PROJECT: 8 Street Combined Sewer Separation Project
OWNER: Jeffersonville Sewer Board
Original Contract Amount: $1,234,497.00
Original Bid Amount: $1 ,237,497.00
CURRENT ISSUE:
There was an error in the Original Contract Amount for the 8 Street Combined Sewer project.
The Original Bid Amount for the contractor, TSI Paving, was $1,237,497.00. However, the
approved contract amount was for $1,234,497.00, a $3,000.00 difference. The discrepancy in
contract amount and bid amount(which has been paid in full to the contractor) has caused
complications with the grant administrator, River Hills, in trying to close out the project.
PROPOSED AMENDMENT TO CONTRACT:
Original Contract Amount $1,234,497.00
Proposed increase by this Amendment $3,000.00
New Contract Sum including this Amendment $1,237,497.00
If the proposed amendment is acceptable, please sign below to authorize us to complete this
project as identified.
Note: All project funds and expenses have been paid to the contractor. No additional funds are
required.
OWNER: CONTRACTOR:
Jeffersonville Sewer Board TSI Paving, Inc.
Jeffersonville, Indian • P.O. Box 1540
500 Quartermaster C • New Albany, Indiana 47151
Jeffersonville, I •ian- - 30 (812) 948 -6691
(812) 285 -6400
By By f -1 _
120 Bell Avenue 1060 N. Capitol Avenue, Ste E360 1400 South 1 Street
Clarksville, IN 47129 Indianapolis, IN 46204 Louisville, KY 40208
812 - 288 -6646 317- 829 -3474 502 -583 -5994
812- 288 -6656 Fax 317- 829 -3473 Fax 502 -583 -7321 Fax
www.itleng. com
S:lprojects110108 - 8th Street CSS1Documents110108- Contract Amendment 7- 13- 12.doc