HomeMy WebLinkAbout2012-R-9 1
1
X ,
1
1
JEFFERSONVILLE REDEVELOPMENT COMMISSION
RESOLUTION NO. RC -1 -12
(Supplemental Resolution to Falls Landing —
Stormwater Conveyance System Bond Resolution
No RC- 35 -11)
WHEREAS, the Redevelopment Commission ( "Commission ") adopted Resolution No
RC-35-11 on December 21, 2011; and
4 WHEREAS, the Commission desires to supplement the Resolution RC -35 -11 by
1 clarifying additional components of the Project Description attached thereto as Exhibit A.
4
NOW, THEREFORE, BE IT RESOLVED BY THE JEFFERSONVILLE
REDEVELOPMENT COMMISSION, AS FOLLOWS:
1 1. There is hereby added to the Project Description contained in Exhibit A to
Resolution No RC -35 -11 the following:
Included within the above described project is a combined sewer
interceptor consisting of a large rectangular or circular pipe (with an
estimated size and hydraulic capacity of twelve (12) feet by eight (8) feet
running a distance of approximately 4,500 feet and approximately adjacent
to the above described stormwater conveyance system (the "Combined 1
Sewer Interceptor "), which Combined Sewer Interceptor is located in,
connected to or directly serves and benefits the Allocation Area
1
2. The addition provided in Section 1 is supplemental in nature and all other terms
and provisions of Resolution No. RC -35 -11 shall remain unchanged and in full force and effect.
4 3. This Resolution shall be in full force and effect immediately upon its passage and
signing. The Secretary of the Commission is hereby directed to deliver a certified copy hereof to
the Controller.
A dopted at the meeting of the Jeffersonville Redevelopment Commission this 25 day of °
April, 2012, at Jeffersonville, Indiana.
I
JEFFERSONVILLE REDEVELOPMENT
COMMISSION
i
Presi nt
Attest: 1
i
„----
i ---(1--- ,.. / /°..”
Secretary // 1670001
i
1
i