HomeMy WebLinkAbout2013-OR-1ORDINANCE NO. 2013 -OR- I
BEFORE THE COMMON COUNCIL
FOR THE CITY OF JEFFERSONVILLE, INDIANA
AN ORDINANCE ESTABLISHING OF SIDEWALK FEE IN LIEU PROGRAM
AND THE NON -REVERTING SIDEWALK CONSTRUCTION FUND
WHEREAS, the City of Jeffersonville ("City") has adopted minimum development
standards requiring sidewalks in all new developments;
WHEREAS, occasionally a developer will request a waiver from constructing a
sidewalk due to issues such as a lack of connectivity or terrain;
WHEREAS, when a waiver is granted, the City loses an opportunity to improve
its pedestrian infrastructure while at the same time the City does not want to require
developers to construct cost prohibitive sidewalks in areas where such infrastructure
does not serve its intended purpose;
WHEREAS, the implementation of a sidewalk fee in lieu program would
adequately address the issue by allowing developers to pay a fee in lieu of constructing
sidewalks at which time the fees can be expended to fund a sidewalk project in a more
appropriate location;
WHEREAS, the Jeffersonville Department of Planning and Zoning has studied
this matter in effort to determine criteria for granting a sidewalk waiver, the fee
structures and the mechanisms for spending the in lieu funds;
WHEREAS, the Jeffersonville Planning Commission ("Commission") has
recommended the adoption and implementation of the sidewalk fee in lieu program
consistent with the terms set forth herein;
NOW THEREFORE BE IT ORDAINED by the Common Council for the City of
Jeffersonville that there hereby is established a fee in lieu sidewalk waiver program as
follows:
SECTION 1: PURPOSE
The purpose of the fee in lieu of sidewalk waiver program is to adequately
provide an alternative mechanism for developers to pay a fee in lieu of constructing
sidewalks when required by the development standards.
SECTION 2: ADMINISTRATION
The Jeffersonville Department of Planning and Zoning shall administer the fee
lieu of sidewalk waiver program. Any developers seeking eligibility s ine
application with the Department of Planning and Zoning. g Y hall make
SECTION 3: ELIGIBILITY
Eligibility of the fee in lieu sidewalk waiver program shall be determined by
Jeffersonville Planning Commission. The Planning Commission shall r i thea
re
applications at which time it shall consider the following criteria in determinin elieW all
for the fee in lieu of sidewalk program: 9 gibility
1. If it is determined by the Commission, upon the recommendation of the City
Engineer, that due to pending street or utility construction, or other factors,
would be in the best interest of the City that the sidewalk construction be
postponed based upon any of the following:
a) The sidewalk is proposed to be constructed within an existing right-of-way
where sufficient right-of-way or easement width does not exist or cannot
be dedicated to build the sidewalk;
b) The location is along a road scheduled for widening; or
c) A storm water drainage ditch or similar public facility prevents the
construction of a sidewalk and neither the facility nor the proposed
sidewalk can be reasonably relocated or altered to accommodate both the
facility and the sidewalk.
2 The location is not within 1,000 feet of an existing sidewalk on the same side
of the street.
3. The location is not within 2,500 feet (street distance) from an existingor
proposed school.
4. Significant street trees, a grand tree, or a protected tree would be removed to
provide a conventional sidewalk in the location.
5. Sidewalk construction is impractical due to topographical conditions or other
site constraints.
SECTION 4: FEE DETERMINATION AND PAYMENT
In the event the Planning Commission grants fee in lieu sidewalk waiver such
fees shall be determined on a case by case basis subject to the context of each site
involved based upon the following:
Sidewalk in lieu fees will be determined on a case by case
context of each site involved. The City Engineer will work with a basis subject to the
the in lieu fee prior to the applicants' projects beingconsideredapplicants to determine
Commission. The fees will be based on cost of the materials for
sby the Planning
only. Costs associated with preparing a site for sidewalk construction
construction
included. Applicants will agree to pay the fee during discussion of uctwill not be
Planning Commission. Fees must be paid in full prior to the Building
ldin project ssiwitthe
issuing a Certificate of Occupancy. The in lieu fee schedule is attached
Commissioner
ched as Exhibit "A".
SECTION 5: NON -REVERTING FUND
The "Non -Reverting Sidewalk Construction Fund" is hereby
established.
collected through the sidewalk fee in lieu program shall be kept separatefrom all other
All fees
monies and deposited into the "Non -Reverting Sidewalk Construction Fund." d."
SECTION 6: EXPENDITURE OF FEES
Funds deposited into the "Non -Reverting Sidewalk Construction Fund "
be
solely for sidewalk construction and rehabilitation that assists the shall"
nn used
City En
completing projects in the Jeffersonville Sidewalk Master Plan. Such funds eer ine
expended by the filing of a proper claim in issuance of a warrant for fymay be
Fiscal Officer after appropriation by the Common Council for the Cityof payment by the
Jeffersonville.
This ordinance shall be in full force and effect after its passa e bythe
Council and approval by the Mayor. g Common
V. ted For:
A
dorgOAri _Wer:
Voted Against:
77 At
AO w
PASSED AND ADOPTED by the Common Co ncil of the Cit
Clark Count, Indiana upon this day of Y of Jeffersonville,
2013.
ATTEST:
Vicki Conlin, Clerk
City of Jeffersonville
:16,41,
Connie Sellers, President
Jeffersonville Common Council
PRESENTED by me to the Mayor of the City of Jeffersonville
Indiana upon this day of ~"r1���,( Clark County,
2013.
Vicki Conlin, Clerk
City of Jeffersonville
SIGNED and APPROVED by
, 2013.
me
upon this day of
Mike Moore, Mayor
City of Jeffersonville
*fe
Jeffersonville and will be determined case by case by the City Engineer
EXHIBIT "A"
5 foot wide sidewalk (4" thick concrete)
$40.00 per linear
foot
5 foot wide sidewalk (brick)
$65.00 per linear
foot
Retaining wall
$28.00 per linear
foot
Railing
$1 1.50 per linear
foot
Curb and gutter
$17.30 per linear
foot
Wheelchair ramp without detectable warning
plates
$900.00
Wheelchair ramp with detectable warning
plates
$1,150.00