HomeMy WebLinkAboutSprins Street Pump Station Replacement Extra Work Agreement No.1 CHANGE ORDER - EXTRA WORK AGREEMENT NO. 1 JOB NO. 09081
Project Name: Spring Street Pump Station Replacement
Owner: Jeffersonville Sewer Board
Contractor. Mac Construction & Excavating
General Contract Additions
1 Remove concrete encasement below existing influent line at SSPS 513,884.00
2 Additional Hatches & Modified Safety Grates 57,505.00
Subtotal $21,389.00
General Contract Deductions
1 Delete Installation of 793.4 If of 2C F.M. along Willinger Lane @ 541/11 (Installation Only) 532,529.40
532,529.40
This change order shall add a total of 5 contract days.
Decrease in the amount of Eleven Thousand One Hundred and Forty Dollars and Forty Cents ($11,140.40)
Consulting Engineer: Jacobi, Toombs & Lanz, Inc. D t% ,3111
Engineer's Signature Date
Owner's Approval: Jeffers 'le er Board/
t i 41 /7
Signs ire of w er(s) 0 e
Contractor's Approval: / Mac Construction & Excavating ��
'AOthorized Representative Signature Da e
1
I I
1
MAC
Construction & Excavating, Inc.
MAC REQUEST FOR CHANGE
TO Josh Hillman 2 ' Revised 1
NBC e
JBasbi, Toombs & Lao, kw. 10/11/11
DATE
211160
JOB Je
PROJECT: Spring Street PS & Sanitary Sewer & force Main
LOCATION: New Spring Street Pump Station
OWNER City Jeffersonville
DESCRIPTION: Due to concrete encasement on the existing 24" sewn that is in twnnict with the new
line "A" 18" line we our prosiding the following Wrap Sum pricing
It MAC is able to hoe ram oft the concrete encase without S8,583.00
damage to the existing 24" line the price is.
Should the hoe ram operation damage the existing 24" S18,884.00
Requiring a temporary repair the price Is
TOTAL
2 ADDITIONAL CONTRACT DAYS THIS MRC:
� /
AWNING!:
MAC CO & CA MATING, PIC.
OWNER: DATE APPROVED:
ARCHITECT C.O. J7 •
1908 Unrun t,uuu
P.O. Box 6787
New Albany, IN 47151-6787 "An Equal Opportunity Employer M/F,DN"
Phone 812-941-7895
Fax 812 - 941 -0699
Mgt
iRtfil
MEM
!II! !!!I!!!!!1 1311
i i : E� sir ; i % I 11111111 1111111
I 111 11 ME INS
1 : "
Diu ��
MAC
Construction & Excavating, Inc.
MAC REQUEST FOR CHANGE
TO: Josh Hillman - 2
MBC*
Jacobi, Toombs & Lanz, Inc. 10/28/11
DATE
211150
JOB 1
PROJECT: Spring Street PS & Sanitary Sewer it Fora Main
LDCAUIOit New Spring Street Pep Station
OWNNElt City Jefersoell e
DESCRIPTION: Price to field instal Aluminum safety grating on the (3) pump hatches & to provide (2)
New 36" x 36" hatches with Aluminum safety grating.
Retro fit the (3) Pump hatches with Aluminum safety grating $4,020.00
F &I (2) 48" x 48" aluminum hatches with AIrtnirt safety grating 53,485.00
TOTAL'
3 ADDITIONAL CONTRACT DAYS THIS LIRA
BY: Ap/J � ARp1ilECT:
r ^ 7 & EXCAVATING, INC.
OWNER: DATE APPROVED:
ARCHITECT C.O. #
1908 Unruh Court
P.O. Box 6787
New Albany. IN 47151 -6787 'An Equal Opportunity Employer MOON'
Phone 812 -941 -7895
Fax 812- 941 -0699
o O 0 lei:
0 m m p Y � Y ,l mb gS T r 1 m m m illhaO 0 ww v 33 0 ' 11 � °RRg 3 A S o S ` y 3 O �2 2 O n 0 3 9 -I au..au ° y y N 3 Y J m w m m m M w w w V 41 ' m w ++ N N 8
2 < w: .. .. gg p N O S.~ O a Y Y Y w w qW p d � OO y P y 1y O O V V b P g n 8 O y "i p N p m p m <O
r " r O 00 Z. 1' osg
0 O Op N3
e £ ; ; ° .a m
u" o as ro
n
AI y¢
O f O a =cE e
g 1111111111 11111111111111 =
Io' n r.
O o R C X R x I \ F l IllIllIl 1 1111111111111 ..r..:
co
4
lIlIlIPIlE IIIllIUHhIII2 - :
O c O = a
IliIiI!ll:
w m ° 4
c a
g ° o
X
woos eee
1.
T T co 0 e !IlIIIl
eeo
\ §\ I 0 |
� � « n *
' _ J ) / / , a | .
! �
ti
:,.1 a ! gQ28
% .• •• g
_ -- jQ23 � !
c,,
r
-
2 ) G
}}
. k % ... - - ��;
. ;; " 676
0 \ ' \
f § aI i� « ( \ : ( //Q \ '
* 1
g , } Q ! \ /
h ! ,
2'
..�.; . . ƒ
\ ;R!\ ) q • - - / / { ■.,, _,,
.
! _
0 •
0
.
/.; [. %.....�j
« | mt !
1!.4 \__ a |.)
2 \ k
\
£...ƒ $ !{
.. p= , $ G .
Josh Hillman
From: Glenn Jones (GlennJ @macconstruction.com]
Sent: Wednesday, October 26, 2011 11:48 AM
To: Josh Hillman
Cc: Mary Renton; Daniel Dase
Subject: Spring St. FM pipe needed for TSI
Josh,
The stationing we have is as follows.
MAC stopped at sta. 8 +97
Tie — in point at Hamburg Pike 16 +90.4
Total length 793.4 If
TSI will require (40)pieces of 20' DIP equaling 800 If plus (2 ea) 4S bends (2 ea) gripper gaskets (field lock)and (4 ea) meg
lugs
Glenn Jones
Project Manager
MAC Construction & Excavating, Inc.
(812) 941 -7895 office
(812) 941-5337
glenni@macconstruction.com