CURRENT ISSUES:
1. Engineering Design Changes - During the final design phase of the Lentzier Creek Pump
Station, the City requested changes to the layout of the pumping station that altered the design of
the wet well, valve vault and force main cross - connection structure.
2. Project Bidding - Near the completion of the project, it was determined that the projects
would be better suited to be built in 3 separate phases. As such, this required separating the
completed plans into 3 separate divisions and bidding 3 separate projects with separate
specifications and contract documents. With this change, the bidding process was lengthened
and the number of bids to be reviewed was increased.
3. Property Acquisition - During the property acquisition phase of this project, JTL and City
representatives have met with various property owners and made extensive changes to easements
and property acquisition for a successful completion of this project.
4. SRF Assistance & PER Modifications - During the PER review process of this project,
numerous changes have occurred to satisfy SRF and environmental review agencies approval.
Similarly, after bidding these projects, JTL prepared a Green Business Case for the Lentzier
Creek Pump Station to seek a 0.5% reduction in the SRF loan interest rate for the entire project
for a cost savings of more than $700,000.
PROPOSED AMENDMENT TO CONTRACT:
Below is a summary of the attached breakdown of additional costs incurred during the design of
the Lentzier Creek Pump Station Project:
1. Engineering Changes $ 4,080
2. Project Bidding $22,292
3. Property Acquisition $ 5,225
4. PER/SRF Assistance $15,115
Total Proposed increase by this Amendment $46,712
1829 E. Spring Street, Suite 201 124 Bell Ave 1060 N. Capitol Avenue, Ste E360 1400 South 1s` Street
New Albany, IN 47150 Clarksville, I N 47129 Indianapolis, IN 46204 Louisville, KY 40208
812 - 945 -9585 812 - 945 -9585 317 - 829 -3474 502 -583 -5994
812 - 945 -6656 Fax 812- 945 -6656 Fax 317-829-3473 Fax 502 -583 -7321 Fax
Nov :Albany, IN Clarksville, IN . Irac iaanapola�, IN * Louisville, K..
www jtleng. corn
S: \projects \11115 - Lentzier Creek \Documents \11115 Contract Amendment.docx
Lentzier Creek Pump Station, Gravity Interceptor & Force Main Design Project
Page 2 of 2
Proposed Revised Contract Amount $171,712
Jacobi, Toombs & Lanz, Inc. proposes to make the necessary revisions to complete this project
as identified above with the requested lump sum contract amendment of $46,712.
If the proposed amendment is acceptable, please sign below to authorize us to complete this
project as identified.
Note: All other provisions of the original work order remain unchanged.
OWNER: CONSULTANT:
Jeffersonville Sewer Board Jacobi, Toombs, and Lanz, Inc.
Jeffersonville, Indiana 1829 E. Spring St., Suite 201
500 Quartermaster Court New Albany, Indiana 47150
Jeffersonville, Indiana 47130 (812) 288 -6646
(812) 285 -6400
B By
Mayor Micha; I Moore, Preside t Jor' a I. L.-nz, P.E., Presal
By IP _ - l2r/s_ -
Witness
Dale L. Orem, Member
By OL, 013.se
William A. Saeges , P.E., P.L.S., Member
Or
B Printed Name
Authorized Representative