Loading...
HomeMy WebLinkAboutChange Order 10 CONTRACT CHANGE ORDER FORM TO: Pace Contracting CONTRACT CHANGE ORDER NO.: 10 DATE: 01/03/13 PROJECT NAME: Tenth Street Pump Station Expansion Project ORIGINAL CITY P.O. NO.: You are directed to make the following changes to this Contract: Provide the following changes to pump station operational controls: 1. Slide gates are changed from modulating format to three discrete positions— Maximum Open, Intermediate Open, and Minimum Open for each gate. There will be operator adjustable inputs for each of these gate positions, and the corresponding wet well levels that trigger them will be in the upper levels of the wet well so that they are not triggered unless the wet well is filling faster than the pumping. 2. A watchdog timer will monitor elapsed time for gates to arrive at the control - inputted gate positions rather than just full open and full closed positions, which will eliminate nuisance alarms. 3. The 36" plug valve will be programmed to close on falling flow setpoint, initially set at 5 mgd. II. The following referenced documents further describe the changes outlined in Paragraph I, and are to be considered part of this Change Order: Field Order No. 86 III. The changes result in the following adjustment of Contract Price and Contract Time: Contract Sum Prior to this Change Order $ 11,099,274.00 Contract Sum will be increase /decrease by this Change Order $ 6,222.53 New Contract Sum including this Change Order $ 11,105,496.53 Contract Time Prior to this Change Order Tuly 17, 2012 Substantial Completion Date December 13, 2012 Final Completion Date Net Increase /decrease resulting from this Change Order 8 Days Current Contract Time including this Change Order July 17, 2012 Substantial Completion Date December 21, 2012 Final Completion Date Jeffersonville, Indiana Additional Forms Supplemental to Agreement Form Tenth Street Pump Station Expansion 00 52 25 FIELD ORDER FORM TO: PACE CONTRACTING FIELD ORDER NO: 86 DATE: 10/8/2012 PROJECT NAME: Tenth Street Pump Station Expansion OWNER: CITY OF JEFFERSONVILLE PROJECT NO: 423098 You are hereby directed to execute promptly this Field Order which interprets the Contract Documents or orders minor changes in the Work without changing the Contract Sum or Contract Time. If you consider that a change in the Contract sum or Contract Time is required, please submit your itemized proposal to the Engineer immediately and before proceeding with this Work. If your proposal is found to be satisfactory and in proper order, this Field Order will, in that event, be superseded by a Change Order. Description: 1. Slide gates are changed from modulating format to three discrete positions— Maximum Open, Intermediate Open, and Minimum Open for each gate. There will be operator adjustable inputs for each of these gate positions, and the corresponding wet well levels that trigger them will be in the upper levels of the wet well so that they are not triggered unless the wet well is filling faster than the pumping. 2. A watchdog timer will monitor elapsed time for gates to arrive at the control- inputted gate positions rather than just full open and full closed positions, which will eliminate nuisance alarms. 3. The 36" plug valve will be programmed to close on falling flow setpoint, initially set at 5 mgd per Len. Attachment: Revised Functional Description, Rev. 4, 10 -4 -12. J eXrr y A ra.o(.v - o- v Project Manager, Construction Engineer By: Terry Anderson Date: 10/8/2012 Jeffersonville, Indiana Additional Forms Supplemental to Agreement Form Tenth Street Pump Station Expansion 00 52 25 0 00 0 0 0 0 0 v, 0 00 0 0 0 0 0 O O tri C i O O O O U o mss- 0 m to Cr) 00 00 Cr' 00 r) 1.4 76 to tom. 1!1 N i./1 i./1- t/}. O •cf1. o c.' 0 0 0 to o m 0 v_ 0 0 o in 0 o Lri 0 O tri 0 0 O N U o 0 m N -v)- Lo 00 c D a) c c c w t w 0 0 00 0 0 0 0 co co Lr) CO 4 1i >, 4 4 r-+ 0 vi o r-i 0 0 d c.0 w N rsi N (i) 00 C N -c CI) u 00 c c o c0 75 c O U tl0) U :F, ca) 4 -1 a . - '0 G C L m CO 00 4. 00 c L. O (0 C a a C CU ul 00 sJ d C 0) 0. 4- Ca 0 0 a) a) o LE 'O (Ni Q cr) a) � > > 00)) > c3 X 0 c a) c co fn 4 N a) o Y . 0) 0 � tl . I ,� 00 N L M c 4 O E W E . t - as L c O Q cn -0 G 00 ro (n w 0 Z 4 L in co (n 4 M) G c,. o . O 73 Q. a) i O (� D L iziC ca to cp N c 6 Iii (L) Ur « i* (II i iI- � < W W W Z E- O - t ry x-4 cv Cr) N tf) r - = REQUEST FOR QUOTE #26 - ' '4 :- , Pace Contracting, LLC Date: /111612012 I 200 Willinger Lane Job No. 1104 -1 Jeffersonville, Indiana 47130 Location: Jeffersonville, IN PZ94 Attn: Mr. Tom Wood COMMERCIAL RE: 10th Street Pump Station Expansion AND INDUSTRIAL Labor and material for installation as shown below: CONTRACTORS labor and material to revise wiring on the gas detection system 4, PLANT Foreman /Supervisor 0 hrs $60.42 $0.00 MAINTENANCE Journeyman 14 hrs c $54.25 $759.50 Apprentice 0 hrs © $40.04 $0.00 • Material See Attached $15.19 DESIGN /BUILD Sales Tax $0.00 Direct Job Expenses $0.00 Rental Equipment $0.00 INSTALLATION $774.69 Overhead 10% $0.00 AND SERVICE Profit 10% $77..47 Subtotal $852.16 Sub - contractor $0.00 Profit 10% $0.00 Subtotal $852.16 Bond 3% $25.56 TOTAL w; PHONE 7 44 AREA CODE 502 568.2030 FAX Acceptance: The above prices and specifications of the change order AREA CODE 502 are satisfactory and hereby accepted. Unless otherwise stipulated all 568.6072 work to be performed under the same terms and conditions as specified in the original contract /purchase order. Work will not proceed without written authorization to do so. Price is good for fifteen (15) days unless otherwise noted. MICHAEL W. WATSON 1515PANEMET LOUISVILLE, KENTUCKY 40206