PROJECT: Crums Lane Pump Station No. 1 Elimination
Work Order No. 2010 -6
OWNER: Jeffersonville Sewer Board
Original Work Order Date: August 5, 2010
Previous Inspection Work Order Amount: $80,000
CURRENT ISSUE:
In May 2013, the Sewer Board authorized T +C Contracting, Inc. to return to work on the Crums
Lane Interceptor Project. This project has started and stopped multiple times and has required
various investigations and efforts.
JTL is requesting an increase in the hourly budget for this project to allow for continued
construction observation and administration as the Contractor works to replace the deficient pipe
and complete the project. The proposed budget increase includes an allowance for the
Geotechnical Engineering Consultant to be on -site throughout the duration of the replacement of
the deficient pipe so that they may observe and document the soil conditions that are present.
PROPOSED AMENDMENT TO CONTRACT:
JTL proposes a budget increase of $55,000 to allow for inspection of this project based on the
Contractor's work schedule and for the continuation of this project.
Current Contract Sum $80,000
Proposed increase by this Amendment $55,000
New Contract Sum including this Amendment $135,000
Jacobi, Toombs & Lanz, Inc. proposes to continue to provide construction administration and
inspection services to complete this project as identified above with the requested hourly not -to-
exceed budget increase of $55,000.
If the proposed amendment is acceptable, please sign below to authorize us to complete this
project as identified.
Note: All other provisions of the original work order remain unchanged.
1829 E. Spring Street, Suite 201 124 Bell Ave 1060 N. Capitol Avenue, Ste E360 1400 South ls` Street
New Albany, IN 47150 Clarksville, I N 47129 Indianapolis, IN 46204 Louisville, KY 40208
812- 945 -9585 812- 945 -9585 317 - 829 -3474 502 -583 -5994
812 - 945 -6656 Fax 812- 945 -6656 Fax 317- 829 -3473 Fax 502 -583 -7321 Fax
New Albany, IA' • Clarksville, I • Indianapolis. IN • Louisville, KY
wwwjtleng.com
S: \projects \10086 - Crums Lane Interceptor (work order No. 2010 -6) \Documents\JTL Contract Inspection
Amendment.docx
Crums Lane Interceptor
Page 2 of 2
OWNER: CONSULTANT:
Jeffersonville Sewer Board Jacobi, Toombs, and Lanz, Inc.
Jeffersonville, Indiana 1829 E. Spring Street, Suite 201
500 Quartermaster COI New Albany, IN 47150
Jeffersonville, Indiana 4 130 (812) 945 -9585
(812) 285 -6400
By By 1 1111
Authorized Representative Jorge . L- z, P, ., Pres sent
Printed Name ; e I • e