HomeMy WebLinkAboutChange Order No. 7 CONTRACT CHANGE ORDER FORM TO: Pace Contracting CONTRACT CHANGE ORDER NO.: 7 DATE: 8/31/2012 PROJECT NAME: Tenth Street Pump Station Expansion Project ORIGINAL CITY P.O. NO.: I. You are directed to make the following changes to this Contract: ITEM AMOUNT ($) SCHEDULED ADJUSTMENT ( +) or ( -) DAYS 1. Time Extension $0.00 42 days II. The following referenced documents further describe the changes outlined in Paragraph I, and are to be considered part of this Change Order: Tenth Street Time Extension - Final III. The changes result in the following adjustment of Contract Price and Contract Time: Contract Sum Prior to this Change Order $ 11,050,606.00 Contract Sum will be increase /decrease by this Change Order $ 0.00 New Contract Sum including this Change Order $ 11,050,606.00 Contract Time Prior to this Change Order July 17, 2012 Substantial Completion Date August 31, 2012 Final Completion Date Net Increase /decrease resulting from this Change Order 42 Days Current Contract Time including this Change Order July 17, 2012 Substantial Completion Date October 12, 2012 Final Completion Date This Change Order is for full and final Settlement of all direct, indirect, impact costs and time extension incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes are The Above Changes are Recommended: Accepted: Approved: CH2M HILL Pace Contracting City of Jeffersonville Engineer Contractor Owner 401 W. Main St, Ste 500 200 Willinger Lane 500 Quartermaster Court Address Address dress Louisville, KY 40202 Jeffersonville, IN 47130 efferso v4 India a 47130 Cit State /Zip Cit tate /Zip (y.tatP By: B By: Phone: 02- 5$1-660, Phone: $'/ Z - 3 - 5 7 y Phone: Date: #307...- 31 (Z Date: Date: `-'- I '7 Jeffersonville, Indiana Additional Forms Supplemental to Agreement Form Tenth Street Pump Station Expansion 00 52 25 pace contracting, IIc 200 willinger lane Jeffersonville, in 47130 812 - 283 -5784 812 - 283 -5795 twood-pace@sbcglobal.net August 21, 2012 Jerry Anderson, PE CH2MHiIl Engineers 401 West Main Street, Suite 500 Louisville, KY 40202 Subject: Tenth Street Pump Station Expansion Time Extension We have encountered the following recent issues that are out of our control, and will not allow us to be 100 % complete by August 30, 2012. 1) Vandals broke into the site 2 weeks ago and stole aluminum safety grates for the wet well new hatch renovation, grating from the existing valve room walkway and platform, handrail from this same platform, checkered plate hatches and other metal they could sell for scrap. All of the missing items have been reordered and we are waiting on the safety grates and handrail - still. It should be in next week. 2) The two 36 inch stainless sluice gates change order - that we ordered to replace the damaged and corroded cast iron gates from the original construction - are not here, even though they were to ship on 8- 14 -12. We have been checking on them for over a week and are waiting for their delivery. 3) The Smart Building Panel PLC has gone bad twice and we cannot determine the cause. EFI is looking into this issue, but this keeps us from completing the controls coordination and training. We hope to have this figured out by next week. This hold up the final controls work. 4) The gas detector electrical lights and cables change order items are 5 to 6 week deliveries. They were released yesterday. 5) We still need to install the second yard hydrant and backflow preventor. The hydrant just arrived. 6) Our painter is working around the Crane America sub on the hoist and trolley rework - handled by the City direct. Pace is certainly anxious to finish. We pulled off the site with our forces yesterday to wait on enough parts to work steady. We are finish grading and painting with our subs now. The seeding of the site will be done on 8- 24 -12. The fence will be installed next week. We hope to have the remaining items on the current punchlist, completed by the end of next week, except for the items 1 — 6 noted above. Jeffersonville, Indiana Additional Forms Supplemental to Agreement Form Tenth Street Pump Station Expansion 00 52 25 I would say that due to the gas detector electrical long lead items, a final completion date including all field orders would be 6 weeks from today plus 2 weeks for gas detection installation. This equals a date of October 12, 2012. I would say that we will be gone from the site with everything but the gas detection change order and the two sluice gates that have not shipped - by 9/7/12. We will return around 10 -1 -12 to complete the gas detection and will come back to install the sluice gates whenever they arrive. Pace Contracting LLC will continue to be responsible for the operation of the pump station until we get the controls issue noted in item 3 above solved. At that time we will train for the controls, then turn the pump station over to the city to operate as designed. We ask that additional time be granted as requested above and that any potential for liquidated damages be removed. Tom Wood File- tenth- timeext -final Cc: Lee Blakeman Len Ashack Lee Pursley Jeffersonville, Indiana Additional Forms Supplemental to Agreement Form Tenth Street Pump Station Expansion 00 52 25