HomeMy WebLinkAboutLentzier Creek Pump Station, Gravity Interceptor & Force Main Design Project III Jacobi, Toombs & Lanz, Inc. I: C ons ul t i ng E ng i neers & Land S urveyors December 6, 2012 PROJECT: Lentzier Creek Pump Station, Gravity Interceptor & Force Main Design Project OWNER: Jeffersonville Sewer Board Original Contract Date: September 15, 2011 Original Contract Amount: $125,000 CURRENT ISSUES: 1. Engineering Design Changes - During the final design phase of the Lentzier Creek Pump Station, the City requested changes to the layout of the pumping station that altered the design of the wet well, valve vault and force main cross - connection structure. 2. Project Bidding - Near the completion of the project, it was determined that the projects would be better suited to be built in 3 separate phases. As such, this required separating the completed plans into 3 separate divisions and bidding 3 separate projects with separate specifications and contract documents. With this change, the bidding process was lengthened and the number of bids to be reviewed was increased. 3. Property Acquisition - During the property acquisition phase of this project, JTL and City representatives have met with various property owners and made extensive changes to easements and property acquisition for a successful completion of this project. 4. SRF Assistance & PER Modifications - During the PER review process of this project, numerous changes have occurred to satisfy SRF and environmental review agencies approval. Similarly, after bidding these projects, JTL prepared a Green Business Case for the Lentzier Creek Pump Station to seek a 0.5% reduction in the SRF loan interest rate for the entire project for a cost savings of more than $700,000. PROPOSED AMENDMENT TO CONTRACT: Below is a summary of the attached breakdown of additional costs incurred during the design of the Lentzier Creek Pump Station Project: 1. Engineering Changes $ 4,080 2. Project Bidding $22,292 3. Property Acquisition $ 5,225 4. PER/SRF Assistance $15,115 Total Proposed increase by this Amendment $46,712 1829 E. Spring Street, Suite 201 124 Bell Ave 1060 N. Capitol Avenue, Ste E360 1400 South 1s` Street New Albany, IN 47150 Clarksville, I N 47129 Indianapolis, IN 46204 Louisville, KY 40208 812 - 945 -9585 812 - 945 -9585 317 - 829 -3474 502 -583 -5994 812 - 945 -6656 Fax 812- 945 -6656 Fax 317-829-3473 Fax 502 -583 -7321 Fax Nov :Albany, IN Clarksville, IN . Irac iaanapola�, IN * Louisville, K.. www jtleng. corn S: \projects \11115 - Lentzier Creek \Documents \11115 Contract Amendment.docx Lentzier Creek Pump Station, Gravity Interceptor & Force Main Design Project Page 2 of 2 Proposed Revised Contract Amount $171,712 Jacobi, Toombs & Lanz, Inc. proposes to make the necessary revisions to complete this project as identified above with the requested lump sum contract amendment of $46,712. If the proposed amendment is acceptable, please sign below to authorize us to complete this project as identified. Note: All other provisions of the original work order remain unchanged. OWNER: CONSULTANT: Jeffersonville Sewer Board Jacobi, Toombs, and Lanz, Inc. Jeffersonville, Indiana 1829 E. Spring St., Suite 201 500 Quartermaster Court New Albany, Indiana 47150 Jeffersonville, Indiana 47130 (812) 288 -6646 (812) 285 -6400 B By Mayor Micha; I Moore, Preside t Jor' a I. L.-nz, P.E., Presal By IP _ - l2r/s_ - Witness Dale L. Orem, Member By OL, 013.se William A. Saeges , P.E., P.L.S., Member Or B Printed Name Authorized Representative