Loading...
HomeMy WebLinkAboutSpring Street Pump Station ReplacementChange Order 3 s d' { CHANGE ORDER - EXTRA WORK AGREEMENT NO. 3 JOB NO. 09081 a Project Name: Spring Street Pump Station Replacement Owner: Jeffersonville Sewer Board r Contractor: Mac Construction & Excavating General Contract Additions 1 Lengthen Monorail Steel (MRC #6) $1,725.00 ' 2 Capping and closure of 12 & 18" Valves connected with TSPS FM (MRC #7) $5,827.00 3 Pump Float Modifications (MRC #8) $900.00 Subtotal $8,452.00 General Contract Deductions 1 Pay Item #6, Temporary Construction Fencing. Delete 80 LF @ $5.00 /LF - $400.00 2 Pay Item #7, Silt Fence. Delete 302.66 LF @ $1.50 /LF - $453.99 3 Pay Item 13.1, 24" Force Main Material. Delete 101 LF @ $51.35/LF - $5,186.35 4 Pay Item 13.2, 24" Force Main Installation. Delete 101 LF @ $38.65/LF - $3,903.65 1 5 Pay Item 14.1, Air Release Valves Material. Delete 1 EA @ $5,320.25 - $5,320.25 6 Pay Item 14.2, Air Release Valves Installation_ Delete 1 EA @ $2,679.75 - $2,679.75 7 Pay Item 15.1, 48" Class V RCP Sanitary Sewer Materials. Delete 9 LF @ $95.00 /LF - $855.00 8 Pay Item 15.2, 48" Class V RCP Sanitary Sewer Installation. Delete 9 LF @ $295.00/LF - $2,655.00 9 Pay Item 16.1 24" PVC Sanitary Sewer Materials. Delete 52 LF @ $39.56/LF - $2,057.12 1 10 Pay Item 16.2, 24" PVC Sanitary Sewer Installation. Delete 52 LF @ $76.44/LF - $3,974.88 11 Pay Item 17.1, 18" PVC Sanitary Sewer Materials. Delete 32.29 LF @ 20.01 /LF - $646.12 12 Pay Item 17.2,18" PVC Sanitary Sewer Installation. Delete 32.29 LF @ 147.99 - $4,778,60 13 Pay Item 19.1, Sanitary Sewer Manhole Materials. Delete 1 EA @ $2,323.00/EA - $2,323.00 14 Pay Item 19.2, Sanitary Sewer Manhole Installation. Delete 1 EA @ $2,577.00/EA - $2,577.00 15 Pay Item 25, Unidentified Rock Removal. Delete 100 CY @ $175.00/CY - $17,500.00 16 Pay Item 26, Undercut/Stabilization of Unsuitable Subgrade. Delete 100 CY @ $50.00 /CY - $5,000.00 17 Pay Item 29, Relocate B &G Asphalt Sewer Lateral. Delete 119 LF @ $7.00 /LF - $833.00 18 Pay Item 30, Relocate Flood Control Sewer Lateral. Delete 6 LF @ $20.00 /LF - $120.00 Subtotal - $61,263.71 Decrease in the amount of Fifty Two Thousand Eight Hundred and Eleven Dollars and Seventy One Cents ($52,811.71) Consulting Engineer Jacobi, Toombs &Lanz, Inc. : - b.-. LA,'(11. 9 (6112. En . neer's , ignature Date Owner's Approval: Jeffersonville Sewer Board ilj 0 9 /6 I/ 2_ r Signature of Owner s) Date Contractor's Approval: Mac Construction & Excavating ` • 8 ,30 -/a.. uth Represen 've Signature Date I