Loading...
HomeMy WebLinkAboutagreement no. 3 veterans pkwy phase 2 s SUPPLEMENTAL AGREEMENT NO. 3 VETERANS PARKWAY, PHASE 2 CITY OF JEFFERSONVILLE DEPARTMENT OF REDEVELOPMENT JEFFERSONVILLE, INDIANA This Supplemental Agreement No. 3 made and entered into this day of 2013, by and between the Department of Redevelopment, City of Jeffersonville, (CLIENT), and Jacobi, Toombs and Lanz, Inc., Consulting Engineers, 1829 E. Spring Street, New Albany, Indiana, 47150, (CONSULTANT), WITNESSETH WHEREAS, the CLIENT and the CONSULTANT did, on January 31, 1996, enter into an agreement providing necessary Professional Engineering Services required in connection with the Planning, Design and Construction Supervision for the Intercity Road Project, which is now called Veterans Parkway, and, WHEREAS, the CLIENT and the CONSULTANT did, on September 12, 2007, enter into a supplemental agreement providing additional Professional Engineering Services required to complete this project, and, WHEREAS, the CLIENT and the CONSULTANT did, on July 7, 2010, enter into a supplemental agreement No. 2 providing additional Professional Engineering Services for a Noise Analysis and Geotechnical Investigation required to complete this project, and, WHEREAS, it has become necessary to add to the Professional Engineering Services required to complete this project to include the realignment of Charlestown Pike to connect to Holmans Lane approximately 450' to the south of the existing intersection, extend the sidewalk on the south side of Charlestown Pike to the realigned roadway, reduce the proposed width of Holmans Lane in order to incorporate decorative street lighting on both sides, and adjust the completion schedule due to the estimated begin construction date being in 2017, and, WHEREAS, the additional Engineering work required to complete this project is appropriate, and will result in an adjustment to the maximum fee. NOW THEREFORE, it is agreed by and between the parties hereto to the following additions or changes in the agreement: Section IV, COMPENSATION Under Paragraph IV.A Planning and Design, Subsection 3. Phase 2 Project: The total lump sum fee for the Planning and Design revisions and additions of the components of the Phase 2 project shall be increased from $346,375 to $485,375. The additional fee of $139,000 is for the following items: 5.\pro Veterans Parkway Phase 2\Documents \supplemental agree N. 3.doc A. Design Survey: $ 9,000 B. Design Calculations: $ 20,000 C. Geotechnical Investigation: $ 5,500 D. Abbreviated Engineer's Assessment: $ 4,000 E. Update Environmental Study: $ 33,500 F. Utility Coordination: $ 4,000 G. Plan Drawings: $ 30,000 H. Decorative Lighting Design and Plans: $ 28,000 I. Resubmittals to INDOT: $ 5,000 TOTAL ADDITIONAL FEE _ $139,000 EXCEPT as herein modified, charged and supplemented, all items of the original agreement dated January 31, 1996, the supplemental agreement dated September 12, 2007, and the supplemental agreement No. 2 dated July 7, 2010 shall continue in full force and effect. IN WITNESS WHEREOF, the parties hereto have made and executed this Supplemental Agreement No. 3 the day and year first mentioned above. CLIENT: CONSULTANT: City of Jeffersonville Jacobi, Toombs and Lanz, Inc. Department of Redevelopment Consulting Engineers Jeffersonville, Indiana 1829 E. Spring Street, Suite 201 500 Quartermaster Court New Albany, Indiana 47150 Jeffersonville, Indiana 47130 By: /6 /1' /'' By: .%rL • e • , - - . ; • - ` - - • r or: / I. L Tz, P. • ident , ' , f'4Q.4 1 11 , Witness: Witness: . Le S AA en-e4 4 rh.,' Thomas L. Schellenberg, P.E. Transportation Manage ' 5:\project5\960)r- Veterans Parkway Phase 2\Documents \supplemental agree N. 3.doc