to Reeds Lane, and did on May 27, 2011 enter into Amendment No. 1, and did on April 12, 2012 enter into Amendment No. 2, and did on July 13, 2012 enter into Amendment No. 3 to said Agreement, and WHEREAS, the project has advanced to a stage at which it has been determined that many of the "If Necessary" services will not be required, and WHEREAS, additional Permanent and Temporary Right of Way descriptions and Title Searches will be required over and above that which was originally anticipated, and WHEREAS, as a result of the Public Hearing, revisions will be required to several of the proposed right of way parcels, and WHEREAS, the LOCAL PUBLIC AGENCY desires to have the CONSULTANT provide the required additional Right of Way Engineering, and WHEREAS, the CONSULTANT has expressed a willingness to provide the required additional Right of Way Engineering, and WHEREAS, in order for the CONSULTANT to provide the additional services, it is necessary to amend the original Agreement, and NOW, THEREFORE, it is agreed by and between both parties that the original Agreement be amended as follows: CITY OF JEFFERSONVILLE PAGE 1 OF 4 AMENDMENT NO. 4 208 - 0045 -0HY W: \ACCNTING \CONTRACT \2080045 \AMEND N0 4T0 CITY 070113.DOC I. Section IV COMPENSATION under the Recitals is modified to read as follows: SECTION IV COMPENSATION. The LPA shall pay the CONSULTANT for the Services performed under this Contract as set forth in Appendix "D" which is herein attached to and made an integral part of this Contract. The maximum amount payable under this Contract shall not exceed $1,718,961.00. II. Items C.5a, C.8, and D.5 of Appendix "A" are deleted. III. Section 5 Services to be Provide (If Necessary) of Appendix "A" is modified to read as follows: S. Services to be Provided (IF NECESSARY) / The services noted as "If Necessary" and set forth in Section N.2.a above shall only be provided upon receipt of written authorization from the LOCAL PUBLIC AGENCY. IV. Section A.1 Appendix "D" is modified to read as follows: 1. The CONSULTANT shall receive as payment for the services performed under this Agreement the total fee not to exceed One Million Seven Hundred Eighteen Thousand Nine Hundred Sixty One Dollars ($1,718,961.00) unless a modification of this Agreement is approved in writing by the LOCAL PUBLIC AGENCY. V. Section A.2 of Appendix "D" is modified to read as follows: 2. The CONSULTANT shall receive compensation for providing the services set forth in Section B through Section Q, inclusive, and Section X of Appendix "A" on a lump sum basis in accordance with the following schedule: a. Topographic Survey Data Collection $139,600.00 b. Environmental Documentation — Categorical Exclusion $83,661.00 f. Water Resource /Stormwater Permitting i. 401 /404 /Rule 5 Permitting $32,100.00 g. Traffic Analysis $10,300.00 h. Design Plans — Field Check Design Phase, Final Tracings $568,100.00 Design Phase, Final Package Design Phase, Hydraulic Analysis and Traffic Maintenance j. Public Involvement $40,000.00 PAGE 2 OF 4 AMENDMENT NO. 4 PAG CITY OF JEFFERSONVILLE 208- 0045 -OHY W: \ACCNTING \CONTRACT\ 2080045 \AMEND NO 4 TO CITY 070113. DOC k. Utility Coordination $62,000.00 Traffic Signal Design $53,600.00 m. Traffic Signal Interconnect Study $6,200.00 n. Traffic Signal Interconnect System Design (IF NECESSARY) $11,100.00 o. Street Lighting Design $20,700.00 p. Construction Phase Services $19,800.00 q. Project Management $47,100.00 r. Sanitary Sewer Design $61,300.00 s. Rain Garden Design $63,400.00 VI. Sections A.5 and A.6 of Appendix "D" are modified to read as follows: 5. The CONSULTANT shall receive as payment for providing the services set forth in Section W of Appendix "A" of this Agreement the total fee not to exceed $470,000.00, unless an Amendment to this Agreement is approved in writing by the LOCAL PUBLIC AGENCY. 6. The CONSULTANT shall receive as payment for providing the Right -of -Way Engineering set forth in Section W of Appendix "A" of this Agreement based on the specific cost per unit multiplied by the actual units of work performed, in accordance with the following schedule: Quantity Unit Price Subtotal a. R/W Plans & Project Management 1 LSUM @ $16,922.00 $16,922.00 b. Permanent Legal Descriptions 125 Each @ $660.00 $82,500.00 Additional Permanent & c. 270 Each @ $337.00 $90,990.00 Temporary Legal Descriptions d. Transfer Documents 125 Each @ $75.00 $9,375.00 e. R/W Parcel Plats 125 Parcels @ $670.00 $83,750.00 f. R/W Staking 125 Parcels @ $325.00 $40,625.00 g. Title Search 133 Each @ $330.00 $43,890.00 h. Title Updates 125 Each @ $140.00 $17,500.00 i. Appraisal Problem Analysis 125 Each @ $200.00 $25,000.00 j. Revised Parcels 11 Each @ $1,350 $14,850 TOTAL $425,402.00 CITY OF JEFFERSONVILLE PAGE 3 OF 4 AMENDMENT NO. 4 W: \ACCNTING \CONTRACT\ 2080045 \AMEND N04 TO CITY 070113.DOC 208-0045-0 H Y Based on preliminary property owner research, it is estimated that the Right -of -Way Engineering will include 125 individual parcels. If the actual number of parcels is equal to or Tess than the anticipated 125 parcels, the total fee should not exceed the $425,402.00 indicated above. If, however, the number of parcels exceeds the 125 anticipated, the additional parcels shall be invoiced on a unit price basis per the unit prices shown above. In order to have funds available in the event that the total fee exceeds the $425,402.00, the total not to exceed fee shall be set at $470,000.00. Except as herein modified, changed and supplemented, all terms of the original Agreement dated July 1, 2010, Amendment No. 1 dated May 27, 2011, Amendment No. 2 dated April 12, 2012 and Amendment No. 3 dated July 13, 2012 shall continue in full force and affect. This Amendment No. 4 increases the not -to- exceed fee of $1,663,361.00 by $55,600.00 to a new not -to- exceed total of $1,718,961.00. IN TESTIMONY WHEREOF, the parties hereto have executed this Agreem nt. BERNARDIN, LOCHMUELLER AND ASSOCIATES, INC. CITY OF JEFF: RS9N ILLE BY BY Carl D. Camacho Michael Mcore, Mayor Indianapolis Office Manager ATTEST: ATTEST( BY BY �.,Gejk,, Mark L. Harrison, PE, LEED AP Vicki Conlin, Clerk Director of Water /Wastewater Services Ri [90) f 1A3 /PeZ3 � Date Date CITY OF JEFFERSONVILLE PAGE 4 OF 4 AMENDMENT NO. 4 W: \ACCNTI N G \CONTRACT \2080045 \AMEND NO 4 TO CITY 070113.DOC 2 08 -0 04 5 -0 H Y