Loading...
HomeMy WebLinkAbout2012-R-9 1 1 X , 1 1 JEFFERSONVILLE REDEVELOPMENT COMMISSION RESOLUTION NO. RC -1 -12 (Supplemental Resolution to Falls Landing — Stormwater Conveyance System Bond Resolution No RC- 35 -11) WHEREAS, the Redevelopment Commission ( "Commission ") adopted Resolution No RC-35-11 on December 21, 2011; and 4 WHEREAS, the Commission desires to supplement the Resolution RC -35 -11 by 1 clarifying additional components of the Project Description attached thereto as Exhibit A. 4 NOW, THEREFORE, BE IT RESOLVED BY THE JEFFERSONVILLE REDEVELOPMENT COMMISSION, AS FOLLOWS: 1 1. There is hereby added to the Project Description contained in Exhibit A to Resolution No RC -35 -11 the following: Included within the above described project is a combined sewer interceptor consisting of a large rectangular or circular pipe (with an estimated size and hydraulic capacity of twelve (12) feet by eight (8) feet running a distance of approximately 4,500 feet and approximately adjacent to the above described stormwater conveyance system (the "Combined 1 Sewer Interceptor "), which Combined Sewer Interceptor is located in, connected to or directly serves and benefits the Allocation Area 1 2. The addition provided in Section 1 is supplemental in nature and all other terms and provisions of Resolution No. RC -35 -11 shall remain unchanged and in full force and effect. 4 3. This Resolution shall be in full force and effect immediately upon its passage and signing. The Secretary of the Commission is hereby directed to deliver a certified copy hereof to the Controller. A dopted at the meeting of the Jeffersonville Redevelopment Commission this 25 day of ° April, 2012, at Jeffersonville, Indiana. I JEFFERSONVILLE REDEVELOPMENT COMMISSION i Presi nt Attest: 1 i „---- i ---(1--- ,.. / /°..” Secretary // 1670001 i 1 i