HomeMy WebLinkAbout8th Street Combined Sewer Separation Project •
Jacobi, Toombs & Lanz, Inc.
Consulting Engineers & Land Surveyors
PROJECT: 8 Street Combined Sewer Separation Project
OWNER: Jeffersonville Sewer Board
Original Contract Date (Design & Inspection): October 14, 2010
Construction Inspection Contract Amount: $75,000
CURRENT ISSUE:
The Contract completion date for construction on the project was set for 150 days (5 months .
Six months have passed since the notice to proceed was issued to the Contractor and
approximately 1 month of construction work remains. As of December 19, 2011, JTL has m t
the maximum allowable amount that can be spent as a part of our "Time and Materials Basis'
contract for the inspection of this project.
PROPOSED AMENDMENT TO CONTRACT:
Original Contract Sum 575,000
Proposed increase by this Amendment 515,000
New Contract Sum including this Amendment S90,000
Estimated Construction Completion Date: January 20, 2012
Jacobi, Toombs & Lanz, Inc. proposes to continue providing construction inspection service- to
complete this project as identified above with the requested hourly not to exceed contract
amendment of 515,000.
I f the proposed amendment is acceptable, please sign below to authorize us to complete this
project as identified.
Note: All other provisions of the original work order remain unchanged.
OWNER: CONSULTANT:
Jeffersonville Sewer Board Jacobi, Toombs, and Lanz, Inc.
Jeffersonville, Indiana 120 = = Avenue
500 Quartermaster Court Claf svi = Indiana 47129
6
le, Indiana 47130 (81 .) 28: -6646
(812) Jeffersonville,
285.
(812) 285-6400
401
By By _del 4 a r
Jorge r . Lanz, •.E., Preside
120 8c11 Avenue 1060 N. Capitol A Ste 0360 1400 • tth I'S • a
Clarksville. IN 47129 Indianapolis. IN • _ ..,sville, KY • 1203
812 -2811-6646 317- 829 - 3474 502. 583 -5994
812 -2801-6656 Fax 317- 829 -3473 Fax 502-583-7321 F
www ttlfnp ro,n
..N'$HurI tIFPINX15120'J0108 Conan Amendment dot